86 points · by edward · 2y ago · 168 comments
Technically private property, but also already shared, public space.
One random house I think they still own is Julia Child's childhood home in Pasadena.
Which of those actually seems more fair?
It seems like this is just a way for the average taxpayer avoid paying for the asset they want.
Major social projects should be selected based on the value they provide to the public at large, and paid for by the public at large.
There are other types of public-private collaboration available if the goal is to benefit a niche group.
If it actually cost $8B, I would have supported it.
The other thing to think about is what is the alternative - road or airport construction in california is not cheap. Replacing 2 bridges on I-5 in stockton is going to cost nearly $1b alone.
And I think a lot of the benefit won't just come from the main SF LA route, it'll be intermediate stations to SF or LA too. It'll only take 19 minutes to go from Palmdale to LA for example - compared with 1hr+ now. In a way it would have been better to have the IOS be one of those routes, but they are also the most difficult geography.
Is there evidence that people will want to pay the high price of such a train ticket... And then what, once you're in LA? The last mile problem in LA and San Francisco (mind you HSR is not currently planned to enter the city, and BART is insanely expensive) is real.
The second that I have seen is codified labor specialization. This leads to many more workers on a site, where each has a niche role, but low workload.
The US does have some real problems though, the built in america stuff kills projects like this where there isn't a US supply chain in place. And the US tends to have very high standards for "safety" for rail especially.
Keep in mind that you can't compare all projects like this. CAHSR total price includes trains, stations and (probably?) operational costs for x years. You often can't compare two projects on a like for like basis.
(Germany isn't much interested in the project.)
How did you come up with that? It seems that the tunnel is $450m euros per km, while SF to LA will be $80m per km.
Building rail is a nightmare here as well because nimbys reign supreme.
Because let’s be serious - California doesn’t actually need high speed rail.
No one sane wants, or needs, to rock the boat - especially since doing so just gets a giant eye of Sauron pointed at them. Extra bonus? Turning the crank endlessly on this while everyone complains gets them rich.
Also HSR is something that a large contingent of people in CA have been kvetching about for decades, not sure your "everyone is afraid to say anything" holds water here.
Not only is 100 billion a bad deal, given CA’s track record they could easily spend $200 billion and never complete it
Another important factor here is the cost of construction: the California project will all be above-ground, AFAIK. However, a significant portion of the Tokaido line between Tokyo and Osaka is through tunnels, so the difficulty of construction was far greater.
For a more apples-to-apples comparison, Japan is currently building the [Chuo Shinkansen](https://en.wikipedia.org/wiki/Ch%C5%AB%C5%8D_Shinkansen) line between Tokyo and Nagoya (286km/178mi), which will be a 505km/h maglev train that's 90% underground, as they have to tunnel through various mountains. It's projected to be finished in about a decade I think. Current costs have risen from the initial projection, and are at about 7 trillion yen for the first leg (Shinagawa to Nagoya), which at the current exchange rate is about USD$44B. But remember, that's about 160 miles of tunnels through mountains, plus all the rolling stock (which doesn't actually roll LOL), including the deepest tunnel in the country, and a line which isn't even conventional rail, it's a maglev track. By comparison, California is spending all that money on an above-ground train, in a place with excellent weather, using the same rail technology Japan was using 50+ years ago.
Your Japanese example comes in at about $23 million/km built.
I was recently looking at the costs of the Paris-Strasbourg line (opened in 2016), which cost €5.15B for 406 km of track, so about €13 million/km.
It’s simultaneously too much regulation, and too little government oversight.
https://www.vox.com/22534714/rail-roads-infrastructure-costs...
In Japan and China they have trains running in excess 0f 250 mph. In America the only train I know over 100 mph is the Acela which runs from Washington D.C. to New York City. Although they are promising that Acela will go 150 mph sometime in the future. France had trains going over 150 mph in the seventies when I was first there.
First, Japan doesn't have any (operational) trains going 250mph. The Tokaido shinkansen between Tokyo and Osaka has a top speed of 300kph, which is 186mph. The Tohoku line in north Japan reaches 320kph (200mph) according to Wikipedia, and this seems to be the fastest in the country (I haven't ridden that one myself, but I have ridden the Tokaido multipel times and verified its speed with a GPS speedometer app.). The new maglev Chuo shinkansen, when it's open for service in 10 years, will go 505kph (314mph). China does have some maglev train currently; I can't be bothered to look up its max speed, but it's a short line that just goes to that city's airport. It's not a long-distance train line, really more of a demo.
America has at least 2 trains that go over 100mph: the Acela, which runs from DC to Boston (not NYC), and the Northeast Regional, which runs on the same route on the same tracks. The Northeast Regional hits a max speed of 125mph, and the Acela hits 150mph. The catch is, these trains only hit their max speeds for somewhat brief durations on certain parts of the line (mainly between Philly and Newark NJ), so their average speeds are actually rather lousy because in other places they have to slow down a lot because the track sucks, the tunnels are a century old, there's a cargo train in the way, etc. If the US built an all-new track (with new tunnels where needed) between DC and Boston, they could use the exact same trains they use now and have much, much faster average speeds, but they really don't want to do that.
Finally, there is a definition in the US for "high speed rail", and the Acela meets that definition because its max speed is pretty high. (Of course, the definition completely ignores average speed.)
I am not holding my breath that it will come in 10 years, or even in my lifetime.
It's amazing how long it's taken, how does a train take over a decade ?
Even just high speed from Bakersfield to LA would help tons of people.
There's no reason we can't have high speed throughout the nation. Imagine taking a train from LA to NYC in 30 hours.
Too many pockets to line...
Who is the customer for that ticket?
That probably is not enough to make a train line profitable (they have larger capacity than airplanes, and you’d need fairly frequent service)
Luckily, as the crow flies, it is about 4,000 km from LA to NY, so a train route connecting population centers would probably be about 6,000. With a fast train (300+ km/hour top speed), the target of 30 hours will allow for some stops.
That will increase demand, with most passengers doing only part of the route.
Denver to LA in 15.
I largely hate flying even though I've accepted it's the only way to travel overseas.
I'd love to take the full 30 hour train ride vs the 70 it takes now
Long train journeys are a thing for some- with a private car there's also the appeal of views out the window while working on a script | program | report and having a car on a transport flat behind.
Not for everyone, but there are customers.
A tiny, insignificant number which could never justify the cost
With security and other hassles you basically burn a day in flight; so 30 hours NY/LA and being able to sleep, have high speed Internet, make normal phone calls, move around a bit, and eat (hopefully) normal food would not really cost any more time.
How long is that train ride going to take when a guy kills himself on the track?
We are a nation of middlemen. Everyone at every level needs their cut and we will invent more levels if there is a possibility of money being left on the table.
Honestly, as some living in France, with a lot of high speed train lines, I'm not surprised. For example one of the most recent lines [0] took more than a decade.
[0] https://en.wikipedia.org/wiki/LGV_Bretagne-Pays_de_la_Loire
By airplane, I imagine the total time from Los Angeles airport to San Francisco airport, including wait times to board and latter to pick up luggage, may be around 4 hours?
Just crossed my mind quickly, I did not made numbers.
It really is sad just how hard it is to build anything in the US at this point.
As a San Diego resident, it's also sad that it was a state representative from San Diego that first introduced this idea to the state legislature, and yet now, San Diego has been dropped from the planned route. 8-(
Why does the government keep trying to do these giant infrastructure projects that puts billions of dollars in the pockets of consultants and have very little chance of completing on time and on budget?
Why does socialism keep creeping into every inch of our republic? Leave these ideas to private industry which is proven to be more efficient over and over again....
I ask because it didn't in previous iterations.