118 points · by DocFeind · 3y ago · 107 comments
These plants need on-site diesel generators to provide site-power in case of loss of off-site power (grid failure). Here the operator had leaks in fuel lines that fed both the A and B generators. These are the only generators of on-site emergency power.
An operating reactor needs approximately 2-5 days to cool due to build-up of radioactive decay products in the core, which continue to generate heat even after the reactor has been fully shutdown (in the case of an emergency, a sudden shutdown of the reactor is called a SCRAM).
On-site power serves the primary purpose of driving core-recirculating coolant loops to control the core temperature. Chief metrics in reactor safety generally relate back to core-damage-frequency (CDF), because when one damages the fuel-casing or core, this is the most-likely precursor to releasing radioactivity. CDF determinations are almost directly linked to loss-of-coolant-accidents (LOCAs) which imply that one can no longer cool the nuclear fuel core or elements.
Total station blackout, which is a result of loss of off-site and on-site power, combined with a SCRAM is essentially the scenarios that led to Fukushima and Chernobyl disasters. The NRC will not treat this lightly.
After the Atomic Energy Commission was disbanded the Nuclear Regulatory Commission was formed. The NRC has had an ultra-conservative policy against new technologies, creating a chicken-and-egg-problem for new tech: a tech must be proven in a relevant nuclear environment before it can be approved by the NRC, but it cannot be proven without installing it in a relevant environment unless it is already in a grandfathered reactor design.
Additionally while there are a lot of interesting ideas, simulations and paper-reactors, "approved" real reactors face large capital costs (~$5bn / 1 GWe) as well as long build times (~10-20years). The real crux of this problem is that the utility cannot get guarantees that when it builds a reactor that it will be allowed to operate it. At the end of a build, there is a licensure process that must pass a community comment period. The political landscape 10-20years in a community's future can change dramatically, leaving a utility with a huge gamble that can result in brand-new nuclear-reactors, which are blessed by the NRC, to be shuttered.
The first Google snippet had me think you can build a nuclear powerplant in six years, but you are right [1,2].
Why does it take so long, say, 15 years? Is it simply the difficulty? Supply chain issues? Regulation? Changes in the political climate?Something else?
1. https://www.statista.com/statistics/1333678/nuclear-plants-c...
2. https://www.world-nuclear.org/gallery/world-nuclear-performa...
The AP1000 design is a generation III+ reactor which is safer than 99% of the existing plants in the U.S.
Wait, aren't there cooling pools for spent rods that take years to cool down? What do you mean by "cool"?
Fukushima made it rather clear that reactors don't cool down in 2-5 days.
Looks to me the copium is still high in the field.
Significance: P (pending)
Jun 30, 2023
Identified By: SR
Item Type: AV Apparent Violation (AV)
Failure to Identify and Correct a Condition Adverse to Quality Associated with the EDG Fuel Oil System
A self-revealed finding with significance to be determined (Pending) and associated AV of Title of the Code of Federal Regulations (10 CFR) Part 50, Appendix B, Criterion XVI, "Corrective Action," was identified when the licensee failed to identify and correct a condition adverse to quality for the EDG fuel oil system that left the system vulnerable to premature piping cracks and eventually resulted in the failure of the ‘A’ EDG during testing on November 2, 2022. Specifically, inspectors determined that, based on the failure history of the EDGs and the licensee’s documented conclusions that attributed pipe cracks to prior maintenance events, the licensee had sufficient information to identify the existence of a condition adverse to quality related to the design of the EDG fuel oil system. This condition caused threaded fuel oil piping connections to be vulnerable to maintenance activities that over torqued, strained, or impacted the piping. Despite the challenge to maintain leak-tight connections and repeat occurrences of cracked piping, no significant changes were made to maintenance practices, procedures or system design, and the licensee continued to reactively monitor for leakage even after vulnerabilities were identified.
Previous report:
Significance: W (white)
Mar 31, 2022
Identified By: NRCI
Item Type: NOV Notice of Violation (NOV)
Failure to Correct Condition Adverse to Quality Resulting in Inoperable Emergency Diesel Generator
An NRC-identified apparent violation of 10 CFR 50, Appendix B, Criterion XVI, was identified for the licensee failing to correct a condition adverse to quality resulting in the inoperability of the 'B' emergency diesel generator (EDG). Specifically, there were indications of erratic governor performance following the January 2022 maintenance package that were identified during testing January 16, 2022. The governor performance was also erratic during the February 9, 2022, surveillance test, after which the licensee declared the EDG inoperable. As a result of this condition, the ‘B’ EDG was inoperable for a time in excess of its technical specification (TS) allowed outage time.
The scale is Green, White, Yellow, Red. Normal is green. This problem reached White in March 2022, and the June 2023 problem shows as Pending, which means the NRC had not assigned a color level yet. Now they have escalated that to Yellow, according to the press coverage. Which is a good move, considering that troubles have been observed in both the A and B emergency generator systems. Anyone know if they have more than two emergency generators? Two is kind of low.
One lesson for me is that excellence is a symptom of a healthy organization, not the other way around.
[1] https://www.chooseenergy.com/news/article/failed-v-c-summer-...
[2] https://www.wsj.com/articles/south-carolina-utility-agrees-t...
[3] https://theintercept.com/2019/02/06/south-caroline-green-new...
This is the right abundance of caution for the NRC to use (after all, that kind of reactor can melt down if power completely fails and cannot be maintained to sink heat), but it should be an easy fix. If anything, the yellow card was given for how long Dominion's been letting itself sit on an easy fix.
(On the other hand, the justifiably-paranoid might ask what else is wrong if they've let a maintenance issue this relatively unimportant slide...)
Exactly. It seems like the kind of negligence that should get a license revoked and have the plant seized and handed over to a more competent manager (Duke seems reasonable).
I wonder if there's precedence for such a move when it comes to utilities in the US?
Edit: It doesn't seem quite as negligent after a second reading, but ... still makes me wonder what else has been done quickly and without really addressing the root issue...
The sounds acceptable. We're not able to run any piece of gear without the occasional failure - the argument with nuclear is a failure scenario appears to be about as damaging as the business-as-usual so all y'all be mad for putting so much effort into preventing it that nuclear became uneconomic.
Uneconomic because finding and fixing a crack in a pipe in the backup system is 4-on-a-5-tier system of regulatory response and has people talking about delicensing the operator.
[0] Oh wait I know this regulator. The dude who is in charge has a B. Arts in Religious Studies - https://en.wikipedia.org/wiki/Christopher_T._Hanson - which isn't a problem in itself but I felt it was apart of a pattern when it came to heads of the regulator. Their backgrounds didn't inspire my confidence.
Seems like they could easily pressurize the pipes when idle to detect leaks
They were famous for having a clause in the preparation checklist, that they had to have a bowl of M&Ms in the lounge, but no green ones.
Eddie Van Halen was asked about this, and his explanation was that their stage set was very complex, and required rigorous preparation. Failure could actually be dangerous (think the “pod” scene from Spinal Tap).
He said that if they found green M&Ms, then that meant the instructions were not read correctly.
[EDIT] I was wrong. It was brown M&Ms
"The rider's "Munchies" section was where the group made its candy-with-a-caveat request: "M&M's (WARNING: ABSOLUTELY NO BROWN ONES)." *
*https://www.thesmokinggun.com/documents/crime/van-halens-leg...
You are correct, which is why I am not setting up metal stages.
As you say, the M&Ms are just a proxy indicator. They indicate the instructions were read, but they have no direct role in the stage set.
The backup diesel generators, at this nuclear power plant, could be considered a proxy indicator that attention has been paid to more fundamental pieces of the reactor, as your metaphor implies, sure. But the backup diesel generators themselves play a direct and critical role in the preventing a power outage from turning into a nuclear meltdown.
Imagine if the M&Ms actually did act as a fire suppression system that would stop a pyrotechnics mishap from burning down the concert arena. That's more like the kind of M&Ms that were supposed to be in the bowl at this power plant.
But the correct way costs way more money than M&Ms.
That being said... you would be surprised to learn how often "cute" tactics like these are utilized by governments to leverage human behavior.
They also generate tritium for hydrogen bombs.
And do things like this:
https://en.wikipedia.org/wiki/Kingston_Fossil_Plant_coal_fly...
It's not about hiring infallible operators. It's about operating with enough redundancy that humans can be fallible without causing a disaster.
I understand that nuclear facilities are not like regular buildings and require more logistics for repairs but there's no way it would require 20 years.
From: https://www.thestate.com/news/local/environment/article28022...
> The NRC, which rarely issues yellow findings, said nuclear plant operators did not resolve cracking problems from 2003 to 2022 in V.C. Summer’s diesel generator system, one of the most important backup safety systems at an atomic power plant.
which links to: https://www.thestate.com/news/local/environment/article27928...
> Federal nuclear safety officials made a discovery that was perhaps more unsettling than the problem from 2022. They identified a pattern of cracks and leaks in the plant’s emergency generator system going back 20 years. On five different occasions since 2003, the power company has been forced to repair cracks in the emergency diesel generator system, according to an agency inspection report released in August. Diesel oil leaks have focused attention on why VC Summer plant operators did not resolve the cracking problems — and how that might have affected the company’s ability to prevent a radiation leak if an emergency occurred. Officials with the Nuclear Regulatory Commission say they are concerned because the problems keep recurring. Few other nuclear plants in the Southeast have had the same number of cracking problems in diesel generator systems, say officials in the agency’s Atlanta office.
So they found cracks first in 2003, and fixed them. They found more cracks over the years and fixed them... what they have failed to do is to stop the cracking from occurring in the first place. That failure led to an even bigger crack happening during a test run of the system. According to Dominion, they plan to build a new pipe, which should fix this. The NRC seems to think they should have done this sooner, and the NRC is likely right, but I am no expert in these things.
It probably should also result in a much more throughout inspection of the plant to ensure that there are no other issues. Again, I have no expertise here.
Without a true timeline of events, its hard to say for sure.
tldr; regulatory processes prevent improvements.
I work in a highly regulated industry though not nuclear. There are obvious things to change which were approved in the site plans decades ago. Those nonsensical systems must be maintained because if they stop working for a small number of hours, everything must be stopped and there will be fines. It won't be changed because doing so requires asking regulator for approval and then everybody and their uncle gets to make a comment and even sue to stop it. Regulatory process hinders obvious good changes and improvements.
BTW, this is similar to how Los Angeles squeezed out good paying manufacturing jobs three decades ago - make it near-impossible to get electrical permit to change anything.
They have an engineered lifespan and things start falling apart and becoming dangerous when you exceed that. Many should never have been extended. They've had to change safety tests and infrastructure tests so the order plans would pass inspection.
This has always been my concern with nuclear. Yes we can make it safe, but the human greed factor is always the weak point. Regulations weakened, automated systems bypassed, skimping on design decisions, etc.
This first link makes me absolutely furious. There's too much to quote from here, but here's just one excerpt. The post has numerous examples of very concerning issues.
> When valves leaked, more leakage was allowed — up to 20 times the original limit. When rampant cracking caused radioactive leaks from steam generator tubing, an easier test of the tubes was devised, so plants could meet standards.
https://www.nbcnews.com/id/wbna43455859
> The proposal comes as most of the nation’s nuclear power plants, which were designed and built in the 1960s or 1970s, are reaching the end of their original 40- to 50-year operating licenses. Many plant operators have sought licenses to extend the operating life of their plants past the original deadlines, even as experts have warned that aging plants come with heightened concerns about safety.
https://www.nytimes.com/2019/07/17/climate/nrc-nuclear-inspe...
> The nuclear industry is also pushing the NRC to cut down on safety inspections and rely instead on plants to police themselves. The NRC “is listening” to this advice, the Associated Press reported last month. “Annie Caputo, a former nuclear-energy lobbyist now serving as one of four board members appointed or reappointed by President Donald Trump, told an industry meeting this week that she was ‘open to self-assessments’ by nuclear plant operators, who are proposing that self-reporting by operators take the place of some NRC inspections.”
https://newrepublic.com/article/153465/its-not-just-pork-tru...
And this stance would be perfectly fine if the alternatives were better. If we are firing up coal plants to make up for not building nuclear plants, we are much worse than even a _leaking_ nuclear power plant. Coal plants, depending on where their coal comes from, can't even be built near nuclear as they would set off radiation alarms.
Coal emissions are particularly harmful and cause lots of deaths worldwide. Natural gas are much less so, but still not great.
We need to remove the older nuclear power plants and replace them, for baseline power, with newer designs. They are far safer and will not meltdown no matter what fails. Newer reactor designs are usually not self-sustaining and require active management to keep them going (as opposed to intervening to stop them).
The answer seems to be renewables everywhere, and newer reactors to keep up with baseline demand.
> The proposal comes as most of the nation’s nuclear power plants, which were designed and built in the 1960s or 1970s, are reaching the end of their original 40- to 50-year operating licenses.
That is indeed the main problem. We have solved a lot of issues in half a century.
I believe we passed the point where solar with storage is better. It's certainly faster and easier to deploy, but now it's apparently also cheaper per produced Wh than nuclear even accounting for a mere 30% efficiency from the storage "detour".
Solar has kept falling in price this year as well, while nuclear is always revealed to be more expensive every time a new study is made.
The cost of storage isn't just the conversion losses. You also need the storage hardware, and for it to have enough capacity for an extended period of low generation.
Once you convert heating systems to electric to stop burning fossil fuels, what do you do during winter when it's cold, the days are short and it's cloudy and calm for a week?
No one seems to be able to answer this, and the closest I've seen is something like "keep all of the existing natural gas plants operational and use them to burn hydrogen instead, but only when renewable generation is low." Which is just preposterously expensive -- you'd have to maintain an entire redundant set of generating plants that you hardly ever use and that themselves cost almost as much as nuclear power plants do.
But that is still less expensive than trying to build a week's worth of storage capacity using something like lithium batteries. And both of them have the problem that you have to choose in advance how much storage capacity to build, but if you build too much you've doubled your costs and if you build too little then people freeze to death.
As for baseload (which I assume is what you are referring to here), that seems to be an elusive concept that is just never expressed in twh. Because as soon as you do that, you can start imagining all sorts of alternative and much cheaper, practical, less hand wavy, and faster ways of getting that capacity in place than building actual nuclear plants at scale.
I mean, how many nuclear plants do we actually need? 2, 5, 200? At least put a number on it. Do we need any plants at all? Nobody seems to know this or want to talk about this in any level of detail that you could use to actually start planning some budgets for this. It's just presumed lazily that we need unspecified (typically to the extent of committing nontrivial percentages of the world's GDP to this) amounts of it to ensure our anxiety levels stay within acceptable range. It's completely irrational at this point.
Meanwhile, the amount of wind and solar coming online keeps beating expectations and battery production is ramping up from gwh scale to twh scale per year. It's the only practical alternative that exists to nuclear right now. And it's being done at a ridiculous scale because it's an order of magnitude or two cheaper (and dropping further). To make a dent into that, you need a lot of nuclear plants at this point for it to even matter and at a much lower cost than most nuclear proponents seem willing to entertain. I don't see that happening really. Doubling or quadrupling the amount of renewables + battery seems much easier, doable, and cheaper at this point. Especially if it needs to be done in a timely fashion.
Others types of power plants slowly hurt people or the environment even if mistakes don't happen.
One can get a handle on the magnitude of this issue by looking at the cost per person killed. Typically, policy decisions on this are based on the statistical value of a human life, which is somewhere around $9M/life.
If you use that value, then the extra "life value cost" from renewables is orders of magnitude below their direct cost. So it makes no sense to use a more expensive energy source than renewables just because you've been convinced renewables are too unsafe.
I agree. But it does make sense to use nuclear for other practical reasons. It works well for fulfilling base load. Renewables are great but transmission and storage is a bitch for those which are not dispatchable.
Where nuclear shines is in replacing other base loads, like coal.
Update: it was $12.5M in 2022.
Also, let’s not forget about Hanford site, which was part of the US nuclear program
[1] https://en.wikipedia.org/wiki/VX_(nerve_agent)#Worldwide_sto...