by AtlasBarfed · 2y ago · 0 comments
If it was up and running it would be 4-8x or so more expensive than solar/wind. I guess if there was proper carbon taxation it would be price competitive with gas turbine, but ... there isn't.
On top of that you need to install new control systems and probably do huge amounts of integrity checks. Probably an entire new round of NIMBY approvals and delays and lawsuits.
It feeds an all-too-common techno-religious obsession rather than big-picture economic and risk management for specific projects in specific locations. One of the biggest hurdles and costliest aspects of proposing nuclear projects in the US is getting insurance first for construction and then operation, and the few insurers who can cover them aren't going to underwrite risky projects. It's so much simpler and cheaper to put up solar and wind nowadays that it doesn't make any sense compared to the past when renewables were very expensive. Renewables are the path of least resistance. Centralized and distributed grid storage in various forms then becomes a bonus feature that allows for more resiliency under load and unplanned outages.
The US seems to be in a similar situations. Some states has weather that is suitable for battery and solar, but then the other states invest in more natural gas.
Is that accounting for the renewable's inherent need for very expensive energy storage? Because otherwise you need to build that gas turbine to cover for when sun isn't shining.
Peaker and firming are both traditionally gas.
If you think that renewables have an inherent need for expensive storage then you're holding them to a higher standard than nuclear. This is both inaccurate and ahistorical given all the pumped hydro built specifically to complement nuclear.
Though the continued reduction in price of renewables and batteries means they probably already meet and exceed your higher standard anyway (see the recent Fraunhofer report that solar and batteries were cheaper than gas in Germany).
It's a different kind of storage. Nuclear generates the same amount of electricity all the time but then there is higher demand during certain parts of the day. You then make up the difference between the baseload and the peak with a different kind of power plant. Typically nuclear is not used with storage at all, it's instead used for baseload with the peaks handled by other types of primary generation, traditionally natural gas or non-pumped hydro that dams a river.
Renewables have entirely variable output, so you need alternative generation with enough capacity to supply the whole grid at any given time, and enough storage to be able to do this for a week or more in the event that renewable generation is low for an extended period of time.
It's the difference between building a grid which is half nuclear and half something else vs. fully duplicating the whole capacity of the grid.
Typically nuclear/renewables is not used with storage at all, it's instead used for baseload/cheap-n-clean-load with the peaks/firming handled by other types of primary generation, traditionally natural gas or non-pumped hydro that dams a river.
Nuclear can trip out in seconds or be put offline by fault investigations or fuel reloading, so you need alternative generation with enough capacity to supply the whole grid at any given time, and enough storage and or firming to be able to do this for a week or more in the event that nuclear generation is low for an extended period of time (like France the other year).
Assume that 3 reactors at a time are in revision during the spring and autumn. This means the "base demand" is 16 GW.
I don't see a material difference in handling 32 GW or 48 GW of dispatchable power generation, assuming the lowest possible renewable generation is zero for the renewable side (which is not the case.)
The other option would be having more nuclear plants and turning them off for large parts of the year. That is incredibly expensive.
All this entails forcing the customers to pay for more expensive nuclear energy rather than utilize cheaper energy when it is available.
In reality the more expensive nuclear power plants are turned off.
https://markets.businessinsider.com/news/commodities/energy-...
What? Isn't the majority of cost associated with nuclear power capital cost? Have you computed the estimated cost based on the cost of getting plant up and running again? I couldn't find those numbers in the article (the one linked in the comments)