by ChuckMcM · 14y ago · 0 comments
I'd love someone to actually do a credible cost analysis of an evacuated tunnel train. Unfortunately I don't think Oster did.
[1] http://secondavenuesagas.com/2010/01/14/the-costs-of-second-...
1988 $3.6 billion = ~$7 billion today[3].
1994 $21 billion = ~ $32 billion today[4].
Put it altogether, the tunnel itself would be around $3.5 trillion[5]. Maglev + vacuum stuff would cost more.
(BTW, I love WolframAlpha for stuff like this.)
[1] http://en.wikipedia.org/wiki/Seikan_Tunnel
[2] http://www.engineering.com/Library/ArticlesPage/tabid/85/Art...
[3] http://www.wolframalpha.com/input/?i=%24US3.6+billion+1988+d...
[4] http://www.wolframalpha.com/input/?i=%24US21+billion+1994+do...
[5] http://www.wolframalpha.com/input/?i=%28%28%2432+billion%29%...
A better comparison is an actual underwater tube: http://en.wikipedia.org/wiki/Transbay_Tube
3.6 miles cost about $1 billion in 2012 dollars. Closer to $55k/foot.
Don't get me wrong. This is still impossibly expensive even at that lower rate: $22 trillion.
Even at using costs of the propsed high speed rail in California ($80M/mile), nyc-london would cost $280 billion.
Which is roughly 1 / 14th the cost of the Iraq war. Not bad if you think about it.
2006 revenues: $2440 billion
2012 revenues: $2660 billion
2006 spending: $2660 billion
2012 spending: $3790 billion
2013 spending: $3803 billion (Obama's proposed budget)
[Source: Wikipedia.]
Just think - we could do three or four megaprojects a year with a 2006-esque budget elsewhere plus those kinds of budget deficits.
Of course, as anyone in California is painfully aware, the high-speed rail project is a complete joke :) you'd need to trust that this one would do better.
Also, as an economics aside: In the private sector, a $280 billion project should hope to earn in the neighborhood of $11 billion a year in profit/savings in order to cover the cost of capital. This is, of course, after equipment maintenance, fuel/power, deprecation, labor, etc.
The nice thing about a transatlantic tunnel is that crustecaeans can be bought off cheaply
The various environmental organizations aren't going to be bought off cheaply.
If you get the sierra club complaining publicly about the tunnel, you instantly have about half of the politicians in the country in favor of it.
I can't imagine it'd be more expensive than tunneling 3000 miles under an ocean.
(San Francisco's rail connection across the bay uses this technique)
Which is enough to drop drag a lot, and still maintain lift in, say, commercially viable air transportation vehicles.
Lowest costs I've seen to LEO are about $1,000/lb. Suborbital flight isn't much lower than that, and we're still looking at something on the order of $10k - $1m per passenger at rates like that. Affordable to some, but (considering you've likely got a baggage, life support, and related allowance) pretty pricey all the same.
$10k is comparable to Concorde, as I recall. I consider that a very optimistic estimate.
In other words you're talking about sinking 3 meters of tube that would weigh 76 fewer pounds than if there were air. This is probably a small effect compared to the weight of the strong metal casing that would need to surround such a vacuum.
So since we can sink normal air-filled subways quite normally (e.g. the BART in San Francisco) this must be a well-established technology.
It will _want_ to collapse. It's not sitting there doing nothing.
Who knows what this claim is based on, but it is there.
The firm fixed bid for the 96-mile (154 km) Evacuated Tube Transport (ETT) system was $253M, this was less than one tenth of the cost of the bid by Global Rail Consortium to build electrified double track High Speed Rail for $2.6B. The bid by et3 contained letters of support by three entities in China to supply IP and key materials for the project. The engineering consultants hired by the authority did not dispute the validity of the et3 bid price or ETT technology, but recommended to eliminate the et3 bid from consideration for other reasons.[1]
This comment doesn't pass judgment on whether Daryl Oster is a patent troll or not, but that's also a discussion worth having.
Edit: add this update --
Interestingly this link: http://www.freerepublic.com/focus/f-news/843626/posts claims that the ET3 bid was 1.2B$ which is $12.5M/mile which is a lot more credible (still low though since the surrounding infrastructure to keep the tube evacuated, the mag lev stuff, etc all add cost over regular fused rail electrified service (which California is considering for its fast rail) and that is looking closer to $25M/mile in the current state of the art)
Part of it is that some folks really hate rail, so much so that they will continually sue anyone who is working to build it. They will argue wildlife endangerment, habitat destruction, cancer risk, suicide risk, traffic risk, earthquake/disaster risk, global epidemic risk, job preservation/creation/destruction risk, you name it. Anything to get back in court and have a judge temporarily suspend work. Because you hire someone to work on a project, and they can't because of some court order, you still have to pay them. So what happens is these projects have 'burn rates' (which is the cost of renting equipment (or depreciating it if you own it) and labor and materials (some of which degrade over time if not used)) and then you have 'able to work' days. Actual work days might be 90 for a mile of track, but time actually passed is like a year. So the other 275 days people sat on their hands while expensive lawyers argued to get work restarted.
Its one of the things I bring up at town hall meetings with politicians. The tax payer, and the 'NIMBY' [1] folks, fight a very asymmetric kind of warfare. No court challenges until funds are committed, and then six. You need look no further than the maneuvering around the California High Speed Rail project to see it play out in all of its ugliness.
[1] NIMBY -acronym Not In My Back Yard for people who are opposed to any new infrastructure near where they live.
Modern trains also are heavier and accelerate and decelerate faster than the trains you see in westerns. Both mean that they exert greater forces on the rails.
Finally, safety standards are way higher. That means that material must be of higher quality and tested better, both at the factory and after installation.
[1] http://tacnet.missouri.org/history/railroads/rrcosts.html
Don't forget every 10m adds 1atm water pressure. Building a glass enclosed under sea walkway 30m down is not that much harder than building one 20m down and these projects are going to be using glass.
It's 50% harder.
What pressure are the passengers exposed to?
I ask because 1 hour @ 4 atmospheres of 80% N2/20% O2 is risking decompression illness. (Yes, 4 - you've got 1 atmosphere at sea level.) You can reduce that risk by increasing the O2 percentage but if you do that too much, you're risking O2 toxicity.
Firstly: As I see it, an evacuated tunnel at 20m is a very different proposition to a non-evacuated tunnel at 30m, even if the pressure difference is the same. Why? Well, your big problem is always going to be leaks. In an air-filled tunnel you can get away with microscopic cracks, no problem; you've got a small direct interface between water and air, and the surface tension of the water is enough to keep the water in place. It's very hard to force water through a really tiny crack. In a vacuum, however, surface tension goes away -- liquid water at an interface with vacuum will boil, and all of a sudden you've got water vapour filling your nice evacuated tube through every microscopic crack in its five thousand mile length. Nasty. Clearly the joined-concrete construction used for the Transbay Tube isn't going to be sufficient.
Secondly: unfortunately the Atlantic Ocean isn't 20m deep, or 30m deep, or even 40m deep like the deepest point of the Transbay Tube. It's several kilometers deep.