by pb1729 · 2y ago · 0 comments
https://www.bhauth.com/blog/flawed%20ideas/microwave%20drill...
Per [1], “[wells] with a regular production casing diameter of 200-250 mm have an average capacity of 5.5 MWe”. Quaise has deep bores that could potentially have higher temperatures, but let's stick with 5 MWe.
At the article's 12 MWh/m³ for drilling, and 250mm bores of depth 10km, WolframAlpha tells me that is 6 GWh.
Divide through, you get 1000 hours or about a month. This doesn't match their “significantly over 10 years” they gave before mentioning waveguide losses.
The main difference I suppose is the thermal conductivity comment, where I didn't follow why Quaise wouldn't be able to use enhanced geothermal approaches. More specifically I think that if a Quaise well has ~1% the energy output of a normal geothermal well, it's pretty weird to frame the problem as about the energy cost of drilling, and not the whole factor-100 reduction in energy output.
To be clear, this seemed like an interesting article and I'm not claiming my napkin math is definitive, I really am neither an expert nor someone who has spent a lot of time investigating this. I do think some more clarity on how the math looks would help their case.
[1] https://www.thinkgeoenergy.com/report-success-of-high-temper...
Enhanced geothermal involves fracking. Typical proposals involve creating crack paths between 2 nearby wells by fracking from both. It's been tested some but so far has not been economical.
Apart from the cost issues of enhanced geothermal so far, Quaise plans to drill deeper to higher temperatures to reduce power block costs. Sufficiently hot rock flows a little bit which makes fracking ineffective. Fracking also doesn't work as well with supercritical water. (If not drilling to rock hot enough to flow a little bit under high pressures, it would be much better to use conventional drilling techniques.)
I'm afraid I'm not really following the argument though. I don't have the technical background to judge how economical EGS is or not, I just want to understand this energy-based argument. I checked to be sure, and Quaise's initial plans (per cofounder Matt Houde) are indeed EGS-based[1], just deeper. It seems correct to me that if they succeeded at building wells that way, they would produce at least comparable energy to standard wells.
It's entirely possible that EGS just doesn't work at really deep depths as you state here, but this seems like a qualitatively different argument to the one presented in the article.
[1] https://youtu.be/yz6rRw59Huw?t=675 "but what we're interested in in Quaise is this novel idea here all the way on the right which we call like to call superhot rock EGS systems"
Actually, they address the energy balance question at the end of that talk.
https://youtu.be/yz6rRw59Huw?t=3016 "[...] we could be using around five megawatts for the drilling process to drill our wells, and let's say we use that five megawatts over a year to drill three holes, so we get an injector and two producers. We predict that configuration of the two producers and an injector at superhot conditions can produce something around 50 to 100 megawatts of electrical energy, again owing to the benefits of producing this superhot, supercritical steam."
They also answer a question on borehole stability, admittedly claiming largely that they don't know.
A different argument to the one presented in the article, you say. Huh.
I suppose I can't claim to know more about geothermal than the author of that blog post, but if you check again, you'll find it does mention EGS. Apparently something made the author decide the problems with Quaise using that are non-obvious enough to need explanation.
It's really hard to vapourize all that rock and suck it out to the surface with a vacuum. But it's really hard in the sense that the vaporised rock might recondense and stick to the sides of the hole, not in the sense that vaporising the rock costs more energy than you get out of the hole in its 30-year lifetime.