At the same time, I have now done software engineering for over a decade, in many roles and teams, and I have never seen Agile or Scrum to lead to the development of a good piece of software. I guess we were using it wrong.
Their manager got an “agile PM” forced on them and it broke.
The problem is charlatans, dictators and career ticket shufflers that deliver little to no ROI and generally abject chaos.
The only time I've ever seen this not happen was when we had a 55 year old delivery manager who viewed his job as facilitating team meetings in a way that meant everyone got the chance to speak and that consensus formed. Didn't try to dictate process or anything, just made sure everyone got heard and that decisions got made. He was patient enough to wait and not force the issues, too.
(I refuse to utter the above phrase without accompanying it with tjis: "not everything that counts can be counted")
You will still get cold emails and LinkedIn messages from these people but you don't have to respond
I still don't understand the role of PMs when there are engineering managers, product owners and self-organizing teams involved.
If it’s not described, and only works via the “minds of a few engineers”, you get amateur treehouse-quality engineering like the 737 MAX.
I guess chance can make it work well like that “once” sporadically, but when you need to touch that code again to maintain it, we go back to the amateur treehouse.
And of course that is where the cost savings are usually made because it is seen as a null function in some businesses. It creates waste and reduces delivery and ROI. Those are all symptoms of other problems in the business but that's how it is generally perceived. And sometimes clients are happy to receive muck if it's cheap.
But that's also how we get planes that crash and Microsoft firing their entire QA and delivering shit for the last half a decade.
And that in turn is because management and project management culture is data driven by people who have no idea what the fuck they are doing whatsoever.
[edit] Too many of these people want tomatos, so they plant a tomato, when really they want seasonal tomatos, and need to consider a farm, and take into account growth cycles. The term I like is "sustainable development."
Then the CTO left, and was never replaced, then the layoffs came and a competent PM was replaced with a junior. Entire design department replaced with a single junior as well. Engineering gutted. Ok, lay-offs happen but at least I still have a job.
Then came “we’re waterfall now”. You know what didn’t come with it? Actual planning, documentation or specs or anything typical of “waterfall”. Estimates are now guessed before anything is defined and turned into commitments. You know what we still had? “Daily stand ups”, “backlog grooming”, two week “sprints”, and no retrospectives. No opportunity or agency to try to make things better - just endlessly stuck in my own personal hell.
Now we have projects that are supposed to take 2 months now taking 6. We have last minute spec changes that require massive rewrites because UAT isn’t done until the end of the entire project. “PM is slow to write out requirements” so we’re basically expected to just guess what they are based on very small selection of unfinished design flows.
And of course, executive wonders “why does engineering take so long to deliver”.
I started calling this “scrumerfall” or even ”fragile”. It’s basically the worst of both with none of the positives.
I don’t know what point I’m actually trying to make…just get like ranting and this seemed like a good time lol
What I've seen the most is people putting up straw men in place of Agile, and proceed to attack the strawman in spite of being repeatedly pointed out they are pummelling a straw man.
Scrum fixed that by being as bad as it was precisely defined.
I can get what the originators of agile were getting at but they explained themselves super badly.
I think a lot of ppl forget that.
One of the nice things about scrum is that it has an official source who defines it and you can look at it to see what it is and what it is not intended to be.
The retrospective is where you can tweak the process, but you can honestly change things anywhere. Bad managers will resist change at any cost and will use Scrum as an excuse to resisting change, but that's true for any methodology.
The problem is it doesn't work when there's micromanagement, it doesn't work when there are waterfall-ish parts (eg: PMs not splitting tickets, QAs hogging releases). Scrum also doesn't work when the development team isn't empowered, or has no domain experts. But most methodologies also don't.
Just the typical "No True Scotsman" fallacy [1], happens all the time when there is no good defense of the position.
Sometimes the fakes simply do outnumber the real ones.
Just as product requirements can change, so can the way we work. Just like there is not one singular product that solves everybody’s needs, there isn’t necessarily one process that does that either.
You need to communicate with stakeholders then, to change requirements, explain mistakes, set new goals, and reprioritize tasks. Agile (SCRUM/Kanban/etc.) are designed with frequently changing requirements in mind. In SCRUM, this is done at sprint review/sprint planning stage. In Kanban, it's continuous process.
2) Look at the current state.
3) Decide what the product needs from you.
4) Do that.
5) Use git.
Steps 2 and 3 may involve communication. Step 5 is tracking changes. Have a PM that tracks main things people are working on and estimated dates (not dictated dates).
This is how my current job works and we are unbelievably productive.
A process is a hardcoded way of do thing, which is deficient because it cannot react to an ever-changing world
A better way to handle things is by defining "what" should be done, not "how" it should be done
You can use SCRUM/Kanban/SaFE/LeSS, hybrid or other Agile methodology, or no process at all, but it will not help when people are not trained to be proper part of the process.
For example, a PM may replace SCRUM meeting with a status meeting, because it makes his job easier, while PM or other M should not attend a SCRUM meeting at all, unless called in by engineers. The proper moment for interaction between PM and engineer are beginning/end of a ticket, sprint review, and sprint planning.