by locallost · 3y ago · 0 comments
Construction begin:
Unit 1: 19 July 2012 Unit 2: 16 April 2013 Unit 3: 24 September 2014 Unit 4: 30 July 2015
Commission: Unit 1: 3 August 2020 Unit 2: 14 September 2021 Unit 3: 10 October 2022
And that is in a country with no infrastructure or knowledge. A large country like Poland could do this far better and faster with more plants. France started like that and then became faster and faster, until idiot politicians ruined it.
If you are finishing 1-2 nuclear plants every year, you can deploy green energy quickly.
Finland build 1 nuclear plant, even delayed and went from pretty bad carbon efficiency to very good. Denmark spend longer and more money on wind and its not nearly as effective and reliable a backbone for their network.
Right now Finland nuclear is outproducing Denmark Wind and Solar combined. And the Finish investment will run for 80 years, non of the wind or solar will survive that long.
On top of that, the Polish plant will begin construction 2026, so the build time is planned to be even faster than the UAE plant. I think this is highly unrealistic.
Yes it takes time to build up an nuclear industry but Poland will also not go from mostly coal to all solar and wind anytime soon.
Germany started its transition in the 90s and they are not close 30 years later. Had Germany in the 90s decided to go nuclear they would be green by now and not in an energy crisis.
Poland in 10 years can finish a plant a year and 2-3 years after 2 plant a year and 2-3 years after that 3 plants a year. That how turn a full coal to a fully green grid.
No need for costly grid rebuild, just nuclear plant in the same places coal plants are now mostly.
Edit: And in terms of lost time, if anything not going with nuclear is lost time. By the Koyoto protocol France already had a green grid. We literally had a solution and the anti nuclear movement prevented that solution.
Poland as all European countries is sadly moving to slowly. After 40 years of anti nuclear domiance the energy crisis has shifted perseptions and we are now finally getting back into gear.
What matters is not how long the first one takes but what the yearly completion rate is. Europe should standardize on single reactor and plan to build 150-200 plants. That can easly be done before 2050 and would have lots of energy left over for green jet fuel as well.
Cheap is really relative: I've found very little information on the original build out of french nuclear and how much it cost so let's assume it was cheap. Do you factor in the cost of decommissioning and nuclear waste storage? This will cost literally hundreds of billions. And actually for how long? I did find an interview with the recently deceased chairman of the EDF from that time, who claims the plants were designed to last just over 30 years [1]. To paraphrase: the steel used will develop cracks but this is not a real problem because if will happen after the plants' lifetime of just over 30 years. France tried to build replacements 20 years ago with the EPR, but they were unable to finish the prototype in Flamanville, so they are stuck pretending the current plants can be extended infinitely. They are just kicking the bucket down the road, eventually it will come to an end.
Switzerland does not have some of the oldest reactors it has the oldest reactor, Beznau, which went online 54 years ago, the others are from late 70s and early 80s. Speaking of cracks, it was reported in 2015 there were a thousand holes near the reactor [2]. The operator denied it, but the plant was shut down for a while and the operator said there were 2.5 billion Francs (roughly dollars) used to increase safety [3]. This should give everyone pause to audacious claims that nuclear plants can run for 80 years no problem, and once you've built them they are cheap to run. In the US, it was lobbied hard to prevent Diablo Canyon from shutting down, and when it was approved, they said: but now we need a billion dollars to be able to even run [4].
Germany's energy transition started just over 20 years ago, not 30 years ago. During this time, the renewable industry was basically invented, the feed-in tariff system was invented, and it's been a huge success worldwide. This year alone around 400GW of solar will be deployed [5], non of that would've happened without Germany's decision. Since the last nuclear plants in Germany were shut down, coal use has been at a historic low. Poland's plan that you are in favor will have Poland end up with 30% coal in 2040, if all goes well. So a bit better than where Germany is basically at now, which is pretty bad for something that will happen 20 years from now at best. Poland's wind energy increased to 10% of the electricity mix in the last decade, so the german energy transition has done more to curb Poland's coal use than anything else thus far. And a lot faster than 20 years.
There is no special energy crisis in Germany that did not affect the whole Europe last year. France has pumped in 100 billion euros in the energy sector in the last three years to protect consumers and curb inflation [6], and was one of the first countries to do that. Germany only did it this year and much less (e.g. price caps at 40kw/h but only for 80% of your previous usage to promote saving). The countries are bickering now because Germany has a free market and no state company to pump money into, and it has a problem competing with "electricity" that is heavily subsidized [7].
Those are the facts.
The rest on how nuclear plants should be built, how long it will take etc. it's mostly just wishful thinking. You don't know any of that, so there's nothing to comment on.
[1] (in french) https://www.ina.fr/ina-eclaire-actu/president-edf-risque-fis...
[2] https://lenews.ch/2015/10/13/concerns-raised-about-switzerla...
[3] https://www.axpo.com/ba/en/about-us/magazine.detail.html/mag...
[4] https://www.reuters.com/business/energy/us-approves-conditio...
[5] https://about.bnef.com/blog/3q-2023-global-pv-market-outlook...
[6] (in french) https://www.latribune.fr/economie/france/crise-energetique-l...
[7] https://www.bloomberg.com/news/articles/2023-09-18/france-an...
I worked at Jebel Ali power plant(worlds largest gas plant) just outside Dubai for two years installing and commissioning high voltage switchgear.
The Emiratis(and their army of Indian/Bangladeshi/Pakistani/misc./ engineers and laborers) truly knows how to build large scale industries. I doubt they have taken any shortcut whatsoever.
In my experience, they require everything to be 110% perfect.
> “And what’s particularly worrying is the lack of a core catcher, which in the event of a failure of the emergency reactor core systems, would retain the nuclear fuel once it breached the reactor pressure vessel. On top of that, concrete cracking in all four reactor containment buildings hasn’t helped, nor has installation of faulty pilot-operated safety relief valves.”
https://www.power-technology.com/features/divided-opinion-in...
With Bechtel ? Maybe 2043.
But as the saying goes, the best time to plant a tree…
And no, solar power is equal to nuclear power. Where is my solar power night time?
It took a lot less than the 10 years best case we'll get here.
Theyre certainly not doing it for economic reasons (5x the cost of solar or wind) or for the environment. They burn more coal per capita than anybody else in the EU and will likely continue to do so for the 15 or so years until this project is completed, while solar and wind farms take 1-3 years to build, pumped storage ~10.
It is all as hilarious as Korean tanks purchase - we learned that Poland is going to borrow money from Korea only when Korean media announced it. No one knows actual financing conditions. But it still might turn better than https://en.wikipedia.org/wiki/Gawron-class_corvette
Thanks for editing you comment with some substance...
You do realize that cost and especially viability of wind and solar varies dramatically geographically? Renewables are not as easy to deploy in Poland and the fact that we're going with nuclear is precisely to address the coal situation. (Which is what you're attacking btw...)
Not to mention nuclear is also the safest technology out there so far (read up stats on the deaths per each technology, per megawatt)
Let's remove all laws where the public bear the cost of accidents then? Should be fine since it's the safest!
https://en.wikipedia.org/wiki/Price%E2%80%93Anderson_Nuclear...
That is for the U.S., but equivalent laws exist in all countries with nuclear power plants.
Safety of nuclear is confirmed by death stats and bills like the one you mentioned don't prove otherwise. In fact I'd say they encourage lesser safety measures if anything...
I think you missed some news https://www.pbs.org/newshour/world/un-nuclear-watchdogs-safe... While they managed to avoid shooting directly at one of them, shelling the area wasn't uncommon and it's a bit up to luck that there were no mistakes.
* regular artillery shells, bunker busing is a different story
I don't see any real 'proof there, especially about everyone not being eager to...
Moreover whenever a weapon is used there is a risk of hitting a non-target.
You can load a 747 with explosives and hit AP1000 and would still not destroy it.
Russia could fire 1000+ rockets, drones and cruise missles and it would not cause the next Chernobyl.
And Iran was planning to do it safely in cooperation with the French under full view of the IAEA. However the US then came in and destroyed this plan.
And your repeated claims about the economics are based on very bad oversimplified math. Please stop spamming the same nonsense in ever post, you are simply acting like an anti-nuclear advocate rather then debating.
Yeah sure, solar and wind farms ... in Poland, probably the worst country in the EU in terms of wind potential and low solar potential. Like that's going to work.
And using which backup tech exactly? Certainly not Russian gas.
Your nuclear power plant can work alone, the wind and solar farms just can't.
The fuck you're sniffing