by throw0101c · 3y ago · 0 comments
> Upon the outage, both banks immediately activated IT disaster recovery and business continuity plans.
> "However," according to Tan, "both banks encountered technical issues which prevented them from fully recovering their affected systems at their respective backup datacenters – DBS due to a network misconfiguration and Citibank due to connectivity issues."
Perhaps regularly flipping between them on a regular basis, at least for a short time, so the 'passive' part of the active-passive pair gets some work, is worth considering.
If you’re going to use the word strategy this way it has no meaning, which kills the conversation and communication in general.
I think you’re confusing strategy and behavior. Strategy is a plan to do better than default behavior.
Writing up a plan for disaster recovery is a strategy for disaster recovery. The pros are that it is cheap and ticks the regulatory checkboxes. The downside is that it has a high probability of a high recovery time in the case of a disaster.
My point is that there are different pros and cons to every strategy that you can pick. I also don't think that all strategies are better than "default behaviour" whatever that is.
It’s two steps away from Apollo 13. Build a CO2 scrubber out of parts in this box. You have twelve hours until the crew suffocates and dies.
"An untested recovery plan is worth less than the paper on which it is printed."
I'm sure there are many other versions of the quote
There’s a harness connected to a rail above you to catch you if you fall.
In the video the man gets halfway across and the cable attached to his harness just pops off. The instructor behind him instinctively reaches out as if he can use The Force to catch him if he biffs, but he makes it to the other side unharmed, and is all smiles until the cable catches up and bops him in the back. At which point he turns around and connects the dots.
It’s a bit like that. And this is the image that comes into my mind every time I discover we have untested recovery processes while we are in the middle of a recovery.
True. But getting the PHB's at a bank (and perhaps the banking regulators) to sign off on doing that...could prove to be a non-trivial task.
Maybe I'm just too skeptical.
On paper, there are plans and redundancies upon redundancies, and everything is perfectly safe.
In practice, I haven't seen them exercised, and some of these plans sound incredibly optimistic...