by WalterBright · 2y ago · 0 comments
Funnily, even with NASA's example, we have several instances of Boeing screwing up everything in favor of short term gains. ULA had to be 'forced' into existence by the government, because Boeing was caught conducting espionage on Lockheed Martin and was at risk of getting barred from government rocket launches (which would've left the US with only one launch service provider). They also tried to amend their bid on the Artemis lander competition, potentially after having info on others' bids leaked to them by a NASA insider. They forced ULA to severely limit the capabilities of Vulcan to not make SLS unnecessary (even tried to get people fired for it). Then, of course, we have the ongoing engineering disasters of SLS and Starliner.
I'm also not really sure how NASA fits considering that they have no monetary profit motive. They subcontract everything because that's just how the government does most of its procurement.
What is the evidence of that?
Certainly there's every reason to believe that they exceeded requirements by a lot: NASA not only has an astounding successs rate (in the most challenging engineering and manufacturing challenges in human history) but their missions tend to last far longer than the specifications. Voyager 1 and 2 are still flying, and so is that helicopter.
In fact, is there any organization ever that is a worse fit for the description, "did the bare minimum to meet requirements".
For an interesting description of how NASA engineering and budgeting actually work, here's someone from JPL (for a bit more, see other comments from the same user):
The point is that subcontracting is not the problem.
What problems are you referring to?
But I dont think the comparison makes much sense.