We will never know, we just know now that its cheaper to do solar and power storage than nuclear.
The scary prospect for all forms of energy is that wind and solar likely have a lot of runway, as does grid storage. Combined wind/solar + grid storage will fall under combined cycle natural gas this year.
Just to emphasize, combined cycle natural gas exceeds the carnot efficiency of a single stage combustion with additional heat cycles. That means it basically has maximized the physics of extracting energy from using natural gas. In the US natural gas is also basically as low as can practically be priced because it is a waste byproduct of the bakken shale in the Dakotas.
Natural gas beats all other fossil fuels and nuclear by quite a lot. And it CANNOT compete with wind/solar.
Solar still has numerous opportunities to drop between perovskites and some theoretical cheap multijunction manufacutring. Grid storage will see sodium-sulfur or some other cheap/dense battery tech in the next 10 years in addition to the steady improvement of sodium-ion and LFP chemistries already in mass production.
I would really really like to see a scalable cheap nuke plant that is only twice as expensive as solar/wind. But that massive 10s of billions in research and investment would have needed to start in the 1990s. And IMO would have been shunted to the same failed solid fuel rod designs rather than MSR or some other "radical" reactor design.
Nuclear will simply never be economically viable in the foreseeable 30 years. And neither will fusion.
Very very little is made/manufactured on site. You do not make turbines, computers, pipes, or much at all, on a construction site. You form, weld, pour, and assemble. The goal would be a standard design, to cut those giant engineering and custom fabrication costs to a small fraction.
You don't need to deliver a completed factory on a pallet to save costs (although that's possible with distributed small module reactors, as Asia is ramping up for).
The costs of the French nuclear scale-up: A case of negative learning by doing
https://www.sciencedirect.com/science/article/abs/pii/S03014...
All nuclear power plants made since around 1980s or so have been made in factories. The US (and other nations) use them all the time for their submarines- defense concerns correctly override environmentalists (and the oil companies backing them financially).
The problem is a solved one. We're rich enough to afford to tilt at windmills instead- for now, anyway.
They can now, see Small Modular Reactors (SMR).
1. Build prototype
2. Iterate on prototype.
3. In conjunction start standardizing and automating processes.
4. Achieve large enough scale to amortize the factory and process optimization costs over enough units to actually gain anything.
The “SMR hype industry” seems to be perpetually stuck at 1, not even being able to deliver a single prototype.
All the while talking like the factory already exists and SMRs are solved.
Somehow it doesn’t add up.
I don't know, I'm not a specialist. But this came up by doing a rudimentary search.
Both France and Germany figured out how to do this.
And then stopped building.
<facepalm>
You build a standardized design, and you build a bunch of them, and you overlap the construction.
Germany's Konvoi reactors were built for DM 4 billion a piece in the late 80s. At the same time, non-Konvoi reactors cost more than twice as much, DM 9.5 billion.
Apply the 88% cumulative inflation between then and now and you'd be at DM 7,52 billion, or € 3.9 billion.
Fortunately we are starting to build more again, so prices should begin to fall.