I would have guessed there must be enough domestic customers or in Indonesia that would make more sense.
In turn, that means voltages can be higher, letting one use more of the cheaper PVC or XLPE insulating material and less expensive aluminium for the same amount of energy delivered a large number of kilometers.
To be honest, I don't think we're many decades away from the cable+conversion stations themselves cost being irrelevant, and the administration costs, land purchase costs, etc dominating.
Why do you believe these things are related?
HVDC lines operate in the hundreds-of-kilovolts range. For example, https://en.wikipedia.org/wiki/Basslink operates at 400kV. There are no MOSFETs or JFETs directly involved in stepping down that power.
If you can have the conductor 1mm^2 thinner (capable of carrying less current for the same heat production) and the insulation 1mm^2 thicker (capable of handling a higher voltage) and transfer the same power, then you'd save money.
It only works up to a certain limit obviously - the relationship is non-linear and there is an optimal point.
The actual tradeoff involves a lot more modelling, because you need to consider all kinds of other factors, not just the costs of the conductor and insulator.
The reactive component has significant impact on the generation equipment and grids. It also causes the Ferranti effect, where the voltage along the cable rises. This can make managing the voltage within the cable difficult because at no load, the load end has a higher voltage than the source, and when loaded, the middle of the cable has a higher voltage than both ends.
During stable operation these effects can be managed with Statcoms, shunt reactors and voltage regulation tap changers. However during transient operation you will be relying upon the static protective devices such as surge arrestors, depending on how large the transient is.
DC transmission does not suffer from the same reactive power component and has less losses, but it does require large convertor stations at both ends.
On top of that, you also have losses to the cables capacitance with AC.
But DC has the cost of the conversion stations to consider - both capital cost and efficiency causing operational cost.
I suppose you mean AC-DC conversion stations. Assuming only solar energy will be "pumped" over the wire, then the "only" conversion stations that are needed are at the consumer, right? I said it before, I don't know much about electricity, so please correct me if I'm wrong.
Amusingly (IMHO), The band's line-up remained the same for 20 years until 2014 when Malcolm retired due to early-onset dementia, from which he died three years later; additionally, Rudd was charged with threatening to kill and possession of methamphetamine and cannabis. Stevie, who replaced Malcolm, debuted on the album Rock or Bust (2014). On the accompanying tour, Slade filled in for Rudd. In 2016, Johnson was advised to stop touring due to worsening hearing loss. So a rocker's fate: forgot what planet they were on, went mad on drugs becoming threats to society, lost their hearing, or kept touring indefinitely with a changing lineup cashing in on past glories.
Similar period https://www.youtube.com/watch?v=XfR9iY5y94s https://en.wikipedia.org/wiki/Down_Under_(song)
Aluminium is far less dense, which in turn makes the whole cable bigger, which has other costs (eg. fewer kilometers of cable fit in a boat). Usually it's still the best choice overall though.
Australia is a big place. The northern tip of Australia, where this project is based, isn't really that much further from Singapore than from the Australian population centres in the South East of the continent.
Indonesia is much poorer than Singapore, and has awfully inefficient bureaucracy and regulatory environment.
they're doing unrealistic nuclear proposals, because they know it takes a long time to ramp up, and in the mean time, their buddies' investments in the coal industry gets time to exit and profit properly. It's designed to prevent losses in fossil fuel investments.
Not to mention that australian nuclear cannot be profitable imho - not when solar is so cheap. Their current proposals for nuclear basically requires taxpayer subsidies.
https://www.csiro.au/en/news/all/news/2024/may/csiro-release...
Meanwhile nuclear is feasible in China, South Korea, maybe in the UK (who are well into sunk cost on their next reactor already), and probably in the US.
And in that time span as well, solar power will increase its efficiency.
And then batteries, to store and deliver that power outside of generation hours, are a parallel to that.
If a nuclear power plant could be built quickly and simply, the equation would be different.
Unfortunately, from the limited amount that I've read, nuclear power plant projects often run over time and over budget, exacerbating the time scale issue I described above.
Solar power is just amateures littering compared to that.
https://blog.rootsofprogress.org/devanney-on-the-nuclear-flo...
"Nuclear followed the learning curve up until about 1970, when it inverted and costs started rising"
Nuclear is so safe--even fully factoring in the accident at Chernobyl--that people very occasionally falling off rooftops when installing solar panels is a bigger health hazard per Joule produced.
https://news.ycombinator.com/item?id=41220499
If Australia refined _all_ of the 40,000kt of Bauxite we export each year into "frozen electricity" Aluminium, that'd only require about 600GWh, or about 4% of the 1.7GW 24x7, or 15,000GWh per year this would send to Singapore.
Large datacenter are in the 100MW sort of range, so only single digit GWh per year.
Australia generates a few hundred TWh per year. 272 TWh in 2021/22 - or 272,000GWh, around 20 times what this project will export to Singapore.
Data centers and Aluminium and Iron smelters are big electricity consumers. But they barely even move the needle compared to cities with millions of households.
[1] https://en.wikipedia.org/wiki/Aluminium_oxide#Production
[2] https://www.mining.com/web/aluminum-price-hits-13-year-high-...
It might or might not be a good idea. But you need to then compare those massive investments to the relatively modest investment of the power cable to bring the electricity to a part of that world that already has all the other infrastructure needed, and also already has lots of water.
Not a big deal, if your grid can handle the loss, but this certainly can’t be the gameplan for the bulk of your power.
In Singapore's situation, they can probably invest assuming that they are not in a military conflict with anyone. If they get into a war with anyone who can cut that cable they will be returning to the stone age anyway. If Indonesia objects to them they will go, if someone with the power to coerce Indonesia objects to them they're in deep trouble.
Wikipedia gives an estimate of $1.47 trillion for Indonesia's GDP in 2024. The estimate for Singapore is $525.228 billion. The factor seems to be less than 3x. Where do you get 5x from? Are you going by PPP or so?
> In Singapore's situation, they can probably invest assuming that they are not in a military conflict with anyone. If they get into a war with anyone who can cut that cable they will be returning to the stone age anyway. If Indonesia objects to them they will go, if someone with the power to coerce Indonesia objects to them they're in deep trouble.
You can't make those assumptions, if you don't want to be bullied. Singapore doesn't have that cable right now and we ain't in the stone age. That situation ain't no different from having a cable, but it being cut.
> You can't make those assumptions, if you don't want to be bullied. Singapore doesn't have that cable right now and we ain't in the stone age.
You aren't at war either as far as I know, and hopefully it stays that way. But if Singapore happens to be at war with someone who thinks cutting that cable is a good option then the stone age beckons. And not because of the cable.
Presumably those in Singapore have a lot more buying power though. And the politics are more favourable for big capital investment projects.
The solar farm powering this Suncable project is 12,000 hectares, or 120 sq km. So the solar farm is 1/6th the size of Singapore. Although Singapore is only planning to buy around 1/3rd of the capacity, so maybe this'd be equivalent to only 40 sq km, or 1/20th the size of Singapore.
I suspect there are more profitable uses to the Singapore economy for land reclamation than dropping solar panels on it?
Shopping calculations for them need not be about economic cost benefit analysis.
But there's also no good reason not to apply cost/benefit analysis.
> Singapore with a native population of about 4 million has reserves of about $1 trillion. They can afford to splurge to claim green/net-zero status.
Of all numbers to bring up here, why did you pick foreign exchange reserves? GDP or wealth might be more relevant?
Reserves are cash in hand and represent immediate and hard spending power.
So? These _benefits_ also fit into a bog standard cost/benefit analysis. For example, Singapore would need to weight this project against buying everyone a luxury handbag..
Btw, in any case keep in mind that the project is privately financed and will make money selling electricity to Singaporeans. The electrons that power my gadgets at home don't have any colour, so I can't even tell if my electricity comes from a particularly prestigious source. It's all intermediated by the wholesale market.
> Reserves are cash in hand and represent immediate and hard spending power.
That's about on the same level as arguing that having a money printing press represents raw spending power.
Most central banks around the world conduct monetary policy via domestic interest rates and affect these interest rates by buying and selling domestic government bonds. Thus they will have lots of government bonds on their balance sheet. But it doesn't mean that they can just take these bonds and use them to buy solar farms.
The Monetary Authority of Singapore is (almost?) unique in foregoing interest rate as a channel of monetary policy, and instead working via the foreign exchange rate. They affect the foreign exchange rate by buying foreign currencies via freshly minted Singapore dollars (or selling them to remove Singapore dollars from the market).
And just like the American Fed keeps the government bonds they buy on their balance sheet (and pretty much has to!), our Monetary Authority of Singapore keeps the foreign currency on the balance sheet, and they show up as reserves.
By design, Singapore has at least as much in foreign exchange reserves as we issued domestic currency.
In a sense, most of the eg Euros in our reserves are already 'spent', but they are spent in the form of SGD in circulation. (I say 'most', because we have more reserves than we issued SGD. Singapore is cautious like that.)
Land is in tight demand with food a priority over panels and issues that may not be apparent (clear slopes leads to instability, and keeping them clear is a Sisyphean task, etc).
https://www.reuters.com/business/energy/billionaire-cannon-b...
https://www.abc.net.au/news/2023-01-11/sun-cable-enters-admi...
I guess MCB found a way to make it work pending future investment that may not occur until 2027: https://www.abc.net.au/news/2024-08-21/suncable-receives-env...
> The approval paves the way for the next phase of development to deliver industrial-scale electricity to customers. But it still has some way to go, with a final investment decision not expected until 2027.
and
> However, SunCable still needs to negotiate Indigenous land use agreements with a number of different traditional owner groups along the transmission line route to Darwin.