by msla · 2y ago · 0 comments
COBOL is alive in that it keeps changing from era to era, to the point modern COBOL looks rather little like the 1950s COBOL everyone instinctively thinks about when they heard the term. It's as if we were still programming in Algol because Java had been called Algol-94 or something.
MULTIPLY A BY B GIVING C ON SIZE ERROR STOP RUN.
any more.> EBCDIC: /eb´s@·dik/, /eb´see`dik/, /eb´k@·dik/, n. [abbreviation, Extended Binary Coded Decimal Interchange Code] An alleged character set used on IBM dinosaurs. It exists in at least six mutually incompatible versions, all featuring such delights as non-contiguous letter sequences and the absence of several ASCII punctuation characters fairly important for modern computer languages (exactly which characters are absent varies according to which version of EBCDIC you're looking at).
Ruby is nice.
They feel great to type out when you're in the flow, but coming back and reading them grates on my nerves. Seeing the condition first means I load a logical branch into my mental context. Seeing the condition after means I have to rewrite the context of what I just read to become part of a logical branch, and now the flow of reading is broken.
And in any event it’s a very natural language pattern if you know what I mean.
You had me at MULTIPLY A BY B
Kemeny and Kurtz described Fortran as "old-fashioned" in 1968! <https://dtss.dartmouth.edu/sciencearticle/index.html>
I am managing an ERP system implemented / went live in 2016. It's working on modern P10 hardware, which was released in 2021. The ERP system is continually updated by the vendor and customized by the client.
Even for COBOL running on an actual mainframe, which I think most HNers would think of 1970s dinosaur, most of the actual machines in production would be pretty new. IBM z16 was launched in 2022.
So they are "legacy systems" in the sense they're not written on a javascript framework which was launched last week, running on lambda instances in AWS :). But they are not "OLD" systems, as such.
The new Telum II processor (and certainly this also implies another big ISA update and new hardware cycle) was announced at Hot Chips just a few weeks ago for example. See:
https://chipsandcheese.com/2024/09/08/telum-ii-at-hot-chips-...