by NickHoff · 3y ago · 0 comments
I'm asking because whenever I look at ML training in the cloud, I never see any availability - either for this architecture or the A100s. AWS and GCP have quotas set to 0, lambda labs is usually sold out, paperspace has no capacity, etc. What we need isn't faster or bigger GPUs, it's _more_ GPUs.
I dont know why you would assume that. Qualcomm has been using TSMC N4 since last year [1]. I'm sure there are other customers as well.
[1] https://www.anandtech.com/show/17395/qualcomm-announces-snap...
Having said that, I don’t think we’re anywhere near some kind of equilibrium for AI compute. If chip supply would magically double tomorrow, then the large companies would buy it for their datacenters and have 100% utilization in a few weeks. They all want to train larger models and scale inference to more users.
We'll likely see more efficiency from bigger GPUs and hopefully more availability as a result.
There is a mode to attach 16 data pins to each GDDR chip, so with some extra effort you could probably double that to 48GB. Or at least 32GB. Maybe this is a valid niche, or maybe there isn't enough demand.
The alternative to this is HBM, which can stack up big amounts, but it's a lot more expensive.
Apple and their unified memory architecture may be the prod needed to get larger levels of RAM available to single cards solutions. We'll see.
Fabs can run multiple complex designs on the same line simultaneously by sharing common tools. For example, photolithography tools can have their reticles swapped out automatically. Obviously, there is a cost to the context switching and most designs cannot be run on the same line as others.
Ultimately, the smallest unit of fabrication capacity is probably best measured along grain of the lot/FOUP (<100 wafers).
The basic of Supply Chain and Supply and Demand, as you should have all witness during COVID for toilet rolls are the same.
Fab capacity is not that different to any other manufacturing. You just need to book those capacity way ahead of time. ( 6 - 9 months ) And that is also why I said 99% of news, or rumours about TSMC Capacity are pure BS.
So to answer your question. Yes, Nvidia will likely go for the higher margin products. One of the reason why you see Nvidia working with Samsung and Intel.
Take a look at a recent GPU and count the auxiliary components. All of them can cause supply chain difficulties.
For a science project, we need to manufacture magnets. It's not easy to find a company who has the right iron right now, and it's hard to get, with long lead times. The supply crisis is real.
Unless all the planet does is make silicon wafers; no.
My back of the napkin basically suggested that silicon production would need to 4x and fab capacity 4x (neither of which are happening) and NVDA with would have to capture all of that to justify their current price. I didn't bother writing it up, just looked at it mostly because I was on the wrong side of that play. It's something worth considering for sure.
It seems to me that yes while a 200 P/E may be high, they certainly could keep increasing the prices on the already high margin datacenter products, of which get quickly gobbled up by companies no matter what price they are because of the immense demand.
(n.b. that's really good work on your end and I agree with your conclusion, just idly musing about the thing that bugs me, what the heck all these non-leading edge fabs are going to do)