by bob1029 · 2y ago · 0 comments
Based upon press releases from Entergy[0] (north of Houston/Centerpoint) a quarter million feet of wires need to be fixed. This doesn't include transformers, logging operations, etc.
I would estimate that Houston itself (Centerpoint) is probably dealing with a million+ feet of damaged transmission lines based upon the stats up here and their reported customer outage #s.
The area I (used to?) live in wont have power until the 14th because of the damage to the distribution infrastructure.
This is 99% a game of trees falling on lines and everything cascading from there.
So that 480 miles or so is probably less than a fifth of the total repairs needed.