by wolverine876 · 2y ago · 0 comments
If everything they build lasts longer than expected, not only are they giving bad estimates (which perverts allocation of resources), they are way too smart and experienced to be doing it unintentionally.
Now if Ford Motor underpromised on your car, telling you it would last 2 years, you wouldn't buy it in the first place - you'd never find out that it really lasts 10 years. But I suspect NASA gets away with it because everyone is blown away by even the underpromised result - helicopters on Mars, holy sh-! - and also nobody has experience with how long Martian helicopters typically fly.
Take a much more common example: expiration dates. A product going bad before its expiration date is an issue. Potential a massive one that could kill people. A product that remains in good condition after its expiration date is fine. As a result, expiration dates almost always occur far before the product actually expires.
That is salesperson talk. NASA has been doing public communication half a century too, and they know what people will take from it.
Or "NASA says there's going to be a major announcement tomorrow about a discovery on Mars!", and the discoveries are usually "we've found yet more evidence that Mars used to be wet."
Even the missions themselves - there's been a lot of talk about how Perseverance is collecting samples as the first part of a mission to send them back to earth. But the difficulty is in launching a return flight from Mars, something we're nowhere close to being able to do at the moment. You have to wonder how much of the sample caching is really useful, and how much is just a way to look as if were making progress on something that's still incredibly far away.
Your assessment of the estimates is basically MBA talk.
They designed the helicopter for 5 flights. It is very likely the case that the requirements that a rotary wing aircraft can operate for 5 flights with minimal operator intervention, and only between missions, resulted in an helicopter that had a longer lifespan. Could they have done it cheaper? Maybe, probably, but most likely with a much higher risk of failure, and given the time, distance, and cost, and the organization doing the work, I am pretty confident that the team made the right choice.
Cyberdyne industries: I never said you would die at the end! Aieee my eyes!
Furthermore, you are answering it with a “they must have known!”
I just don’t see how you can know this. (For context, I work at JPL and interact regularly with some of the Perseverance team, but nobody from the helicopter team, which was very small.)
Some context. The helicopter was originally quite controversial because it had no clear science rationale (mission science requirements did not imply a need for a helicopter). My understanding is that it was put on as a tech demo and (paraphrasing) cool thing. The lab director at the time was a proponent.
Of course it was a huge success.
Because of its precarious status, it was not designed to fly a lot. Planning flights takes a lot of resources, coordination with the rover takes resources, etc. Bandwidth, time, and people. My point is that the “plan” was kept small partly because these ancillary costs had to be kept down. This would hold even if the hardware could last forever. The tech demo must not get in the way of the prime science mission, which had already been planned.
The use of COTS components is another factor. The effects of radiation on microprocessors (in the Mars-surface or deep space environment) are not really well known, as a practical matter. There is just not much engineering experience with how bad it can get. So the longevity of the Snapdragon was (AFAIK) highly uncertain, not to mention whatever other COTS components were on it.
Hope this context is helpful.
I know nothing about the helicopter in particular but as I pointed out, NASA seems to very frequently underestimates longevity and performance (not a crime at all and maybe politically wise); I can't remember when they've overestimated. Forget my impressions in prior posts - how and why does that actually happen?
> tech demo ... precarious ... not much engineering experience
Also, while I've taken the opportunity of spare resources to do experiments (though not usually on Mars), I'm careful about timing and appearances - I don't want to embarass my team or partners with a failure that's visible to outsiders who wouldn't understand it was an experiment, and would think we just failed at our jobs.
Everything NASA does seems to be on a very public stage, interpreted by endless outsiders (like on HN :) ). The whole world watched the helicopter's first flight. How can someone approve the helicopter, and promotion of its flight, and risk the world saying, for the next decade, 'that crazy helicopter embarassment shows we need to rein in NASA', blah blah blah? NASA's reputation is very important to humanity.
Thanks for sharing what you know. You guys do amazing things; people are so jaded that they don't realize how incredible it is.
Heli was on board the lander but it was not subject to the same risk constraints.
I think your probabilistic risk assessment has something going for it, but not all risk would scale that way.
I’m surprised at the self assurance of some of these comments!
Directed (in essence) means that the National Academies (NAS) decadal survey recommended that specific mission. (They specify the what but not too much about the how.) A directed mission is assigned to an implementing center (JPL , GSFC, etc.) And they build it to accomplish their best interpretation of the NAS DS guidance.
Sometimes this can be expensive, more expensive than the NAS expected (JWST). And sometimes the imperative to make it work to accomplish the “down from the NAS” guidance, with near 100% certainty, in a novel environment will result in over performance like you noted.
The noteworthy directed missions are mostly large flagship missions.
The other category is cost capped competed missions. (VERITAS is a recent one, so was New Horizons, but they exist in astrophysics and earth science as well as planetary; see for example https://en.m.wikipedia.org/wiki/New_Frontiers_program). “Tell us what you can build to accomplish some portion of the following high level science goals in $300M or less”
Over engineering is not really possible under those conditions! You will be competing against the absolute best concepts and teams in existence. So the budget is really squeezed.
These two mission types are complementary in the obvious way. The flagships push engineering capacity way forward, and the competed missions have a lot of innovative concepts within a cost cap.
There are also pure tech demonstrations (often piggybacking like the helicopter did) and certain other categories but the competed/directed split is primary.
OTOH there is approximately 0% chance a Ford is going to last 10 years without any maintenance or repairs.
NASA built in lots of margin to help ensure they met their objective, especially considering that it's really fucking hard to get a new helicopter to mars if it breaks.
If it broke in those two years you’d be very upset, but if it does last longer that’s a bonus.
Unlike with software, where they call that "support" and try to scare you into their next version immediately after that ends.
Unfortunately, the automakers are slowly picking up those practices from software.
We’re talking about on-off speciality devices designed to perform a task where there is no possibility of repair or service. They’re overbuilt to provide the best chance that the main mission is accomplished. Once that’s done they can keep going until it breaks.
So, we keep having gear designed that shows us exactly what could happen for longevity while accomplishing the actual mission goals for the same budget
when they get the funding for the mission is when they make the lowball estimates, but with the funding they build equipment that is much more durable. It's hard to see where any perversion takes place
Is that actually the case when it comes to the helicopter in question?