by organsnyder · 2y ago · 0 comments
Building a structure is a lot more than framing. For our project, the framers were on site a few weeks out of the six-month total.
I think modular pre-fab building is a much more effective strategy for this segment of the market. Perhaps 3d printing techniques can increase productivity there, but I'm not quite show how.
Especially since it's unlikely that we can address the housing shortage by building single-family homes.
It could cost $250k to legally build a sandcastle in Vancouver.
So things like property tax during the build period, as well as sales tax and service tax charged by the builders contractors. The study assumed a 5 year build period and multiplied all yearly property taxes by that amount. It also tacked on things like the vacant home tax and speculation tax which are not applied to properties under construction. Many of the taxes and fees are also scaled to the square footage of the house. Lastly they also included things like sewer hookup fees, which is really not an unnecessary cost for a builder to pay.
Permit fees are too high, and maybe we should exempt a lot of them given the current crisis, but this study is aiming for a quick headline. If you dig into their analysis it is a worst case scenario for what a house would cost for a foreign speculator who left the house vacant before flipping it and didn’t qualify for any homebuyer tax exemptions.
A lot of those taxes and fees wouldn’t apply to a sandcastle is what I’m saying. The $250k figure is the number they quoted for a $900k 2-bed new-build condo in a transit corridor. Even in their own study the lower cost housing units were coming in at half that.
Not enough physical resources?
People working in the wrong jobs?
Or just, we won't?