by AnarchismIsCool · 2y ago · 0 comments
If you are a manager and this makes you angry, you're one of the bad ones.
It refuses to learn from The Mythical Man-Month and recognize that building software has an essential complexity that cannot be avoided. You need smart people to implement and manage it, and you'll have to pay them what the market says they are worth.
Building software that's more complicated than a standalone CRUD system is hard, it will always be hard, and unpredictable, and to some degree stressful. No methodology will ever make it anything else because the methodology used doesn't change the nature of the problem.
There’s been plenty of discussions why the “what could have been” got buried in certain people jumping in, creating weird layers and interpretations of some process for their own profit and ego.
Chinese whispers then lost in translation.
But this is extremely fragile, because it takes a lot of energy to fight external people (often product people) who want to remove the self-management aspect.
Unless this is in the DNA of the company, you can't have agile or real Scrum, because it threatens those kinds of power-grabs. For this to work, you literally need someone threatening to fire people who attempt to micromanage others.
We did 2 week sprints, but that really was more to keep a remote team regularly in touch and updated. Sprint work was very much up to each dev, and at the end of the sprint anything that changed or slipped was just chalked up to lessons for future work.
That did change eventually, both as the team grew a bit more and funding started to run low. Eventually we had the worst of both worlds mentioned in the article, sprints with more rigid goals leading to a quarterly goal driven more by marketing goals than anything else. Throw in the fact that the still rather small company ended up with one person making product, marketing, and even technical decisions and we devolved into glorified code monkeys pretty quickly.
https://agilemanifesto.org/principles.html
It's common in corporate implementations of Agile (tm) but it isn't actually some commandment or prescribed feature of Agile itself. It's actually prescribed by Scrum:
> The Daily Scrum is a 15-minute event for the Developers of the Scrum Team
The business doesn't actually need a daily update. They think they do because they dont want to give you the ability to deliver anything.
Business demands process for people in functions to follow. Scrum outlines meetings for programmers to attend, and specific process outputs like user stories to produce and close. Scrum is agile in business because business cannot do agile.
The business needs to know when something will be done as they need to make promises to customers. The business also needs to know when things will be done as that is a proxy for cost - they need to make sure they are not spending more creating a thing than it will deliver (this is a hard problem as some sales will not happen until it is done and there is typically a competitor customers could go with). That is nearly impossible to say how long engineering will take doesn't mean we don't need to know how long it will take!
On daily standups, from he manifesto:
> Business people and developers must work together daily throughout the project.
> The most efficient and effective method of conveying information to and within a development team is face-to-face conversation.
The "standup" theatrical part isn't in it, but that begs for daily meetings in the same physical place really.
Also...no. Verbal communication isn't effective or efficient. It's fast and natural, and perhaps comfortable to many.
In our current corporate environment, effectiveness (providing the right info in the right form) and efficiency (minimizing back and forth) will probably be better achieved with documents and open chat with all the parties involved, even if (in particular if?) it means slower throughput and more deliberate communication.
This is all there is to Scrum, if it's not here it's not part of it: https://scrumguides.org/scrum-guide.html
It's like calling the electoral college part of democracy. Than just a choice one place made, it's not intrinsic.
I find it very useful for allowing everyone on the team to have a general idea what everyone else is working on. You can call out to ask for help at any time [1]. But having a 15 minute meeting each day to make sure everyone has a view of all the pieces in movement is handy.
[1] Though the standup does give a place for people that aren't comfortable calling out when they're having issues.. to do so because it's expected there.
What would you prefer besides agile?
I had a conversation with a young devTM who was arguing that estimating is hard and always inaccurate so we shouldn’t estimate. Everyone should just work on things until they are done. He argued this earnestly and didn’t recognize that there are opportunity costs and conflicting priorities and the need to choose what to do. He earnestly argued that every single user story should be worked on in order of entry until it was completed. It would have been precious how clueless this suggestion was if he didn’t spent 20-40 minutes a week arguing this as an explanation for why his items weren’t done and why he was civil disobediencing to refuse to estimate or report time on tasks.
Plenty of learned people have made defenses for having no estimates. If you want to make the opposite claim, you don't need to use a junior dev as a strawman.
Like, the constant micromanagement and process lawyers pushing you down makes me misarable.
At least with classic project processes you'd have some oversight plan to follow.
2) no matter what "agile" was supposed to mean - managers anyway interpret it as devs having to be very agile for them all the time ...
Sure, that's the goal. In reality, though, that's very nearly never what it does in practice. That's why I have come to view "agile" shops with an extremely skeptical eye.
A lot of the ceremonies in general are mostly helpful to the EM/PM. How many things that you're doing are actually improving how you get work done? Especially when you consider how much time is spent on these ceremonies (sprint planning 1 hr, sprint retro 1 hour, daily standup 15-30 minutes. Plus whatever prep is needed and the interruption time.) For many companies this is a 20% or more overhead that's mainly busywork because you still need the additional meetings to understand what you're working on.
At the time it was incredibly freeing and fixed a pretty awful and behind waterfall project. I was (briefly) at a startup a couple years ago that said they "did Scrum" and what a clusterfuck that was - all the managers meeting daily with devs to see if they were behind and scold them if they were. See ya.
The scrum guide fairly explicitly states that managers should not attend or be part of stand-ups unless they're actively involved in the work as part of the development team.
Daily: should average at 10 min, 15 min is really the maximum. Including prep. So 5-15 min. No status updates! The daily is about getting people unstuck with their current tasks and quickly aligning on what to do next. If it is not useful for the team, the implementation is wrong. Doesn't mean it always has to be useful and interesting to you, there's a difference. Management stays out of the daily.
Sprint planning: the sprints are the compromise to management so we can have some sense of progress, so this is of course the one meeting that is useless to the team getting work done and can hamper productivity. Just make it quick.
Retro: you should do a retro about if you think the retro is useful and why/why not. If the team doesn't think it is, either change it until it works or make this the very last one. Management stays out of the retro. ("But are you then not doing scrum anymore?" "So what, save the pedantry for writing out the functional and technical requirements please")
Thing is, you do need to understand what you are working on, and it needs to be more or less the same as what your team members think they are working on. If you are 100% efficient at building the wrong thing, your 0% overhead amounts to exactly nothing, and the 80% efficient scrum team is infinitely more efficient. Though these extreme cases are usually a problem from higher up, without any way to align your work you will usually not be efficient. And if you are, then good for you, don't follow scrum like its some cult. But most teams need a little coordination.
Basically if anybody feels a meeting (or anything, really) is a waste of time, there is a problem that needs addressing. And the problem is not the feeling, but what is causing that sense of waste. Take it seriously, it is almost always signaling a flaw in the process. Learn how to talk about this in the retro and get to the bottom of it.
The retro is about debugging anything that isn't working optimal in the team. If you cannot find any bugs and fix them, then you are either perfect or just not good at debugging, and I know which one to bet one to be the most likely. One sure sign a team isn't very capable is when there is a lot of blaming involved. Usually external factors or tools get the blame, but in very dysfunctional teams people blame each other.
If you work in a team that doesn't adequately address these problems and you have no power to change it, then it may be time to look for another job.
- burn-down / velocity charts
- retrospectives
- poker sessions
- daily stand-ups
- user stories and related tickets (eg in JIRA)
There’s probably more ...
Perhaps these things are not necessarily meant to make managers happy, though managers do seem to like this stuff.
As a dev, I prefer a more fluid approach without all the rituals. In the start-up I joined a couple of months ago, we don’t deal with any of the above shit. Which of course is sure to change as the company grows, as that seems to happen often.
Our current way of working (remote company, 4 people):
- 2 calls a week, which tend to last about an hour.
- We discuss work for upcoming week or future stuff.
- We try to deliver every week on whatever was agreed upon at start of week.
Actually, previous company I worked at, was a bit bigger (35 people), but also very little rituals, at least for devs. There was a support department that did the JIRA related stuff. And we had like 2 day-long meetings every year to discuss personal goals/work for next half year. But afterwards just a short weekly meeting for team (sometimes lasting only 10 minutes), no stand-ups and such.
When I started at my current job, I naively looked at the bugs and tasks assigned to me, and started picking and fixing the highest priority tickets.
Then I was informed, "Oh no, that's not how we do things here. Don't look at the priority, just work on what is assigned to you in the current sprint."
I had never heard of sprints before.
More recently, I had a conversation with my manager and asked, "Do we really need sprints? I've been in this business a long time. 10, 20, 30 years ago we didn't have sprints and somehow still managed to produce great software."
The reply was "But if we didn't have sprints, how could we possibly measure the team's productivity and individual productivity?"
I knew I wouldn't win this debate, so I politely let it drop. I just wanted to sow some seeds of doubt.
In all fairness, my manager is a very reasonable person. But when this devotion to sprints is ingrained in the entire company, it is hard to question it or get away from it.
At least we don't do daily standups!
The only thing on that list I've ever liked is the velocity charts. And the only reason I liked them is that it helped me give a slightly less made up date to my own bosses to explain when something might ship.
Over the years I've found that devs have been the one who like retros. Or at least a certain subset of them. When I've been an EM I would try to get rid of them, only to have them requested by my teams. Who knew.
You need some coarse odometer to know where the finish line is. Burn-up charts are a reasonable input to that and can be very low effort. Just knowing where you hit the inflection point between new-issues added to a milestone vs. issues resolved is useful. If you can replace a burn up chart with tangible test results matrix or similar - even better.
> retrospectives
I have never found per-sprint retros useful, either. I guide teams to do a retro when the issues raised in the previous retro are resolved. WIP control FTW.
> poker sessions
In my experience, planning sessions are one of the most impactful parts of the stereotypical scrum process for three reasons: (a) Planning creates a consensus within the team about what the story actually means; (b) Planning often leads to someone proposing a good 80/20 trade-off or raising an important point that avoids future re-work or unexpected tech debt. (c) Breaking big tasks into actionable, independently useful, small tasks is one of the hardest things for junior developers to learn. A lot of mentorship and teaching happens in good planning meetings. I encourage teams to try planning for the benefits of the process and not worry at all about fine grained points - "trivial", "medium", "unknown" is typically enough. Lots of mature teams will plan ad-hoc as they are ready for new work. This is my personal preference. But teaching teams how to plan effectively in a weekly planning meeting is often a good starting point.
> daily stand-ups
Standups that are control points for managers and expensive status gathering shortcuts are horrible. standups that are self-organizing, especially for teams that have ops + dev responsibilities, can be really useful. Nothing wrong with making a plan for the day - it should just take 10m.
> user stories and related tickets (eg in JIRA)
You should write down what you want to do somewhere and a few checklists go a long ways towards improving quality management.
I have never found scrum to be a good process (like the article, I find it very grinding) and I strongly agree with the posted article. But a good dev process likely includes all of these elements in some shape.
- burn-down / velocity charts: Teams use this at standups to make sure their sprint isn't drifting. That's why a burn-down should be tracked in hours and not points. With points, the data isn't actionable in a reasonable amount of time. The the team sees a problem, they might make use of a pre-determined emergency procedure to address it.
- retrospectives: Yeah most retrospectives are horrible. Retros should be like post rocket test - examine your telemetry deltas to see what changed (edge cases, governance,compliance, desgn, etc.) These conversations are not forced, but good teams always repeat the same data analysis unless they intentionally change it.
- poker sessions: Yeah this is totally misunderstood. Pointing stories is about snap reactions to comparing difficulties and complexity, and that's it, move on. Teams will tighten up estimates when they do an implementation plan in sprint planning. So they don't sweat estimates.
- daily stand-ups: The whole team is responsible for the sprint backlog, nothing is assigned, everything is volunteered. So if you're working on something that is going south, or you have some extra capacity, let your team know about it. The team will work together to scale capacity to get things done, which is how they can disappear on Friday afternoons.
- user stories and related tickets (eg in JIRA): Well yeah, Jira sucks. So do all the other major backlog tools. Jira gets addins, but the fundamental approach to backlog development hasn't changed in a decade. (I'm working on a soln from scratch, btw).
Also, user stories are meant to be work-items with enough signal so they can be executed with certainty in a sprint. So that means a lot of refinement to the left of the story must occur to get rid of the noise (epics to features to stories to tasks). Once a team says a story meets their definition of ready, that story can be scheduled for a (timely) sprint. Team members may be doing hard-core story refinement because of some technical hurdles, so their time outside of development during sprint can be pinned down with the team's capacity plan. BTW, capacity plans and implementation plans belong solely to the team. They're nobody else's business, including managers to CEOs.
Sprints end with some kind of demo, retrospective, and sprint planning designed almost entirely to keep PMs and managers in the loop and happy. Reports are generated, spreadsheets with a few quarters worth of tasks are updated, and PMs or managers get to run that further up the chain, presumably to make it clear that great progress is being made under their supervision and well run scrum methodology.
There's a direct relationship between the Client and the Scrum Team. Where most companies screw up is in their business model. You can't charge a flat fee for fixed project description and call it Scrum. Scrum is iterative, by design. It's supposed to evolve with the CLient's needs and desires. They want to be able to change the scope, the price, and the timeline on a whim. If you aren't billing per-Sprint, then you're going to have a constant "charge the Client for a change request" mentality, which makes them feel like they're being Nickel and Dime. It's much better to say "We welcome your changes at any time for any reason. It may not fit in the next Sprint, but we can always put them in the one after that."
In Sprint-based projects the Client has to be free to terminate the agreement at any time, if they feel they're not getting enough value in exchange for their money. This is why constantly delivering value to the Client is key.
When they charge a flat fee, they feel they need a PM to make sure they don't lose money. And how can you know if you're losing money? You force people to track their hours back. It all gets toxic.
When the Client pays per Sprint, as long as each Sprint is profitable and delivering value, it can be a huge profit center that has no end date. Often times, Clients will just keep adding features forever instead of stopping at the flat fee end date.
That said, the 12 Principles of the Agile Manifesto offers another solution: Get rid of management entirely. It states that developers are best to work with the rest of the business collaboratively. Which is the irony of Scrum claiming to be Agile: Only management wants to use it, defying Agile to its fundamental core.
They all exist to give software development the illusion of predictability, but saying that a project should take “x sprints” is just setting a deadline with extra steps.
The way you get good at estimating is looking at your database of experience. “I did a task similar to this in 8 days”. Calendar time is real and punchclock time is real, either can be measured. Story points are not real and not measurable and they leave you lost at sea thinking that estimation is impossible, a scam, etc.
See also
https://en.wikipedia.org/wiki/Function_point
Which is also a kind of development “funny money” but which have a somewhat rigorous method to arrive at estimates.
Here's the feature list; here is where on the list we'll definitely get to, here's where on the list we definitely won't get to, and everything else is some shade of inbetween. Now, would you like to adjust the priorities of any of those features, or would you like to change the deadline?
Presumably you would still use iterations to track progress, Epics/Features to break down requirements, some kind of estimation to track if you're ahead/behind schedule?
I certainly wouldn't go back to Waterfall days, but I suspect many current devs never experienced that.
- Issue tracking as a common place to describe what needs to be done and thoughts / details on how it is solved. Something lightweight like Trello is ideal
- A Kanban board so people have an organised way to pick up new issues when low on work
- A weekly showoff meeting where there are few 5 minute presentations and a 30 minute "I did something really cool or learned something really cool"
- 6 month task split into 1 month ish deliverables, with a flexible deadline for each. Presentation of finished work each deliverable.
Two scheduled meetings per week = tons of dev time and freedom to explore / innovate! (Ok, three weekly meetings if you count the product-wide meeting, which is usually a waste of N-5 people's time, and I usually have it on the background while I continue working.)
We are remote, so ideally there's also one in person gathering per year to do the big vision casting and major high level brainstorming.
We still have room to improve, especially in the area of ad-hoc dev-dev communication. Always interested to hear how others do it!
If you don’t trust your team to be productive for 2 weeks without communication something is deeply wrong. Individuals should be in constant communication, but few things need to be said to everyone. Scrum style management may be useful for highly dysfunctional teams, but it frequently adds a great deal of unnecessary overhead.
That’s no easy feat and often oversimplifies the challenge of building competent teams. I think it’s achievable if you have a large budget to hire only senior/experienced devs and a mature hiring process/team. Plus, if your company has strong tech branding, it becomes easier to attract top talent too.
But if you’re at a startup with limited funding and possibly no branding at all, you’ll likely face this situation:
- Hire inexperienced but honest, motivated people with the potential to grow, and invest in mentoring them.
If you have to introduce some "process" - whatever that "process" is - because you do not have competent people and you feel like "process" will fix it, your chance of succeeding are a lot smaller IMO...
Somewhere in all this process stuff, I see maybe what some teams were doing but I doubt it was as rigid and I doubt they indulged in it when it made no sense. Once these teams or people are asked what they're doing right - it eventually gets defined into rules and then evangelized to people made to feel they can't deviate or improvise when the framework makes no sense. "Trust the process."
So people start wasting their time going through the process rather than using the process as a framework/tool for getting things done, they 'do' the process.
Their job is standup, their job is scrum, tickets, and points, and as a result their job is only marginally to do the things that need doing.
Company's might take more issue with this inefficiency if the workforce didn't double as something to manipulate pre and post head/tailwind to make the stock rise.
Those don't really seem like things you'd want to outsource, no matter how good the outsourcee is.
Product people are not management at least not where I worked.
I see how it might be a problem if your manager is talking to the customers.
Product people are or should be equal to dev, engineering. They should indicate priorities but should not in any way evaluate engineers especially if they have no technical expertise.
Leave good devs to play telephone through a middle-man, what we call the manager, and they almost certainly will work on the wrong things, but will have a lot more time to do it.
I wonder which is actually more productive? Agile (of the Manifesto kind) posits that the former is most productive, but Agile (of the fake kind) seems to always want to revolve around the latter. The general sentiment is that fake Agile is the one that gets it wrong, so presumably cutting out the manager is what is most productive, but more data is welcome.
The devs have the opposite problem, they can imagine all sorts of new technology that would be fun to use (for them) in helping the customer solve their problems with doing foo, and even if they understand foo from the customer's business perspective they they may not have a great understanding of how big a problem it is in the grand scheme of things and what commitment of resources and expenses are justifed in solving it.
Managers talking to managers can (in theory) draw some boxes around scope and priorities and get the right development problems solved at the right time. They may talk and realize that doing foo isn't even really a great idea and they should be doing bar intstead. Line-level employees working directly with developers will not be as likely to realize that.
Developers can fall into the trap of thinking that because they are smart (mostly) at building software they are automatically smart about all the business processes and problems and goals of the company. They should certainly be informed about those things, but they are not experts in everything.
Of course, if you are an early stage startup and one of your customer is half your revenue, sure. Do whatever it takes to make them happy.
Obviously not literally. What they want hasn't been invented yet, which means the words to accurately describe what they want also haven't been invented yet. But ultimately you do want to act on what they really, truly are trying to tell you. Indeed, figuring them out is a hard job all on its own.
> is a full time job.
Sure. That's the tradeoff. You can spend most of your time figuring them out, and then the small few remaining units of time you have for development will be on point. Or you can play telephone and have all kinds of time for development, but will more often than not go down the wrong path.
It's not really clear which is more productive at the end of the day. But we do know that Agile (of the Manifesto kind) pushes the former, while Agile (of the fake kind) pushes the latter. People seem to hate fake Agile more than they hate Manifesto Agile, so that does suggest that not playing telephone is more productive.
But, still, data?
But reading the article made something click: it is not about the specific process, the (lack of) autonomy is what really matters. I guess I got lucky to work a lot in teams where we largely controlled our own process, so even if we used bits and pieces of scrum, kanban or other methodologies, it was always of our collective choosing and when it didn't work, we changed it.
I did like to have rules, principles and process. A simple playbook for a daily meeting that made us not forget important things and sped up the meeting. Making things in small increments meant that I didn't have to review thousands of lines of code. Having a visual overview of work neatly spelled out means I don't have to re-think every time I pick up a new item to work on. This also prevents useless work because one of your teammates decides to work on the same thing as you without telling it. All these things make me happier and more productive working together on some big thing.
The key is that the team should be in control of the process, not some manager who isn't part of the team and affected by the process. You need to have a stake in it. The only other factor that undermines this is 'process for the sake of process'. Every part of the process needs to earn the inevitable cost its implementation is bringing. Some people seem to be happy paying the pricing without getting the value.
Before: the team had internally decided to use Scrum. Other teams were not using it, and inter-team coordination used traditional project management methods. It was fantastic; the team worked like a well-oiled machine and I really did feel more productive. We never had crunch time. I did not feel the "end-of-sprint mini crunch" that this post describes; instead the norm was that, by the last couple days of the sprint, people were starting to finish up whatever tickets they had taken and pivoting to helping teammates get the rest of the work done. Oftentimes we'd close out all the user stories a day or so before the end of the sprint, and have all that time for tidying up the codebase, fixing small technical debt items, experimenting with new tools, or planning ahead for the next sprint. So, if anything, it was the opposite of what the article describes: the last few days of every sprint were downright relaxing.
After: The executives got wind of Scrum, and decided to standardize the whole company on it. We stopped work for a week so that we could have a famous Agile coach do an all-hands Scrum workshop. Which was fun, but the middle and senior managers were conspicuously absent. And then, after that, things kind of went to heck. The way our team did Scrum rapidly started to change as our team manager started getting explicit instructions on how to do things. We also started experiencing pressure to keep or maintain velocity. We started getting questions about why our velocity was so much different from other teams'. We could explain that the story point scale is team-specific and you can't compare story points across teams, but that didn't go anywhere. As I said, the middle and upper managers skipped the Scrum training. They weren't interested in being lectured about what I'm sure they perceived as pedantic little bullshit details.
I left that company and went to another where leadership didn't mandate any Agile methodology. My team did a homegrown Kanban-like thing. A team I collaborated closely with used Scrum. It also seemed to work pretty great. Again, possibly because we chose it for ourselves. I don't think the other team would have done as well on Kanban. Scrum wouldn't have worked so well for our team. I didn't see a problem with that. We each had different business domains that warranted very different "rules of engagement" with our stakeholders and ways of organizing the work.
Since then it's been a couple more companies where "Agile" was mandated from the top, and, apologies to Tolstoy, but they were both miserable in the same way that the first one was after the Scrum mandate got handed down from above.