by weinzierl · 2y ago · 0 comments
From experience I 100% agree with this, but it always caused a certain cognitive dissonance when thinking about project management approaches.
A project is by definition a time bound one time endeavor. It is something where the crucial parts have never been done before. The unknown is the defining characteristic. Learning should be a defining characteristic as well, yet many approaches pretend it's a small part at best.
My working theory is that the majority of "projects" that are typically used as comparison with IT projects (like construction) are not real projects at all. Real projects are rare (e.g. Burj Khalifa).
In IT the ratio is the opposite. The real projects dominate and the "construction sites" are still the minority. But we can expect this to change.
Thinking this to the end would mean that we could see a resurgence of waterfall in IT - likely under a different name.
Typically, in construction projects, 90%[1] of the challenges are encountered and resolved in the design office by a multi-disciplinary, multi-organisation design team effort across multiple years...
[1] - Anecdotal evidence drawn from my experience as a structural engineer.
Sure the environment, circumstances and result differs for every construction project, but the variance doesn't justify to call it a project in most cases in my opinion.
We've built millions of modern bridges that are in operation and we've been doing it for more than 3000 years. The number of environments, configurations and requirements we've not already encountered is very limited and these are the real construction projects that - no doubt - do exist.
Now, contrast this with the number of CRUD apps we've built and for how long we've been doing it. There is still a lot to learn there.
That's the reason why more bridges are on time and budget than CRUD apps, in my opinion.
Even if you're working on a "project" comprising hundreds of near identical houses, there could be massive differences in the project constraints and their solutions for adjacent plots for any given selection of houses.
There could for example be a large tree with root protection zones on site where you would have to carefully design the foundations to account for this and their future effects such as heave due to volume change potential of the underlying soil.
My point is that there are many "hidden" problems solved by the design team during the project / design phase even for seemingly insignificant or simpler "projects". In my experience of analysing and designing hundreds of buildings for over a decade every project was unique and as such treated like a "project".
The point I am trying to make is that there are more unknowns in most IT projects than in many other endeavors because it is still a young field. If construction is the best counterexample, I'm not sure.
Building them might be messy, but rarely fails from a technical point of view.
I wish and believe we are getting there but I don't see it today.
Just as an example: I traveled a lot after COVID and almost every tourist attraction has a photographer or photo site and they upsell by offering you pictures. I have yet to encounter two attractions that use the same system, they are all different and terrible in different ways. They all do basically the same thing, so there is no reason not to have a standard solution. I have no doubt one will replace the existing solutions sooner than later. So, millions of them but I would hardly call them successful.
Them being messy is the collective learning process that has been mostly completed for real construction projects, but is still in full swing for IT projects.
Sounds exactly like small construction projects. I have heard this sentence almost word by word from somebody who owns multiple small rental objects.
Presenting as following "agile" gives a strong body of literature to fight this - and actually do something else. We've all seen the criticisms that nobody does agile right - and for many, thats deliberate.
How much time it takes to prepare the estimate depends a lot on the nature of the work though. If there's something pretty similar the team has done multiple times, and you have access to estimates/tickets/timesheets, you can often get it done in about 5-10% of the total project time. However, for example, if it's an ML project, there may be a lot of unknowns that have to be clarified first. For example, data quality is almost always not what it is claimed to be at the outset, so this needs to be resolved before the estimate is generated.
We can build bridges on time and budget most of the time because we've built millions of them in modern times and have been doing it for more than 3000 years.
In software we are not there but I have no doubt that we will, and hopefully it won't take us that long.
"Sure thing boss, come back in 25 minutes."