by diggan · 2y ago · 0 comments
Would that even be possible? How long time would it take them to complete a completely new design? And then how long time from the design is finished until they can start delivering planes?
This: https://upload.wikimedia.org/wikipedia/commons/9/94/EM_N323A...
Is so obviously not this: https://upload.wikimedia.org/wikipedia/commons/3/32/Alaska_7...
The Airbus A330 and A350 share the same type rating. (At least some variants; I'm not an expert.)
The Airbus A330 and A350 share the same type rating.
In fact, they do not in the United States.https://registry.faa.gov/TypeRatings/
In Europe, they do:
https://www.easa.europa.eu/en/downloads/11737/en
However even within the same type rating you may have additional training or restrictions. For instance the FAA prohibited Southwest from using the same pilots across three generations of 737 (Classic, NG, MAX), so Southwest ditched the Classics when they bought the MAX.
As far as I know (not a pilot or aeronautics engineer) MCAS was more or less an attempt to do the same to a non-fly-by-wire plane, and we see how that turned out...
Is there something in that process we can address instead?
It's great that the FAA is looking into this. Who is looking into FAA, though? Is this another case of institutional capture?
The problem is Boeing clearly doesn't know how to manufacture good aircraft anymore. Whether it's a rehash or clean sheet design, the result won't change until Boeing is run through the washing machine.
The problem was that airlines want to skimp on the training.
The same thing happened with the engine management. Boeing doesn't want to introduce an engine warning system because it would mean pilots have to be retrained. A lot of these barriers aren't part of the physical design but the industry as a whole being extremely wary of training. Probably as a result of cheap low-cost carriers emerging.
Not saying Boeing is a great manufacturer but it's not the only issue at play.
You can tweak and upgrade an aircraft to a certain extent, but they've pushed the 737 design too far.
Y'all think 737 MAX as an airframe can't fly safely, and that's straight retarded. I sincerely believe Boeing should face bankruptcy from their many recent failings, including 737 MAX, but even I will still say 737 MAX are fine birds so long as common sense is applied.
A220 was officially launched in 2008 (with like 3-5 more years of some degree of development prior to that) and first delivery was in 2016.
A350 was officially launched in 2004 and first delivery was 2014.
Expecting 8-12 years would be reasonable.
This was always a leadership issue.
Whether the will is there? The fear of not dying while flying 4 miles high is a powerful incentive, and the public/market had spoken
What other (poor) outsourcing can we disincentivize?