I'd expect that the rover body itself would be bespoke this late in the process, although a parallel test vehicle would be useful, do they have that?).
But in case someone fried the rover's electronics I'd think tearing it apart and replacing them while maintaining the chassis should be doable in 2 weeks, but what do I know?
According to Wikipedia they could have stretched those 2 weeks to around 3 weeks, but after that they'd have missed the launch window.
The usual processes are there to have a near-certainty of a working rover, but under these circumstances I'd think they'd just YOLO it and hope for the best.
But that assumes they've got spare electrical components, or alternatively a better use for the booster sitting on the pad than such an improvised mission.
(I really doubt it was fully tested. But why else have a flight spare vehicle?)
*A notable example of this is in the world of RC cars, where rock-crawlers only very recently have started switching to brushless motors using field-oriented control to deliver acceptable very-low-speed behavior. Until FOC controllers became available, brushed motors offered much better low-speed handling.
I don't think FOC type controllers were anywhere near common back then either, which is needed to run a brushless motor smoothly.
There is just so much more that can go wrong with a brushless setup, vs brushed where you just apply power and that's it.