by mpakes · 14y ago · 0 comments
As I've seen firsthand, the waste in typical defense contractor programs is obscene – it's so great to see someone doing something about it. Hopefully with much lower cost to orbit, we'll see a revitalization of the commercial launch market as well.
To GTO those numbers are 2400kg and 4680kg.
The "Launch Payload" of the Dragon spacecraft (6000kg) appears to be approximately the Mass to LEO of the block 2 (10450kg) minus the mass of an empty Dragon spacecraft (4200kg).