by andyouthink · 14y ago · 0 comments
But, that said, I'm surprised that no one has mentioned here that M-Th, 9-6 isn't a 4-day week, unless you include a required lunch hour, which most don't. So, since you didn't mention that, and I'm fairly sure that you work through lunch as many do including myself, then 9-6 M-Th is 36 hours, which is 4.5 "normal" 8-hour workdays.
I challenge you to be profitable working 32 hours a week (the equivalent of 4 8-hour workdays), preferably using flex time (so people can work those hours whenever they wish) and allowing telecommuting whenever the employee desires, and still be profitable.
We also don't all work 9-6. It's a guideline that we use to help us know when we should be available for collaborating with others on the team, but I generally start at 8 AM and end at 5 PM each day.
A whole lot of our team works remotely or at least has the option to, but our video production generally requires that we be on site to produce our videos at the quality we want. Even with the people who need to be in the office there's a decent amount time spent away from the office, though. All of our developers and designers who work on the site work remotely.