by 015UUZn8aEvW · 3y ago · 0 comments
The construction industry's fundamental constraint is that it manufactures products that are too big to fit in highway lanes. That means they can't be shipped from a centrally-located factory to their final destinations. So they need to be built at the site, which means they need to be built with more labor-intensive methods (since it's too expensive to build a capital-intensive factory for just one unit of output).
Building components that are small enough to fit in highway lanes, on the other hand, are manufactured in centrally-located, capital-intensive factories and shipped to their final destinations, just like cars or electronics. Think: boilers, doors, windows, air handlers, etc.
And, like cars and electronics, these building component products are manufactured by a small number of big companies, rather than a large number of small companies. The equilibrium capital investment and company size is much different when the product is small enough to be manufactured in a central location and shipped.
The first lesson to learn is that construction doesn't happen behind a laptop or on a phone. From your user's perspective, time spent fiddling with your app is time not spent on real work. So naturally you focus on selling to the "office workers" who spend more time on planning and administration. The problem with that segment is that the tools they already have are good enough. Construction projects always take far longer and cost far more than expected because of what's happening in the field, not because of what's happening in the office, so software simply isn't a bottleneck in this industry. The fact that your tool was specifically designed for their use case, or has an AR feature that allows them to walk the site virtually, or whatever -- it's cool, and you can get a few sales that way, but it's not going to result in better project economics, so it's not going to revolutionize anything.
The problem is that nobody can align the incentives of the tradespeople and the office folks when it comes to integrating into an information system together. You have to cross multiple organizational boundaries between owner, builder, contractor, and subcontractor of which very few people have a bottom up understanding. Mostly the people with the incentive to put everyone on a single platform (owner / builder) think very low of the tradespeople, which is why tradespeople are beginning to make more money than the accountants and PMs.
Exactly this. What you describe is basically the same as every ERP and CRM problem. In the end most of them all somewhat converged to SAP or SAP equivalent.
It takes a very specific and special sets of skills to align and understand both, if not all parties interest.
See, throwing a lot of nonsequiters together does not make a convincing argument that you know anything about what you’re talking about!
Ditto for most of the kitchen labor in big cities. Anthony Bourdain wrote about it extensively in the book that made him famous.
Both are the reason the middle class was able to eke it out for so long. Now the hacks aren't working and the money printer kept going brrrrrrrrrrrr and the average person can't afford jack.
Rent is low in construction as it is not tied to a particular location; you store the machines and tools anywhere.
Increasing the supply of labor will just ensure that the providers of capital get to keep more of the profit.
Also yes, I assume most of American buildings in the next 20-30 years will be built by foreign contractors using foreign labor.
a) What it says about lowest unique bid auctions [1] and reverse auctions [2] with multiple bidders and multiple auctioneers. That the auctioneers will often (?) take the lowest bid, even if it represents "unrealistic" based on the criteria of the auction (this seems especially relevant in contract procurement).
Especially though, that even in a market, with relatively "transparent" information (concrete costs this much, lumber costs this much, ect...) there's still not much consumer transparency on what "reasonable" prices for construction represent. And consumers or "auctioneers" are likely to just take the lowest number, like a lowest unique bid auction. Whether its lack of information, strong preference for lowest price, can't be bothered to check reasonableness, purposeful cost obfuscation, or some other issue.
b) That people often fall for sunk cost issues. Especially on big purchases. Gov't might drop $100k contract without much notice. Except a $10B contract? Just keep throwing good money after bad. Consumer might switch soap brands on a tiny price fluctuation. Except a $1M house? Just keep throwing good money after bad.
Australia's had a rash of collapses lately, and it's felt this way.[3] 2000 companies in two years, and reading along, lots of companies that basically said "Give us another $200k as a payment right now." ("Even though we know we won't be able to finish your house, because our financials are horrible.") Except buyers felt like they had to, because they already committed to an expensive project.
[1] https://en.wikipedia.org/wiki/Unique_bid_auction [2] https://en.wikipedia.org/wiki/Reverse_auction [3] https://www.9news.com.au/national/building-construction-comp...
As for people talking about "why is the software industry like that?" I have great personal anecdote that to me explains why. Years ago I was tasked with a small team (~5 people) on a software project. We all got together and spent a good solid 3 days on planning and estimation, and our estimate was something like 5 months. Sales team freaked out, they said they needed it next quarter, so we had 3 months. So we looked at our original estimates and tried to find ways where we could cut scope, and came back with a "well, if we cut out literally anything remotely non-critical, and pray a little, I guess we can say 3 months." When all was said and done, the project took nearly exactly 5 months, just with a ton more stress and worse quality.
So these days, I'm more wise to the ways of the world. If someone says "we need you to find a way to cut the schedule by 25%", I basically say "OK, we can cut scope, but in my experience it always takes the time of the original estimate anyway." So then when things eventually go over budget, I don't stress at all - I leave work at a normal time, and just say to myself "everyone knew how long this was going to take, we just wanted to pretend it wouldn't take that long."
A big reason software is chronically over budget is that people simply want to pretend it will take a shorter time than it actually does, but they also know there is some real value to everyone engaging in that "mass pretending" in the first place.
When in the heck did corporate America stop having men/women in the adult sense? I work in software/finance and it's disgusting the number of people who know better but don't have the backbone to stand their ground. People are too afraid of the mysterious ways of "blowback" by corporate whiners and politicians.
Yes, the whole planning estimation and slippage stress thing is just a form of mental abuse / gaslighting.
I worked with a GC who bragged about tripling the budget of a highschool build. If you are doing large projects the only way you're going to win is to be way off on bid day and to be good friends with the people who figure out the financing.
We can recognize all these problems with budgets - that sales is incentivized to sell under budget, and submit change orders or project renewals later to get more money. Yet why does this happen? Can a private company really compel a government to change a contract? If the government really wanted to, they could take steps to limit the budgets, sue, nationalize a business, etc... This brings concerns that a government could wield it's power to exploit private companies, but I don't think people would be that opposed to the idea of a government trying to save taxpayer money.
The core of the issue is actually cultural. In business circles, closing a sale is considered a "skill". Lying, cheating, bribery - these are all culturally laundered as a method of sales tactics, and businesses laud salesman that can close above all else. I would argue that this is a cornerstone of business culture, at least in the US.
I think this is the core of why bids are so far off, and even a core issue with the world economics. A large portion of business occurs in the "enterprise" space behind closed doors, and the sales process is very obfuscated. It is the opposite of a free transparent market. These deals occur behind closed doors, net salesman a bundle in commission, and fall apart when they have to be implemented.
Same as with software really.
The external factors are also a thing, material shortages or finding something unplanned that needs fixing (for renovations)
Cold, rain, or even local kids playing with not-yet-dry concrete can cause all sorts of issues.
Shortages of steel or wood, or a small accident that breaks something, can often set work back weeks. When I did welding I remember waiting around for for hours for more rebar to show up -- and you bet your ass we billed for that.
On one job some goober fell through an unfinished staircase due to it being mostly (but not totally) completed; it halted work and were down a skilled worker. IIRC dude cracked a few ribs and had shoulder problems, not sure if he got workers comp or disability -- but should have.
One a different gig someone kicked over all of the porta-pottys and turned on all of the outdoor faucets, creating a huge mess of poo and mud. Later on that job site someone stole a lot of copper, and I think at least 2 pallets of cinderblocks, as well as a non-trivial amount of fence.
Meanwhile, I've got an IT job now, and when it's cold and rainy I can sit at home and jam out lines of code as long as my wifi and HVAC mostly works.
For example, you don't know what's in the old wall (but you have a pretty good idea of the amount and odds but you don't mention that) and so you don't include it (because the other guy won't and you have to stay competitive). Instead of including in proportion to the odds. You then later go to the client with "uh oh, we need to fix that. It happens. What are you gonna do?" And the client accepts it. This is mind boggling. If that's not the signs of a thoroughly broken industry, I don't know what is.
Before someone mentions that it's the same for software, not it's not always like that. With experience we got very good at estimating each in a series of comparable projects. It's very possible to fail to estimate large one-off projects. It's very possible to get it right with series. And house building is a very repetitive business. They are all different, but only so different and they are all built of human-sized rooms.
But putting aside the various incentives and psychological reasons why people tend to underestimate, I think there is a mathematical reason too.
Most complex processes with a large number of varied tasks tend to follow a log-normal distribution or something similar. And a property of this law is that when you go faster than expected, you don't go faster by much, but if you are late, you are late by a lot.
So, imagine the guy who does the estimate is completely unbiased and competent and tells you how long it usually takes (the mode), then there is more than a 50% chance that it will take longer (the median is greater than the mode), and on average, it will be even worse (the average is greater than the median).
You make a budget but then one of suppliers drops out, so you find a new one that can do the job on such short notice but you pay the price for that. Also You always make the budget as tight as possible so that it is very attractive, but there are clauses so you know you can go over budget in certain ways.
Why Construction Projects Always Go Over Budget https://youtu.be/dOe_6vuaR_s
Do they usually? I don't know, but curious.
My only experience with the construction industry was the construction of my house and those of a few friends where I was able to follow along.
The cost was exactly as estimated a year+ earlier and the timeline was pretty much spot on except for weather-induced delays (can't blame them for mother nature).
The people I've seen complain about cost/delay are also those who changed their minds in the middle about details, so of course it caused delays and cost.
Compare that to auto manufacturing. Ford knows exactly what an F150 costs. They can then price for known profit within a range.
Site prep has unknown unknowns, as each site is different. Maybe there's an unexpected geologic condition, maybe the utilities won't connect without a fight, maybe the jurisdiction issues a building moratorium at the last minute. Most construction jobs won't get guaranteed pricing on materials, so any delay can change those prices, and then the client may prefer to change materials and then you may need different labor, etc.
Remodelling is full of even more unknown unknowns. Residential construction doesn't tend to have as-built drawings, and the design drawings, if available, may not have much connection to the structure as built. When you open up the walls and find surprises, that's going to increase costs.
Construction quotes are generally for no delay, no suprises, no changes. Good quotes will also include estimates in case of likely surprises, and how delay costs will be allocated and change costs and procedures.
Most jobs take bids and so many people hire the lowest bidder. Because of this, a lot of contractors price their bids as a best case scenario... Or they bid an exactly what was asked and nickel and dime for everything extra.
CAD software, and now the various BIM tools, make it more likely rather than less likely to go into cost/timeline overruns.
Way back in the olden times, drawing plans was extremely labor intensive. Draftsmen using pencil and pen are many, many times slower than drawing on the computer. Because of this strict and unforgiving hard limit, a lot more time was spent in the planning stage. Architect and owner would work for a long time to get all of the details and requirements together before anybody touched a sheet of mylar. Any changes needed to be minor, because erasing and redrawing was expensive and difficult.
Because of the manual drafting restriction, details depended very much on using knowledgeable and experienced tradesmen. This also applied to specifications. Specifications were a lot more general, and were heavily reused between projects, because retyping 200 pages on an IBM Selectric is also time consuming and expensive.
This selects for a high level of competency across the board.
Now, because it's so easy to make massive changes at the last minute, everybody is pushing things down the road. "We'll catch it in addendums," is the rule, not the exception. And one of the biggest problems is the interface between architect and owner. The owner has ALWAYS been slow to get their people together and make decisions. So you end up with a project out to bid, and they're just now making calls on AV equipment and the like.
And the professionals, the architects and engineers, tend to put more on the drawings, and more in the specs. And because of this, a lot will get missed, or overlooked, or ignored. The general contractor sprays their sub-contractors with the drawings and specs, and the attending billion addendums, and so things get lost.
Plus, nowadays, J. Random Guy with a truck and good patter is now a licensed plumbing sub-contractor, who gets the job because he underbid. So he is now deeply incentivized to interpret the drawings and specs in a way that what should have been caught in the bidding phase is now considered a change order, which the owner has to pay for.
TL;DR: the ability to work fast in the design phase does not necessarily translate to better results in the construction phase.
(This works for software as well. We're still using software that was hand-chiseled into clay hard drives by the Great Beards Of Yore, while software that was programmed with amazing syntax-highlighting IDEs with built-in AI is riddled with obscure bugs.)
The kind of artistic result achieved with true "do everything in triplicate" drafting and capturing one good performance, has fallen by the wayside when everything changes at the last moment. Movie budgets have become dominated with post-production, even when they make the effort to record in-camera scenes and effects.
And what I've noticed about illustration is the rise of a cargo cult of "the blind leading the blind" online akin to programmers who have only learned Bob Martin, driven by young people want to learn drawing digital-first, for some legitimate reasons, but also because of the gadgetry and because they want to cling to the undo button and use layers. But it's the same thing: most of the knowledge of drawing, like with every other trade, is tacit, motor-skills heavy and needs to be trained into muscle memory. Being very bad at getting the line you want and mashing undo to force your way through just means every project is frustrating.
And once you do cross that threshold and train it, having the undo and layers are nice additions, but predispose you to not do as much planning. Thus, much of digital illustration tends to have a formulaic quality to it: the artist could configure things all sorts of ways, but the overwhelming tendency is to drive towards excessive detail and excessive rendering, because the medium is an enabler for that and doesn't require you to think it through.
It seems like there are at least two problems software could solve here.
The first is that right now it takes effort for tradespeople to find work. They have to advertise or form relationships with general contractors etc. But then they have the incentive to draw out the work, because it's easier to extract more hours from this job than to do this job quickly and then have to find another one. Make it easier to match buyers and sellers so as soon as you finish a job you've got another one lined up and that incentive disappears, and maybe even goes the other way, because if you were the lowest bidder on a job you thought would take three days and you can get it done in two days, you still get paid what you bid. Which gives the general contractor more slack in the event of some other construction delays.
The second is efficiency. A lot of jobs are small and the major cost is travel time to the site. If you could get many contractors into the same system, you could do some optimizations there, by assigning jobs to whoever is nearest and minimizing the transportation costs, or letting contractors automatically adjust their bids based on their proximity. Which the contractors should like, because it reduces the travel time they don't get paid for.
Hmm. The government takes place in an office, doesn’t it?
Do you think a law could make construction faster and cheaper? A regulation? Change in policy? Non enforcement of existing policies? So no votes required? I don’t know, some of that could be extremely impactful and it could happen extremely quickly. Non enforcement of all sorts of regulations can happen in a stroke of a pen. Then, think of the impact of immigration policy on construction labor. Think of all the levels of government that could impact this, local state federal. With no votes whatsoever, no campaigning, none of that slowness.
I don’t know. You worked in this for 5 years. How could your takeaway be that construction doesn’t happen behind a laptop? Like I get the spirit of what you’re saying, poopooing AR whatevers, but I am just a layperson, and it’s just common sense that if the policy were “there’s no minimum wage” or “there’s no limit on immigration,” both of which can and do occur without legislation due to nonenforcement, dude, construction would get a lot cheaper and faster. And maybe that’s not software in your limited sense, but gig economy companies essentially achieved part of those specific policies I’m describing for all sorts of things. So c’mon, of course what happens in the office in every sense has the biggest impact on construction.
The biggest innovations to construction are probably to be had in better/faster/easier plumbing and electrical connections, making it faster and more reliable to install all the fixtures. Being able to plumb and install a whole bathroom in a couple of hours instead of most of a day while reducing the odds of needing rework would be a decent boost. We've seen some improvement in this already though with things like PEX and Wago, I imagine even more modular designs can improve this even more. The challenge with this is actually getting adoption and approval for some of this stuff.
So yeah, you're right, the new methods and parts make for very fast construction but the maintenance and repairability/reusability is trending toward zero.
Just like everything else these days, I guess.
Yes, this is the standard now for an number of reasons:
* because it is far easier to cut damaged sections of PVC on site and assemble replacements than it is to cut metal piping
* PVC is wildly less expensive than the equivalent length of metal piping, because it is used in a huge number of applications
* PVC is non-reactive and does not corrode like metal
and lastly, threaded pipe connections significantly decrease the throughput of a pipeline, reducing available water pressure at the endpoint. It is basic best practice to limit where threaded connections are used so that you can maintain uniform pressure across the whole unit.
Depending on jurisdiction, they can. In Germany, you can train to be an "Elektrofachkraft für festgelegte Tätigkeiten" - i.e. an electrician trains your staff to do a specific task, like hooking up the water heater.
The problem is, plumbers already have more than enough work. They could do that technically but they don't because they want to move to the next job site as fast as they can.
This is odd given that in a lot of places, a home owner can run their whole electrical, and the inspection is just a dude plugging shit in to the receptacles.
Also, are most modern water heaters not just a standard plug in? Even my dishwasher, which was a curiously long hold out, doesn’t have direct power any more.
Around here, home owners are not allowed to plumb, not even with inspection. Plumbing permits are only given to plumbers.
Well, cos they didn't get the license. There is nothing really stopping plumber from getting electrician's license.
I think there’s a massive opportunity in modular bathrooms. I’ve seen them done amazingly badly (think: the plastic cube badly perched in a corner of your Victorian seaside hotel, in which you have to crouch under the shower, while it hoses down the toilet paper), I’ve seen them done so well you wouldn’t have a clue you were in a room delivered in a box. The latter, I’ve only seen in Latvia, by a Latvian company - but I think the concept has legs.
This sort of thing: https://taplanes.co.uk/
These guys? (If so, then, woah, this is the first time in literally years that Google Search has successfully returned a first-result win.)
It's a bit different when the modules are part of a hotel/apartment block that's entirely built using a modular system. That's common enough in city centre hotels and motels where they're a single full-sized room and nobody can tell the difference.
If it became common I'm sure crews will switch to using a crane for the roof, just because the crane will be there to lift the bathroom in place anyway. However someone needs to start making the factory bathroom first and convince builders to use it.
There is more than that though, as the floor needs to be designed for where the pipes and wires of the prefab bathroom come out. Not impossible, but not easy either. A lot of modern houses are adjusted on sight for where the pipes have to be as the architect doesn't check if a pipe and beam are designed to go in the same place.. (in large building the architect will check, but not in something small.)
I'd also add Viega to the list, it is well accepted in many places and makes copper soldering unnecessary to join copper pipes in many applications by instead using a crimped fitting that only takes a few seconds to crimp with a power tool, it's a game changer for plumbers working with copper and even carbon steel pipes up to 4 inches in diameter.
(Asking for myself, because I agree with both of you - I hate having to open my lathe and plaster walls, but I also don't relish the idea of blatant access panels).
Maybe 8"x8" panels with electrical receptacles and data ports integrated so they're also functional...
A single story home does make some things simple, but it is still a pain with the insulation. On top of that, all the old plumbing goes through the slab making access difficult.
This make plumbing and wiring easier to repair; vermin easier to ensnare; improve safety from wildfires; and force every window to be a nice bay window with seating.
Cue an increase in the number of DIYers and toddlers needing to be rescued after they have somehow managed to fall into the gap e.g. while working / playing in the attic.
Not sure how it would work from an insulation perspective, either.
Not sure if that’s a Japanese design, or where it came from.
Don't forget the even earlier: https://en.wikipedia.org/wiki/Lustron_house
Saying that, in the early 20th century there wasn't too much to the electrical and the house probably had basic plumbing for a single bathroom and a kitchen sink plus radiators and a boiler that was probably onsite oil fed. A modern home has far more to consider including insulation, far more electrical and plumbing, HVAC, etc.
I think maybe 90% of the benefit could be had by simply having good, efficient design in the first place with the same traditional connections. It is unbelievable how much quicker it is to build when all the plumbing is stacked within a small footprint, rather than running all over the place.
If it is just "mold plastic differently so it can be put together quickly" and doesn't add much cost, it is worth it, but if you prefab walls cost more than raw materials + labour to build something similar... and on top of that are less elastic (just certain width and height etc.).
In retrospect, doing the job myself that way wouldn't have been too bad. The sharkbite connectors seem pretty reliable. I used some when I first bought this place and they've been installed for about 20 years now. I still prefer the traditional sweat joints, but maybe it's just not worth the investment of time?
I wonder if any builders are using this approach - solder in the crawl space and behind drywall, but shark bite in accessible areas.
It is much more convenient and I highly doubt anybody that can splice a couple of wires sees that ability as a means to keep the competition out. But there are drawbacks and you should be aware of them. When doing high current and tri-phase connections I will use a wire nut, otherwise I use a Wago.
But I'm with you, I'm happy with Wago. When I'm doing the work myself, that's what I use. Though I do use wire nuts for my big wire connections (6 awg). They probably don't even have lever nuts for that size, but I didn't look.
Having said that, it definitely has limitations. There’s a lot more structure in the modules which means more material overall and makes it harder to fit in services. You’re also limited architecturally.
Modular is mature technology and would have taken over the whole industry decades ago if it was actually a lot better.
There are a lot of people who don't want their friends to know their McMansion was delivered on a bunch of trailers.
I think manufactured homes would be more palatable if they stick-built certain parts of them. The big one being the roof. Instead of the low overhang, low slope design that works well for transport, ship them as roofless boxes and then do the roof on-site.
Of course, the problem with that is that a manufactured home isn't -that- much cheaper when you're done, so any kind of manual labor to make it prettier will close that gap quickly.
I think it would have taken over if it was cheaper. But for larger size buildings it isn't and that's what I think stops larger scale adoption. But they are faster to deploy.
Do you mean a skeleton laid on already poured foundations with water/sewage/electricity drawn, and ready for finishing after this weekend? finishing, carpentry, windows, internal plumbing and electricity takes a lot more to complete than the skeleton itself.
You just "plug in" each room to the central connections.
Slightly OT, but I feel like this is a general trend and definitely not limited to construction. There are many companies and founders aiming to 'disrupt' an industry, and a starting out with what only can be defined as arrogance. Seeing some of the startup companies in the sector i'm familiar with trying to explain how the world works to some of the most experienced and established players has been hilarious and infuriating at the same time. At this point, I finally understood where the derogatory meaning of 'techbro' comes from.
The main thing that concerns me is that people still believe technology (primarily software) is the solution to any problem we encounter. Yes, technology solved many problems in the past, but it also created a lot and failed in spectacular ways. If you need a solution to an acute problem, waiting for a technology to hopefully be developed isn't the right call. However, more and more people, governments and companies are buying into that idea. I can't fail to notice many people who where technology skeptic years ago now turned towards a "I don't want to change my behavior, technology will find a problem that solves the issues I cause with it". Autonomous cars are my prime topic that comes to mind, but many other things also come to mind.
But then I realized this is the natural push/pull of conservatism against progress. Incumbents get old and conservative. New companies crop up and try to do things differently. Sometimes the new ideas are stupid, and incumbents are right--the tried and true really is best.
Other times, the incumbents have become so bureaucratic, slow, and out of touch with what matters (customers), that a new company can come in, do things dramatically better, and burn an old competitor down.
Macro-wise, I think we should be glad for this. It's very hard to tell what will and won't work at the beginning. VCs get paid a lot of money for trying to guess this and even they can't get it right. I myself have been surprised many, many times when an idea I thought was incredibly stupid, turned out to have legs.
One way to change your mind on this, write down your predictions about what companies/approaches/techniques will/won't work 10 years from now. If you do this say, once/year, and you're honest, you'll see how hilariously bad you, and more or less everyone else actually is, at predicting the future and knowing what will and won't work. Sometimes you really do just have to try it, and see what happens.
I work in aerospace and whenever a post is related to aerospace here I expect to see several “why don’t they just <do x which they already do or do y which is easy to discredit>..” comments as if nobody else was smart enough to think of it. I favorite these comments for some reason. Not surprised to see the same thing happens in other fields.
Humble people don't say to themselves "I think I can do this better, so I'm going to disrupt the industry."
It's still a small % of houses built, but it's very cost effective and getting better (and more common)
european companies will build prefab exterior enclosure to retrofit old construction without displacing residents https://www.sciencedirect.com/science/article/abs/pii/S03787...
New construction:
Integrated Project Delivery - AI could solve the problem of aligning stakeholders possibly
Applying scrum/lean to construction -
BIM - there is a lot of data in a building and BIM standards are putting everything into one file,
digital twins: lidar and cameras and ai are all getting better where high accuracy scans can create as built digital twins while referencing BIM file to build it.
lifecycle analysis and building automation: precooling and preheating spaces, I believe we should have better rubric for valuing existing properties eg a window is an asset and a liability (many owners do not account for replacement costs leading to buildings in disrepair)
skilled labor - mixed reality education: if there is a digital twin then worker could use augmented reality to see preferred methods to make that happen while being credentialed and upskilling (crazy brick facades become possible)
Hadrian robot competitors: crane placing concrete blocks autonomously
This is the same problem that plagues electric car startups. Most of these folks don't know what they don't know. Tesla has had great engineering from day one, but almost went under because it couldn't figure out large scale manufacturing and logistics. Problems that old school companies have been solving for a century.
Tesla started from scratch and developed large-scale manufacturing and logistics from first principles. It was hard, but it's put them in a hugely advantageous position today. It turns out old-school manufacturing for ICE vehicles doesn't translate directly to EVs. Yes, Ford (for example) can build EVs, but they're not cost competitive with Tesla, because they're optimized for something else. Tesla produces 100x as many EVs as anybody else.
Now, was Tesla surprised by the difficulty of manufacturing, because they didn't know what they didn't know? Maybe, I have no idea. But in retrospect, it wasn't a mistake to ignore the accumulated wisdom of the car industry. It turns out the old-school companies don't know what they don't know either.
1. Elon thought they were smart enough to build cars with more robots and less humans than other manufactures. When this didn't work out, then swung to the other extreme and were employing far more workers than you would find at comparable plants.
2. Do you remember when Elon was tweeting about a national car hauler shortage, and that Tesla would start building it's own trailers? Tesla was the only manufacture having troubles with deliveries.
3. Have you watched the Sandy Monroe videos where they tear down vehicles? He has compared the build quality to 90's era Kias.
In the end (current time), didn't they (Tesla) find a better way?
I am truly ignorant here, but based on what I have read, Teslas manufacturing process now is much more efficient/better than the standard GM/Ford, etc...
Perhaps this is a regional/national thing (I sometimes get the feeling that "prefab" is a condescending term in the US sometimes). For reference, here's a page showing the selection from one of Sweden's main house manufacturers [1]. It's in Swedish, but I just wanted to share the pictures. Also it's hard to say exactly what proportion of a house is pre-built, but I expect the majority of the structural things (walls, floors, roof) to be.
https://en.wikipedia.org/wiki/Huf_Haus
According to this random web page, there are quite a few manufacturers:
https://medium.com/blue-future-partners/our-9-favourite-germ...
Brian Potter has some articles: https://www.construction-physics.com/p/why-are-there-so-few-...
Does construction ever get cheaper? https://www.construction-physics.com/p/does-construction-eve...
This is all done using computer-controlled manufacturing equipment, much of which is imported from Europe, where they are much more advanced on this front than in the U.S. One of the advantages of having computer controlled nail guns and vaccuum operated "wall flippers" is that the construction tolerances are far tighter than if you have humans nailing in the shingles, sometimes while on a ladder 15 feet above the ground.
The downside, of course, is that they only today have their one factory in New Hampshire, and while the walls can be shipped trucks on highways, if you want to build a large, luxury pre-fab home in Arizona, the trucks have to travel a long way, and that adds to the cost. This hasn't stopped some of their customers, though. Take a look at their web site for some example houses that they have built --- it's a far cry from what most people think of when they hear about "pre-manufactured houses". These are not trailer park homes!
Should you look at the fragmented composition of participating professions, fragmented nature of players and organizations involved, the fragmented and fluid supply chain, all combined with the long realization phase and complicated responsibility (legal) relationships of the actors perhaps? Generic contracting is more like a conductor role for the numerous groups involved, be it joined or independent ventures, than a subject of startup 'disruption'. Management, including financial.
Sub tasks will see some unicorns, but not much though, mostly in software area. The opensystemslab.io comes to mind as one construction adjacent one concerning the structral components mostly, but with systematic vision and novel mentality.
This approach is not quite as efficient as it initially appears:
First, it does nothing for the site construction (grading, excavation, utilities, paving, septic, well, etc.) Those tasks, which make up a decent portion of the project, are done in exactly the same way as in conventional construction.
Second, the modular boxes are either A) the width of shipping containers, which severely constrains the house layout, or B) somewhat wider than shipping containers, which makes them oversized loads that require escort vehicles, highway permits...increasing cost.
Third, you have to hire a crane to set the boxes, and then make all of the connections between the boxes, and install various mechanical and electrical components, complete the finishes, install staircases, etc. This costs quite a bit and still involves the hiring of various local subcontractors, just like in conventional construction.
When you add everything up, modular sometimes saves a little money and often reduces the project timeline (unless there are delays at the factory). But it's not a massive improvement, which is why modular hasn't taken over everything.
Aside from customer expectations for customizability in the US (and other countries) I believe regulations also contribute, with prefab homes actually requiring more robust construction than conventionally built homes.
[1] https://builtoffsite.com.au/emag/issue-05/sweden-became-home...
I would not want to live in a house whose builders took an “innovative” approach to dealing with “regulation”. Building codes are often written in blood.
Not everyone is so rich. People should have the choice about whether or not they want an unnecessarily expensive house. Regulations assume one size fits all and that everyone wants the same thing This isn't true. and trying to outlaw poverty doesn't work, it just makes things worse.
I wouldn't want to live in a house that was unnecessarily complicated to point of doubling it's cost just because of endless regulations forced vast increases in costs. You should see one of the links shared above: it talks a great deal about what's driving the increased costs in housing and it's all to do with increased building complexity, much driven by regulation.
Similarly, the 2021 IRC now requires a surge protective device at the service entrance. This doesn't protect anyone's life, and may protect your TV or cable modem if you live in a lightning-prone area. Its cost-effectiveness decreases in areas that don't get lightning strikes.
I think it's OK for the government to establish a floor on the quality of things, as long as they do it with the understanding that nothing happens for free, everything is a tradeoff, and better things cost more. So it's generally preferable when the legal floor is mostly focused on safety (where the tradeoff to something cheaper could be someone's life or limb), but more questionable when it's for things that don't relate to safety, where it would be better to let the individual make the tradeoff for themselves.
Regulations don't assume one size fit all, rather they tell you the minimum standard you must meet to participate in this, at least in our society.
If you think egress requirements and insulation requirements are too restrictive for you, then you don't belong in an industry that builds where you live and work.
The Titan submersible didn't violate "regulations", though, it violated industry standards. Standards that are updated more often than regulations. In so doing, it it was denied a certification. Since it operated in international waters only, there were no applicable regulations to evade.
Regulatory bodies which are poorly funded may write overly restrictive rules because they don't have the resources to do a more comprehensive assessment. In particular, many HUD rules are split into "single-family houses" and "everything else", with little consideration for small apartment buildings, townhouses and other "missing middle". The requirements for houses are much less strict than for apartments, and construction costs per square foot are correspondingly lower for detached single-family homes.
If you live in a detached SFH built after 1970, it's arguable that you already live in a structure where the builders took an "innovative" approach to dealing with regulations, because it was built to the lower house standards and not the stricter apartment standards. And if it was built before the 1970s, the regulations were probably very lax.
Nonetheless, I think the solution must be to reexamine the regulations, rather than evade them. But this "written in blood" is a thought-terminating cliche that prevents progress.
Regulation is just an enabler of laziness.
This is why I believe the future of construction is portable 3d printing. Imagine a 3D printer which fits on a truck, yet can be assembled in an hour and can print something the size of a large house from fiber-embedded cement. The printer would have nozzles for paint, foam, tar, electrical wire and PET plastic. It would also have a scoop to remove soil.
A team would drive the truck to the worksite, assemble the printer, start it going, and come back in 2-3 days when it was done. The printer would dig foundations, lay a fiber-cement foundation, damp proofing tar layer, build double skinned walls with foam between, paint the inside and out, install wiring and pipes, and build a foam, cement and tar roof. The house would have premade cupboards, bathtub, washbasin, etc.
Humans would come back to fit carpets, electrical outlets+fusebox, appliances, windows, vacuum formed liners in the bath/washbasins, etc.
You lost me there. I’m guessing you’ve never had to deal with rocky New England soil and non-flat grades. I’m sure many other regions have their own challenges, such as water tables and custom insulation requirements.
Even a tiny creature like an ant can dig holes in tough soil. A machine can too as long as it has feedback (ie. it can see the rocks and keep digging around and bashing till it comes lose.)
> non-flat grades
Well you dig it till it is the same shape as the plan...
> water tables
Either lay the concrete underwater (most concrete can be laid underwater) or dewater with a pump on the end of the actuator arm.
All of these problems just lead to increased build time. Obviously your machine is quite expensive - so if it takes 2 extra days of machine time to build a house on a steep grade in rocks, then thats gonna cost more, and at some point might make it not worth it.
> Well you dig it till it is the same shape as the plan...
That’s not how it works. Either the surrounding property needs to be regraded, in which case you’d still be forced to use excavation equipment, or you’re making an even more complex machine to be able to support building things like walk out basements on a custom grade. In the case of basements there’s simply a lot of volume of material that would need to be either removed out of a lot or just moved within the lot. Again, still needs excavation equipment to do that. The same excavation equipment that can dig out a foundation within hours and is perfectly adept at dealing with boulders.
A machine to handle other parts of the job such as foundation pouring might be viable. I’m just saying that a magical machine that can do it all if left alone for a few days is wishful thinking.
I predict that that won't matter eventually though, because over time, the cost of human labor goes up and the cost of materials goes down (relatively). That means anything that reduces the labor cost to build a house will always eventually happen, even if more materials are needed (unless another technique reduces the labor further first).
I would go for the printer being far less weight by making the whole thing a cable truss and winch structure. That should cut the hardware cost in half or better, like the way a travelling circus tent can be assembled entirely without a crane, yet packs into a tiny box. The downside is you can no longer assume a rigid structure, so you need cameras and alignment marks for precise positioning - but you probably needed them anyway. You also can't make any accelerations above 1G, but that should be fine for housebuilding.
And obviously, their design only makes the walls, but I would want to do foundations, roof, insulation, plumbing and electricals all with the same machine.
The elaborate on your idea, there are a couple startups that do work in "real estate" if you can even call it that, they ship ready-made prefab aimed at people looking for separate mancave/home office from the actual home.[1] Those are things you can ship in highways and load in with a crane. But that's about it. These startups had their boom during COVID but you don't hear much about them now.
[1] https://www.dwell.com/article/prefab-home-office-accessory-d...
As a whole, yes. But there are a number of companies that are building segments (walls) in a factory and then shipping those to be craned-in like Lego® blocks. Some factory tour videos:
* https://www.youtube.com/watch?v=r-RTlbv84T8
I like ti watch these houses go up: the walls & roof trusses are all laminate and come in to the job site in segments. It's takes a crew of 2–4 (depending on the size of the house) about 4 days to assemble the exterior.
The interior is about 50% 'modular', and the rest is traditionally framed. It's pretty insane.
Have humans in the loop to clear the land and drive construction materials to the site, but build the rest with robots that can work through the night and faster than any human, constructing the same template again and again in different lots?
Sure, bureaucracy is a major bottleneck, but it's not like human construction finished within a month...
I'm not saying it's a simple problem to solve, nor one whose solution I have fully mapped out in my head. Just that it's a problem whose solution strikes me as being within the realm of feasibility.
Edit: I imagine though, that in locations where building is regulated under the international residential code. There has been less investment, it only in the last few years added an appendix for mud/cob construction... So you can add regulatory cost on top of the actual robotics involved.
SAM, one robot, a dozen engineers in the race to revolutionize the way we build (https://www.audible.com/pd/1797102168)
It does not really support your hypothesis, instead giving a bunch of examples of inertia, which collectively make it extremely difficult to demonstrate a return on investment
There are modular homes that are shipped on highways, usually in sections.
And therein lies the problem.
The guys that work in construction aren't "dumb". They're most likely way way *waaaay* smarter than you, particularly about construction, but maybe not so much about the computer industry.
Guess what? Construction is absolutely nothing like the computer industry, and nothing the techbros know about it remotely maps onto construction.
And that’s just one component of a building.
Buildings are not simple things…
Building a bookshelf is SO much harder than software, and that's WITH clamp on guides, power tools, and pocket screws, giving myself every possible advantage. Things like painting, skateboarding, or guitar are an order of magnitude beyond even that, I can't even imagine what it would be like to be able to do those.
Software can easily become kind of a useless toy or hyper niche thing, unless the whole field can be changed to make it work like software does(Like how money and shopping is done, where every process has been changed to work with the software).
Once you change the whole field, stuff gets easy, otherwise, you're just spending all your time translating between paper notes and digital files, which are useless because there's no management system to do anything with the files, so they just sit there till someone has to run to the computer to check them.....
And it is looking quite shortsighted and unsustainable for software too.