by meche123 · 2y ago · 0 comments
Another problem is that the system is reactive, meaning that there is a lot of shaking and balancing that is quite unacceptable - think about drinking a cup of tea in such a wobbly train even on straight lines, while on curves it's not staying horizontal by design.
Yet another problem is that it can't share the current infrastructure without major switch changes while sharing the infrastructure the other way around is impossible.
And in the end all of this effort for trying to fix a problem that doesn't really exist, at least not in Europe where most of the rail infrastructure was already built 100 years ago.
Worth noting that modern tilting trains do this quite successfully (on two rails!), in order to run faster on tracks with tight curves. By “leaning in” to curves, you make the ride more comfortable, not less.
Tilting trains are used extensively on the UK’s West Coast Main Line, for example.
That is the intention, but many people report discomfort due to the non-ideal adjustments, at least for the tilting trains in germany.
I commute 50 mins each way on a Pendolino in the UK (into and out of London) and find that if I'm doing work on my laptop, or responding to emails on my phone as the train tilts I feel uncomfortable and dizzy.
The "slow" Desiro trains that don't tilt take 2 minutes longer to get into London, because whilst their top speed is 15Mph lower they accelerate faster.
Thought to be so, because there's a mismatch been visual and inner ear inputs. That is: you can see you're going around a corner, but you don't feel it. Resulting in motion sickness. Since all people have different tolerances of motion sickness, it's impossible to have a "correct" amount.
Almost all systems compromise between zero and full compensation, but passenger comfort is just one of many factors, and not the most significant. The discomfort on German tilting trains is probably because they are too close to "ideal".
One of the issues with the German tilting trains is that they try to compensate up to 8° without track knowledge (BR 612) thus the first carriage (the one after that less so) swinging abruptly to compensate when entering or exiting a curve. Not sure how the class 390s solve that problem.
Clever engineering without a necessary, defensible, competitive business advantage usually becomes either a hobby or an art project.
It could be interesting with it's own infrastructure, though my first thought is that it might be better suited to tunnels, being able to maximize use of the tunnel profile.