by Animats · 2y ago · 0 comments
That's about 60% of the capacity of one unit at Vogtle nuclear power station, and Vogtle has four units.
Also, adding the solar capacity to the battery capacity to get a gigawatt makes no sense. Either you're charging the battery, which takes power from the solar array, or you're discharging the battery because it's dark and the solar array is idle.
Edit: Gemini took 4 years from project submission and 2 years from construction start. Vogtle took 19 years from project submission and 12 years from construction start.
A standardized reactor design and regulatory certainty would enable the economies of scale and accrual of institutional knowledge to efficiently build new power plants. In response to the 1973 oil crisis, France massively expanded their fleet of nuclear reactors which were producing more than 70% of their electricity in about 15 years. If the political will is there, it can be done.
France is experiencing exactly the same long delays and cost overruns today at Flamanville, despite having a welcoming regulatory environment, etc.
China also has lots of delays, and presumably cost overruns, but costs are a hard thing to pin down in China. China is barely expanding their nuclear program, only something like 50 new reactors are planned, a few orders of magnitude smaller than their plans for solar and wind.
CA HSR has experienced the obstructionism that Vogtle did not, but is still making good progress. The media narrative doesn't cover it well, but there are new sections completed all the time.
We have problems with big construction projects in the US, but nuclear takes those problems to the next level. And we have great non-construction alternatives for nuclear.
China does similar projects in about 6 months. IOW, China does solar projects about 8X as fast as the US. OTOH it does nuclear projects in about 5 years, about 4X as fast as the US.
This is not a good parallel as the HSR's cost comes in large part from traversing many counties, municipalities, and private land.
If you want to compare impact on actual energy generation, look at the growth in total net numbers:
The largest rate that nuclear ever grew was around ~200TWh for some years in the 80s.
Solar grew by ~300TWh from 2021 to 2022. Wind grew by ~200TWh. And the growth rate is still increasing exponentially.
For reference the world population grew from ~5 to ~8billion from the 80s until now, if you want to take that into account when comparing the growth rates.
What we should do, is keeping existing nuclear plants running as long as economically and safely possible. Emphasis on economically and safely, because those two points meant that the German reactors did run as long as possible, they even got an extension granted from a Green minister.
That's absolutely not true. 68 GW nameplate capacity, or, say, 30 GW effective capacity, is a very small amount. The US consumed 4 Trillion kWH in 2022 [1], which, if assuming a peak consumption of twice the average, means up to, say 2.2 10^12 W. 68 GW is 6810^9 W, or 3% of the peak consumption.
Even if my cocktail-napkin math is off by a factor of 2, that's still not much more than offsetting demand increases. And even if there were no demand increase - "aggressive" would mean 4x that amount, to be able to phase out fossil fuel power by 2030 or so.
[1]: https://www.eia.gov/energyexplained/electricity/use-of-elect...
China does. They will be completing 60-70 GW worth of reactors in the next decade, planning to take nuclear power from 2% of their electricity production to over 10% eventually. (While also building crazy amounts of solar, wind etc.)
But that'll rarely happen.
I absolutely hate the current state of energy reporting in general. The writers of these articles are not even trying to make sure they report accurately.
E.g. the battery stats: Is it MW or MWH? Both are very different and the distinction is important. A battery that can deliver 380MW but only for 10 mins is pretty useless.
(That said, I do dislike units like BTU or "billions of kWh," but they are at least correct units for the quantity measured)
I am too lazy too look up, and link, those publicly available numbers again....
For instance, it's possible to discharge the battery during the day, as well. If peak load is in the afternoon, the plant could be charging the battery during the morning and mid-day when specific demand on that plant is less than 690 MW, then discharge the battery to have (temporary) output of 1 GW.