The longest submarine power cable in the world - the Viking Link - is a mere 756 km long and cost US$2.2bn to build. Sun Cable calls for a 4,200km submarine cable to be built!
I do not expect the construction cost to scale linearly and I shudder to imagine the maintenance difficulties and expenses.
Back in December 2015, Australia's 290km long undersea Basslink cable broke causing the 2016 Tasmanian energy crisis. It took 6 months to get it working again. Basslink eventually went into receivership on 12 November 2021.
Something to ponder.
In addition, the boats that service these cables are mostly in the northern hemisphere, where most of the undersea cables exist. So there was a ~5 month wait on the repair. I'd expect a 4000Km cable to have it's own fleet of boats for servicing.
I can understand that the combined probability of breakage along the line could be a maintenance problem but the construction cost should have many amortizable components that deliver some sort of economics of scale.
I haven’t done the math so I have no idea on actual viability or if it’s a good idea or not.
https://en.wikipedia.org/wiki/Champlain_Hudson_Power_Express
https://www.pv-magazine.com/2021/11/15/chile-wants-to-export...
Also, is it just so heavy that it doesn't need to be secured?
People setup undersea telegraph cables the 1800’s. This is similar technology just with a thicker cable to carry more current etc. https://en.wikipedia.org/wiki/Transatlantic_telegraph_cable
I also would like a magic pony.
At this scale it's not even mainly financial, it's opportunity cost and geopolitical considerations, on both the pro- and con- side.
This is why they aren’t breaking things up into several shorter hops to various islands on the way.
20GW solar farm, 42GWh battery, 3 cables totalling 12,900km of HVDC cable, $23 billion cost.
It passed government environmental requirements, a milestone for the (private sector) project’s promoters. Articles should be read a touch more carefully and cynically before jumping to outrage surely?
Don't know the details of this project but if the cable is subsidized by the government it doesn't matter if it scales super or sublinearly, taxpayers are on the hook.
a) Politicians are typically more educated than say in the US.
b) They rely heavily on the public service who are experienced to do the heavy lifting.
c) The jobs aren't in the areas that matter for Federal elections.
As exhibit 'A' for the counterargument, I offer Kate Worden: NT's Minister for Environment, Climate Change and Water Security. Did you see her interview in Monday's "Water Grab" report by 4 Corners [1]?
One example of her logic: Farmers are planting circular fields, which is what you do for a central pivot water irrigation system, and Woden is saying with a straight face that irrigation is not being used and the cotton crop is only relying on rainfall with no dams or groundwater extraction involved.
Some choice words from the interview are that she is "sick of the science". There are lots of other goodies.
Her interview is a masterclass in ignorance.
Also the way data packets go - they can go literally from any of the lines and get assembled together somewhere in the network layer. But same doesn’t hold true for 3 phase power. So same that works for internet wouldn’t be applicable for power distribution.
I would have guessed there must be enough domestic customers or in Indonesia that would make more sense.
In turn, that means voltages can be higher, letting one use more of the cheaper PVC or XLPE insulating material and less expensive aluminium for the same amount of energy delivered a large number of kilometers.
To be honest, I don't think we're many decades away from the cable+conversion stations themselves cost being irrelevant, and the administration costs, land purchase costs, etc dominating.
Why do you believe these things are related?
HVDC lines operate in the hundreds-of-kilovolts range. For example, https://en.wikipedia.org/wiki/Basslink operates at 400kV. There are no MOSFETs or JFETs directly involved in stepping down that power.
If you can have the conductor 1mm^2 thinner (capable of carrying less current for the same heat production) and the insulation 1mm^2 thicker (capable of handling a higher voltage) and transfer the same power, then you'd save money.
It only works up to a certain limit obviously - the relationship is non-linear and there is an optimal point.
The actual tradeoff involves a lot more modelling, because you need to consider all kinds of other factors, not just the costs of the conductor and insulator.
The reactive component has significant impact on the generation equipment and grids. It also causes the Ferranti effect, where the voltage along the cable rises. This can make managing the voltage within the cable difficult because at no load, the load end has a higher voltage than the source, and when loaded, the middle of the cable has a higher voltage than both ends.
During stable operation these effects can be managed with Statcoms, shunt reactors and voltage regulation tap changers. However during transient operation you will be relying upon the static protective devices such as surge arrestors, depending on how large the transient is.
DC transmission does not suffer from the same reactive power component and has less losses, but it does require large convertor stations at both ends.
On top of that, you also have losses to the cables capacitance with AC.
But DC has the cost of the conversion stations to consider - both capital cost and efficiency causing operational cost.
Aluminium is far less dense, which in turn makes the whole cable bigger, which has other costs (eg. fewer kilometers of cable fit in a boat). Usually it's still the best choice overall though.
Australia is a big place. The northern tip of Australia, where this project is based, isn't really that much further from Singapore than from the Australian population centres in the South East of the continent.
Indonesia is much poorer than Singapore, and has awfully inefficient bureaucracy and regulatory environment.
they're doing unrealistic nuclear proposals, because they know it takes a long time to ramp up, and in the mean time, their buddies' investments in the coal industry gets time to exit and profit properly. It's designed to prevent losses in fossil fuel investments.
Not to mention that australian nuclear cannot be profitable imho - not when solar is so cheap. Their current proposals for nuclear basically requires taxpayer subsidies.
https://www.csiro.au/en/news/all/news/2024/may/csiro-release...
Meanwhile nuclear is feasible in China, South Korea, maybe in the UK (who are well into sunk cost on their next reactor already), and probably in the US.
And in that time span as well, solar power will increase its efficiency.
And then batteries, to store and deliver that power outside of generation hours, are a parallel to that.
If a nuclear power plant could be built quickly and simply, the equation would be different.
Unfortunately, from the limited amount that I've read, nuclear power plant projects often run over time and over budget, exacerbating the time scale issue I described above.
https://blog.rootsofprogress.org/devanney-on-the-nuclear-flo...
"Nuclear followed the learning curve up until about 1970, when it inverted and costs started rising"
https://news.ycombinator.com/item?id=41220499
If Australia refined _all_ of the 40,000kt of Bauxite we export each year into "frozen electricity" Aluminium, that'd only require about 600GWh, or about 4% of the 1.7GW 24x7, or 15,000GWh per year this would send to Singapore.
Large datacenter are in the 100MW sort of range, so only single digit GWh per year.
Australia generates a few hundred TWh per year. 272 TWh in 2021/22 - or 272,000GWh, around 20 times what this project will export to Singapore.
Data centers and Aluminium and Iron smelters are big electricity consumers. But they barely even move the needle compared to cities with millions of households.
It might or might not be a good idea. But you need to then compare those massive investments to the relatively modest investment of the power cable to bring the electricity to a part of that world that already has all the other infrastructure needed, and also already has lots of water.
Not a big deal, if your grid can handle the loss, but this certainly can’t be the gameplan for the bulk of your power.
In Singapore's situation, they can probably invest assuming that they are not in a military conflict with anyone. If they get into a war with anyone who can cut that cable they will be returning to the stone age anyway. If Indonesia objects to them they will go, if someone with the power to coerce Indonesia objects to them they're in deep trouble.
Wikipedia gives an estimate of $1.47 trillion for Indonesia's GDP in 2024. The estimate for Singapore is $525.228 billion. The factor seems to be less than 3x. Where do you get 5x from? Are you going by PPP or so?
> In Singapore's situation, they can probably invest assuming that they are not in a military conflict with anyone. If they get into a war with anyone who can cut that cable they will be returning to the stone age anyway. If Indonesia objects to them they will go, if someone with the power to coerce Indonesia objects to them they're in deep trouble.
You can't make those assumptions, if you don't want to be bullied. Singapore doesn't have that cable right now and we ain't in the stone age. That situation ain't no different from having a cable, but it being cut.
Presumably those in Singapore have a lot more buying power though. And the politics are more favourable for big capital investment projects.
Shopping calculations for them need not be about economic cost benefit analysis.
But there's also no good reason not to apply cost/benefit analysis.
> Singapore with a native population of about 4 million has reserves of about $1 trillion. They can afford to splurge to claim green/net-zero status.
Of all numbers to bring up here, why did you pick foreign exchange reserves? GDP or wealth might be more relevant?
Reserves are cash in hand and represent immediate and hard spending power.
Land is in tight demand with food a priority over panels and issues that may not be apparent (clear slopes leads to instability, and keeping them clear is a Sisyphean task, etc).
https://www.reuters.com/business/energy/billionaire-cannon-b...
https://www.abc.net.au/news/2023-01-11/sun-cable-enters-admi...
I guess MCB found a way to make it work pending future investment that may not occur until 2027: https://www.abc.net.au/news/2024-08-21/suncable-receives-env...
> The approval paves the way for the next phase of development to deliver industrial-scale electricity to customers. But it still has some way to go, with a final investment decision not expected until 2027.
and
> However, SunCable still needs to negotiate Indigenous land use agreements with a number of different traditional owner groups along the transmission line route to Darwin.
I understand that it would take much more than just the cable between the two continents to make this work - right now there are issue on the continents themselves to get the electricity from one place to another. But with the sun shining most of the time on one of those two continents and with other (hopefully renewable) energy sources on either side of the pond, we might get to have green and cheap energy!
https://www.current-news.co.uk/uk-us-transatlantic-interconn...
Weirdly enough the latter is projected to cost less than the now infamous Hinkley Point C nuclear power plant.
On top of that there is the energy security problem, even if Morocco is less likey than Russia to try and play tricks.
I wish them all luck, but we can't forget the advantages projects has before leaving Excel.
A cable this long will be vulnerable to attack by any country that has submarines.
How is it going to be guarded?
By the way, do you know what cost the most money on the HPC project? Loan interests, by a very large margin. Because of the risk of project failure given the lack of government guarantees, they had to borrow at a baffling 9% interest rate in a world if zero interest rate. This is the insanity that drove the cost to the sky, not the engineering side of things.
Anyway, in my comment I was referring to the original estimate of £22bln, which is higher than the £18bln for that HVDC project and that's disregarding inflation.
And it's like that with every nuclear power project in Europe and the US, save for the one in Belarus, though it needs to be said there were some complaints about corner-cutting there - seems to be doing fine for now, knocking on wood.
That sounds very interesting, do you happen to have a source nearby? I would love to have that one in my back pocket next time i end up in a discussion on nuclear power.
This is the first time I've heard of this, so I did a little digging.
> Lazard assumes investors want a return of 12% and bond holders will accept an interest payment of 8%. These are kept standard across all types of generation as the intention is not to assess the risk of the project but instead the competitiveness of the technology.
> If Hinkley was to pay these commercial rates, the project construction with interest would balloon out to close to $70b. But they didn’t and digging into EDF’s financial statements shows interest costs related to construction was only 1% of capitalised costs in 2017 and 4% in 2021.
https://illuminem.com/illuminemvoices/nuclear-economics-less...
The Finacial Times article from 2023 puts the cost increase elsewhere:
> The increase, caused by surges in material prices several billion above the most recent estimates, is nearly 80 per cent more than the cost of £18bn in 2016, when EDF first started work on the project.
https://www.ft.com/content/ae5fb399-08ce-4045-bb70-45a6531ac...
And directly from the horse's mouth, in the EDF's status update from 2024:
> The costs of completing the project are now estimated at between £31 billion and £34 billion in 2015 values. The cost of civil engineering and the longer duration of the electromechanical phase (and its impact on other work) are the two main reasons for this cost revision. If the risk of an additional delay of 12 months mentioned above in the final scenario does materialise it would result in an estimated additional cost of around £1 billion in 2015 values.
https://www.edf.fr/en/the-edf-group/dedicated-sections/journ...
----
The only reference to the 9% figure you mentioned comes from a BBC article from 2018
> However, Dieter Helm, professor of Energy Policy at the University of Oxford, told the BBC that the government shift made sense.
> "The sheer cost of building new nuclear power stations means it makes sense for the government to help finance projects like this," he said.
> "Governments can borrow much more cheaply that private companies and that lower cost of borrowing can drastically reduce the ultimate cost. Hinkley Point C would have been roughly half the cost if the government had been borrowing the money to build it at 2%, rather than EDF's cost of capital, which was 9%."
https://www.bbc.com/news/business-44363366
I couldn't verify it anywhere else though. Can you point to a source from the EDF that confirms the loan interests cost the most money on the Hinkley Point C project?
This is already in the works and secured financing recently. It’s a smaller link but it’s a start. Also Tunisia trade electricity with Libya and Algeria; so technically they could be selling electricity to Europe through that link.
Alas during the previous Trump presidency, Europe saw that modern Republican 'America First' thinking doesn't just call for a wall with Mexico, a travel ban with Muslim countries, and a trade war with China - it also wants a trade war with Europe.
And linking the south of Spain to the north of Morocco only needs ~200km of undersea cable, rather than the ~6000km an EU-to-US link would call for. That's a pretty big benefit.
> "... Renewable energy developer Sun Cable has secured approval from the Australian government for the Australian element of its Australia-Asia Power Link (AAPowerLink) interconnector. ..."
So they have licence to make the PV farm, and to cable it to a head-end, and to run HVDC to the edge of Australian Exclusive Maritime Zone.
What happens after that is still subject to other people.
There's hope of a domestic customer as well. That's important because the location is pretty unpopulated and otherwise under-developed. Prospects for onshore HVDC to customers are low right now: the closest thing is a service called "Copperstring" targetting the mining/metals industry being done in Qld but its about 1000km away and there are few customers except at the end of a long line
That aside, Darwin and Port infra will be there but on the normalised "3 million homes" model of scaling Darwin is 60,000 homes or less.
Meanwhile the peak of solar generation around midday in Australia is being sent off to Singapore in the morning who are a couple hours behind us. Presumably the morning is when the least AC will be used there. By the evening in Singapore, it'll be night in Central Australia, meaning there will still have to be plenty of peaking generation or, will need a massive ton of batteries which has still not quite there for grid scaling.
If this project is viable, then it'll probably be more viable to have a massive solar farm coming from India, where the timezone shift is in the correct direction, and it would outcompete Australia.
So either way you need batteries, and all the problems they bring. Just about "how many".
I did originally see a graphic which showed somewhere around Broome as the connection point.
“May 2023, a consortium led by Cannon-Brookes' Grok Ventures won the bid to acquire Sun Cable,[7] with the takeover finalised on 7 September 2023. The revised plans involve supplying electricity to Darwin by 2030, and to Singapore a few years thereafter. ”
I hope that the decommissioning of this kind of solar farm is better managed thant the likes of the Northern Endeavour FPSO, where Woodside offloaded it to a small company to dodge the decommissioning costs of the field, leaving the taxpayer to foot the bill[1].
[0] https://en.wikipedia.org/wiki/Australia-Asia_Power_Link [1] https://www.industry.gov.au/mining-oil-and-gas/oil-and-gas/o...
Maybe there are already vast fields of solar panels like that, and I just haven't seen it before?
I feel like I saw it at imax, but it seems an odd topic for an imax movie?
So presumably this whole bit of climate theater has a lovely feel good story.
And it does not prevent any other private investment projects to generate and sell green electricity to Australians. Australia isn't exactly short of sunshine, and the Chinese will happily sell you all the solar panels that you could ever want.
I'm must completely be missing something. We can't get renewables into our own grid let alone over the hemisphere.
And yes, I did do the maths; and also yes it's really just China at the "global terrawatt" scale (they've become a dominant aluminium supplier), but a much smaller distance and power rating is probably fine even if China doesn't sell you the metal.
With a typical HVDC line not exceeding 1200mm2 conductor cross section it's about 13k tonnes, so 0,025% of global aluminium production.
Still, you could wrap the world around at the equator with this for a paltry $40bln. Now scale that 10x and you have yourself a practical global grid solution for what, $400bln? That's less than half the US military budget - absolutely doable if you get enough economies on board.
Technically right but I think you mean 1200mm2 (a radius of approx 20mm)
I actually had an autocorrect suggestion for "1200m2" in there for some reason.
Australia is obscenely well-positioned to be a solar energy powerhouse. So much open and uninhabited land, geologically stable and uniquely suited climate with a ton of sun all year round.
Could have done it sooner with more political will, etc, etc. But I'm so over the whole renewables and climate change debate (still very much alive here sadly). We're way beyond the time for talking and into the time for action, and seeing this project pull us into a more sustainable world is awesome.
That makes for a 20h energy storage at full power, and a big enough power reserve to recharge that storage during the day while delivering at full power. Likely a reserve for morning/evening/clouds. Easy to add more storage.
So, it's a 2 GW power link, not a 20 GW power link. It's a 20 GWp site, and that's impressive too. At 200 Wp (STC) per sq m, that is 100M m², or a 6 mile square not counting any access roads. Huge, but if five of these is all it takes to power Singapore, then I guess we're looking at a bright future.
Yup, my bad. Title is wrong but I can't change it now. I was looking for quick figures and saw the solar capacity numbers and put them. It seems only about 1.75 GW are actually planned to go through that link.
p.s. @dang doesn't work, which is why I didn't respond to this sooner. For guaranteed message delivery, you (or someone) need to email hn@ycombinator.com.
We have to, otherwise the solar panels wouldn't work.
I don’t think microwave beaming is ever viable
Most fusion concepts are thermal power plants. Those have inherent downsides that have nothing to do with the nuclear energy providing the heat for the steam turbines. So they will never fully replace renewables. Helion’s concept might work. But that remains to be seen.
It's an often used qualifier to dodge what can turn out to be meritless predictions. Just long enough into the future to sound promising, but also far enough into the future to not tempt a need for supporting evidence.
In my view if we don't have the underpinnings or motivation today to support such forward looking statements, then there is no genuine foundation for claiming that the situation will improve merely as time moves on. Technology only comes about when we make it, and only develops rapidly when there is a significant motivation for putting serious manpower behind it.
One could just as easily say that we'll have small and portable fusion reactors that completely satisfy our energy needs.
Please enough of them far away from Earth and you get pretty much unlimited energy all year round.
When land becomes the limiting factor on earth.
If they feel their electricity provider is screwing with them, why not make their own? Probably even with batteries it would pay for itself given the ROI I'd guess panels have there
Edit: Basic power loss formula is P=I^2R, so yes power loss is divided by 4 for a 2x increase in voltage assuming the target power delivered is held constant.
At a given power, double voltage means half current. If the resistance is kept the same, that means 4 times lower losses. If the resistance is doubled by using a thinner cable, that still results in two times lower losses.
What material would they use for the cables at those vast distances to make the numbers work ?