by Retric · 3y ago · 0 comments
Ignoring interest for those 7 years and all other costs just the overage is insane. 17 billion / ( 1,100,000 kW * 90% capacity factor * 24 hour * 365 days * 50 years) = 4 cents per kWh. Add interest etc and someone lost an incredible amount of money on this project.
All roads lead to Ratepayers (electrical customers).
> Georgia Power’s residential customers are projected to pay more than $926 apiece as part of an ongoing finance charge and elected public service commissioners have approved a rate increase. Residential customers will pay $4 more per month as soon as the third unit begins generating power. That could hit bills in August, two months after residential customers saw a $16-a-month increase to pay for higher fuel costs.
> The high construction costs have wiped out any future benefit from low nuclear fuel costs in the future, experts have repeatedly testified before commissioners.
> “The cost increases and schedule delays have completely eliminated any benefit on a life-cycle cost basis,” Tom Newsome, director of utility finance for the commission, testified Thursday in a Georgia Public Service Commission hearing examining spending.
> The utility will face a fight from longtime opponents of the plant, many of whom note that power generated from solar and wind would be cheaper. They say letting Georgia Power make ratepayers pay for mistakes will unfairly bolster the utility’s profits.
> “While capital-intensive and expensive projects may benefit Georgia Power’s shareholders who have enjoyed record profits throughout Vogtle’s beleaguered construction, they are not the least-cost option for Georgians who are feeling the sting of repeated bill increases,” Southern Environmental Law Center staff attorney Bob Sherrier said in a statement.
This will likely be the last commercial nuclear generator ever reaching criticality for the first time on US soil. Consider the current interest rate environment and the appetite for backstopping a multi decade construction project.
https://www.lazard.com/media/2ozoovyg/lazards-lcoeplus-april... [pdf, start at page 4]
Nuclear power is held to too high of a standard to really be a viable source of power, especially in a democracy.
meanwhile the Chinese have 22 power stations under construction and 70 planned
Don’t tell that to France.
The idle corruption of middle managers is what kills these kinds of projects.
Nuclear is very specific tech. I don't think there's a whole bunch of companies out there sitting on their hands just waiting for a bunch of contracts to show up.
Spend the same money starting in the same year and the first solar project makes enough money to fund a second which then also comes online before your nuclear power plant is ready.
Which doesn’t make nuclear useless, but it’s really disappointing if you’re in the industry.
This is a common claim but it abuses statistics. By looking only at the one metric (deaths) it ignores the enormous enterprise required to keep nuclear as safe as it has been. No other power source needs anything like it.
Vogtle isn't going to be a good sales pitch for expanding nuclear.
It's no wonder Georgia Power doesn't provide a calculator to let people know how Vogtle coming online affects the per-unit cost to consumers.
iq decreases, cancer, early death from air pollution, and ongoing, worsening weather damage from climate change
were this plant not constructed and the grid powered from natgas or coal instead.
I hate these discussions about power, because in every case the quoted price of alternatives does not factor in the huge and obvious externalities.
https://www.reuters.com/sustainability/us-power-regulator-we... (US moves to link more wind and solar projects to electric grid) ("Today there is more than 2,000 gigawatts of renewable power waiting to be connected to the grid -- nearly double the amount of current U.S. generation capacity, Federal Energy Regulatory Commission Acting (FERC) Chairman Willie Phillips said at a press conference following the unanimous vote.")
https://www.energy-storage.news/us-utility-scale-battery-sto... (US utility-scale battery storage industry deployed 4GW/12GWh in record-breaking 2022)
https://cleantechnica.com/2023/03/31/turning-america-into-a-... (Turning America Into A Solar Manufacturing Powerhouse)
Low carbon power from Vogtle is welcome, because it's here and what is done is done, but there is no point in throwing good money after bad on commercial fission.
chaos that will ensue when we will reach peak oil/gas/coal, as we extract and consume faster than earth produce them. When the price to extract oil/gas/coal would be too high, chaos will result of our economies addiction to fossil fuel.
The sooner we use alternatives the better.
Housing: So, yes, it is annoying to have new house built with only electricity (i.e. without a gas line) but unless energy becomes super abundant and cheap so we can create gas (out of CO2 and water), electricity is the best bet long run.
Transportation: Same, the sooner we can electrify transportation the better starting with trucks and trains. Boats and planes might get the last drop of oil.
Industry: Should get incentives to move to electricity.
And all electricity should be eventually non-fossil (nuclear + solar + wind + hydro).
Wholesale rates in Europe hit SIX HUNDRED AND SEVENTY FIVE EUROS PER MWh last year because of gas supply issues and unfavorable weather. Spot prices have gone higher still, over one order of magnitude higher actually, those were futures contracts for a useful period of time. Because THAT'S WHAT PEOPLE WILL PAY WHEN THERE IS NO ALTERNATIVE.
Consumer rates of 30 cents per kWh are perfectly normal. 100 not unheard of.
Oh, fun fact; the largest producer of nuclear power in Europe is suing its government because it was forbidden from selling at that market rate. It had to sell at 40 cents per kWh. Not to consumers of course, to the fucking glorious private sector, aka resellers, who did sell it to consumers at market rate. The ones who hadn't gone bankrupt and fucked off earlier when market conditions were against them, that is. Although they did spend a lot arguing, successfully, they didn't need to pay producers then, either. Because the glorious efficient private sector can't have competition.
Yes, I'm bitter. Going to an industry conference and seeing no one able to run plants properly because of unreliable power, whilst neighouring Germany sets a new coal-burning record, in unnatural heat, does that.
4c/KWh is the minimum additional cost across 50 years ignoring interest not the total cost of this power. In other words if inflation adjusted electricity would have been X$/kWh in 2070 it’s now at least X + 4c / kWh whatever the baseline would have been. Europes average electricity prices for the year aren’t that far above average, across 50 years it’s a tiny blip by comparison.
don't you all love the European Union's Single Electricity Market?
It's all projects. This just happens to be a big one.
Everyone likes to point to over-runs, over-budget, late projects.
Nobody goes back and asks "who did the original estimate that we eventually went over?".
Many projects start with /s 'everyone knowing it will go over budget, but if we give a real estimate it wont get off the ground'/s.
Then later someone has to get blamed. If everyone is (quietly)honest they kind of spread around the blame and the success. If it is a contentious project, everyone is playing tag at the end.
But any large fixed price project I've been on, it all hinged on verbose specifications. And then any change resulted in change orders. And it becomes a pissing match of who will pay. It is rarely cut and dry.
But of course you don't have store every kWh used. Peak demand in the summer is caused by A/C and corresponds closely with peak solar generation and can be used directly. New solar farms have a cost of about 0.5cents per kWh, but we'll use 1cent per kWh to be generous. So if you use 3/4 of your power directly and shift 1/4 you end up with an average cost of 0.751c + 0.25(11+1) = 2.75 cents.
And those costs aren't theoretical. For a concrete example, the 8minute energy Eland project proves 24h battery+solar energy for under 4 cents per kWh.
The reality is that renewables are currently only viable to supplement a grid primary backed by a dispatchable source of energy. If you have loads of hydroelectricity, that's fine, but the regions that don't have hydroelectric potential are going to be stuck burning fossil fuels until a massive storage breakthrough is found.
https://www.tesla.com/ns_videos/Tesla-Master-Plan-Part-3.pdf
The Eland project provides 24 hour power with only 4hr of storage. That's the demand curve in action.
Sun’s out = heavy AC load?
Doing any grid 100% solar needs a lot of storage, but there’s gotta be a perfect point that mostly shaves peaks really nicely.
(Yeah yeah, it can be cloudy and hot+humid, but still)
> Shift some of your summer energy usage away from the on-peak time periods (2-7 p.m., Monday–Friday, June–September, excluding holidays).
Battery backed solar is becoming really popular with grid operators because you get the upsides of load following without the overhead of mostly idle production. The economics get interesting as more solar comes online, but things are only getting much worse for nuclear and coal. Which is why there is basically nothing in the pipeline for either one.
1. https://b698061.smushcdn.com/698061/wp-content/uploads/2023/...
Collocated Solar with batteries increases efficiency as DC from solar is used to directly charge batteries without the cost or losses associated with DC>AC>DC you would see if these where separate. LCOE is already below 60$/MWh because you only need batteries for a fraction of total production.
https://atb.nrel.gov/electricity/2022/utility-scale_pv-plus-...
You can see the difference here for today (choose a previous day if it's near the start of the day in California):
https://www.caiso.com/TodaysOutlook/Pages/default.aspx#secti...
The non-grid PV and wind peak is lowered, and shifted a couple of hours later.
And that graph still doesn't show consumer and behind the meter commercial PV impact. Historically there was a double peak, one of which has been wiped out entirely.
We really don’t need any major breakthroughs beyond economies of scale to see sub 7c/kWh rates 24/7/365. People are already deploying 50% battery backed solar because it’s cost competitive vs both base load and peaking power.
After that, storage gets rolled out. Nuclear never makes sense, and eventually the existing NPPs go away.
The same criticism can be applied to any electricity source: What happens wind stops during a heatwave? Or when the sun goes down? You might say nuclear is less reliable, but the reality is nuclear power has the highest capacity factor of all generation sources: https://www.energy.gov/ne/articles/what-generation-capacity#....
Capacity factor does not address reliability or emergency planning...
For comparison: I live in SF Bay Area and pay 42 cents per kWh.
The 4 cent/kWh figure is the additional cost it would have to charge, over the life of the plant, to make up for the budget overage, and would go on top of whatever ratepayers would have to pay for its "regular" energy output.
Further pedantry: you'd have to factor in time value, so that kind of understates it, as the entity that built it would have had to borrow that much more to finish, and pay back with interest.
My point is that while 4 cents per kWh for 50 years is a very big number in terms of cost overruns and the taxpayers in Georgia will have to eat it, I as a California resident, somehow pay through the nose despite abundant and cheap solar energy, especially during the daytime.
https://www.energy.gov/ne/articles/whats-lifespan-nuclear-re...
It seems that in Quebec (see the other reply with 6 cents per kWh all included), moving electrons through a copper wire is much-much cheaper. Something is very wrong with the PG&E costs.
I don’t know where you messed up but if you’re running the numbers include the full cost not just the overrun, interest rates, increasing operating costs during loan repayment, capacity factor, and decommissioning costs. Opening costs late in life is a real killer as older power plants mean ever more equipment needs to be replaced which then lowers capacity factors etc.
Also, LCOE battery backed solar is also under 60$/MWh https://atb.nrel.gov/electricity/2022/utility-scale_pv-plus-... Numbers may be slightly higher in Georgia, but still well below your estimate.