by philipkglass · 2y ago · 0 comments
Kairos is in a pretty early stage. They started building a test reactor this summer, scheduled for completion by 2027:
https://www.energy.gov/ne/articles/kairos-power-starts-const...
EDIT: Statement from the official Google announcement linked by xnx below [2]:
Today, we’re building on these efforts by signing the world’s first corporate agreement to purchase nuclear energy from multiple small modular reactors (SMRs) to be developed by Kairos Power. The initial phase of work is intended to bring Kairos Power’s first SMR online quickly and safely by 2030, followed by additional reactor deployments through 2035. Overall, this deal will enable up to 500 MW of new 24/7 carbon-free power to U.S. electricity grids and help more communities benefit from clean and affordable nuclear power.
> "Several high-temperature thermal neutron–spectrum pebble bed reactors are being commercialized. China has started up two helium-cooled pebble bed high-temperature reactors. In the United States, the X-Energy helium-cooled and the Kairos Power salt-cooled pebble bed high-temperature reactors will produce spent nuclear fuel (SNF) with burnups exceeding 150 000 MWd per tonne. The reactor fuel in each case consists of small spherical graphite pebbles (4 to 6 cm in diameter) containing thousands of small TRISO (microspheric tri-structural isotropic) fuel particles embedded in the fuel of zone these pebbles."
(2024) "Safeguards and Security for High-Burnup TRISO Pebble Bed Spent Fuel and Reactors"
https://www.tandfonline.com/doi/full/10.1080/00295450.2023.2...
and
https://www.powermag.com/nuclear-milestone-chinas-htr-pm-dem...
Or alternatively, radioactive dust could be released into the atmosphere such as THTR-300 did.
INL did a gap analysis in 2011 between what was known and what needed research. The german AVR reactor had technical issues that weren't expected -- dust being one of them.
https://inldigitallibrary.inl.gov/sites/sti/sti/5026004.pdf
From what I can tell the dust issue is still a point of contention.
Otherwise similar to the NuScale deal which fell through last autumn.
A PPA like agreement which then only kept rising until all potential utilities had quit the deal.
All honor to Kairos if they can deliver, but history is against them. Let’s hope they succeed.
> NuScale has a more credible contract with the Carbon Free Power Project (“CFPP”) for the Utah Associated Municipal Power Systems (“UAMPS”). CFPP participants have been supportive of the project despite contracted energy prices that never seem to stop rising, from $55/MWh in 2016, to $89/MWh at the start of this year. What many have missed is that NuScale has been given till around January 2024 to raise project commitments to 80% or 370 MWe, from the existing 26% or 120 MWe, or risk termination. Crucially, when the participants agreed to this timeline, they were assured refunds for project costs if it were terminated, which creates an incentive for them to drop out. We are three months to the deadline and subscriptions have not moved an inch.
https://iceberg-research.com/2023/10/19/nuscale-power-smr-a-...
History is not really against them. Our current reactors (mainly pressurized water reactors) are the way they are because Admiral Rickover determined that PWRs are the best option for submarines. He was not wrong, but civilian power reactors are not the same as the reactors powering submarines.
PWRs are expensive mainly because of the huge pressure inside the reactor core, about 150 times higher than the atmospheric pressure. For comparison, a pressure cooker has an internal pressure about 5 times higher than the atmospheric pressure, and such a cooker can explode with a pretty loud bang.
The Kairos Hermes reactor design is based on a design that was tested in the '60s, the Molten-Salt Reactor Experiment [1]. While such a reactor can be used to burn thorium, Kairos decided to go with the far more conventional approach of burning U-235. The reactor operates at approximately regular atmospheric pressure. This should reduce considerably the construction costs.
Of course, there are unknowns. While the world has built thousands of pressurized water reactors, it has built maybe 10 molten salt reactors. For example one quite unexpected effect in the MSRE was the enbrittlement of the reactor vessel caused by tellurium, which shows up as a fission product when U-235 burns.
The Nuclear Regulatory Commission is a very conservative organization, and they don't have much experience with molten salt reactors because nobody has. It took them 6 years to give NuScale an approval for a pressurized water reactor, design that they knew in and out. My guess is that they will not give Kairos an approval without at least 15 years of testing. But Google's agreement with Kairos is quite crucial to keep this testing going.
[1] https://en.wikipedia.org/wiki/Molten-Salt_Reactor_Experiment
MSRs are a costly distraction. They are not viable without literally hundreds of billions in research and development money. That's why all the MSRs startups are failing long before they even start the licensing process.
> For example one quite unexpected effect in the MSRE was the enbrittlement of the reactor vessel caused by tellurium, which shows up as a fission product when U-235 burns.
It was not unexpected. The _main_ issue with MSRs is that they have to contain fluoride salts that release elemental fluorine radicals as a result of radiolysis. So the reactor vessel walls will be eaten up by them, rather rapidly. Especially when reactors are scaled up to a level that makes them practical. And then you have all the fission byproducts that literally include almost all the Periodic Table.
The US produces 40000 billion kWh every decade, so that doesn't really seem that bad to me.
I'm glad they are, actually! Personally, I'm not really convinced by the "small modular reactor" concept. Ok, so building a big nuclear power plant is expensive. But is it really cheaper to build 10 smaller nuclear power plants (which all need to conform to the same safety regulations, need maintenance, personnel etc.) instead?
Actually proving this with a deployed design seems to be the challenge, though with strong headwinds against nuclear across the board, favoring proven designs over newer ones is at least a little faster. That's not a flaw of the design, but intrinsic to the social and political environment.
I also wonder how much of the cost is tied up in the upfront construction and engineering compared to operations.
This IAEA report [1] has more details about this design, and the dozens if not hundreds of other types of molten salt reactor designs. The relevant section for the Kairos Hermes design is 4.5 (pages 41-44).
[1] https://www-pub.iaea.org/MTCD/Publications/PDF/STI-DOC-010-4...
This isn't really accurate. The majority of pressure cookers you can buy operates at an absolute pressure of only about twice the atmospheric pressure.
Hopefully it is just a stepping stone.
To the degree that the prominent "renewables vs. nuclear" graph they keep repeating on the webpage and figure 6 in the report is straight up misleading.
This is the source:
What is different about different net-zero carbon electricity systems?
https://www.sciencedirect.com/science/article/pii/S266627872...
Utilizing storage costs from 2018 and then of course making the comparison against the model not incorporating any hydrogen derived zero carbon fuel to solve seasonal problems.
Which is todays suggestion for solving the final 1-2% requiring seasonal storage in the late 2030s.
Something akin to todays peaker plants financed on capacity because they run too little to be economical on their own, but zero carbon. Can be hydrogen or biofuel derived. We will know in 10 years time.
Would they have chosen the ReBF model the difference between made up optimal nuclear power and 2018 renewables would be: $80-94/MWh and $82-102/MWh.
It is essentially: Nukebros writes reports for nukebros, they confirm their own bias. Simply an attempt to justify another massive round of government subsidies on nuclear power.
(Submitted tile was "Google funding construction of seven U.S. nuclear reactors")
Sounds great in theory, but it took NuScale Power 6 years to get their design approved? I hope the AI hype lasts that long then maybe the world would have two certified 75 MWe SMR designs.
Also the NuScale Idaho plant was cancelled last year when cost estimates balooned 3x. 9.3bn for a 460 MWe plant?
edit: to be clear, 1GW of wind or solar is $1B. Build 3GW for overcapacity and you’re still at just 17% of the cost of 1GW of nuclear, and you technically have 3x more capacity. Now figure out how many megapacks you can buy for the $14B/GW you saved https://www.tesla.com/megapack/design (answer: 16GW/68GWh)
We have nothing close to the battery fabrication pipeline to make that timeline true, certainly not at scale. If this move works, Google will have cemented its power needs and economics for decades to come.
You need to pay attention because this is happening fast.
[1] https://www.bloomberg.com/news/newsletters/2024-04-12/china-... [2] https://www.iea.org/data-and-statistics/charts/lithium-ion-b...
Vogtle 4 was (IIRC) 30% cheaper than Vogtle 3.
The problem with nuclear in Georgia, and in the US, was that no one remembers/ed how to do it, and so all the lessons of yore had to be relearned, and the supply chain had to be stood up.
If you put in an order for several reactors, the very first one (especially of a new model, like Vogtle 3 was) will be expensive AF. The second will be expensive. All models after that will be at a more 'reasonable' cost.
Nuclear reactors are just like any other widget: the cost goes down with economies of scale. If you order 4 or 8 reactors at one sites they'll get progressively get cheaper (there is a floor of course). If you then put in an order at a second site, and move the workforce (or a portion) there, the lower costs will still be present.
If you start and stop construction, or order a whole bunch of different models/types, then there economies of scale goes out the window.
by the time they build it, the cost of renewables will halve, and their actual cost of nuclear will have doubled again.
No, it's not. Right now it's probably more than $10B a GW if you want the same level of reliability as nuclear.
And new AP1000s in the US would cost significantly less, because there are already experienced workers & supply chains from Vogtle and getting a license requires less work too, because you can copy much of Vogtle.
The median build time for nuclear reactors is 7 years. This is archivable if you continue building and not just build 1 or 2 every few decades.
Hence the batteries.
Is the majority of that cost dealing with regulatory and legal nonsense that stems from the anti-nuclear hippy groups and laws they got passed in the 60s and 70s?
One part this, two parts the economics of a novel technology platform being deployed in a large size, three parts American labor costs and inexperience with megaprojects.
Similar to why we can't build ships [1]: high input costs, notably materials and labour, and a coddled industry that is internationally uncompetitive. With ships, it's the Jones Act and shipyard protectionism; with civilian nukes, it's misguided greenies. (Would note that we're perfectly capable of nuclear production if it happens under the military.)
[1] https://open.substack.com/pub/constructionphysics/p/why-cant...
> State-owned Electricite de France SA has raised its estimate for the future construction costs of six new atomic reactors in France by 30% to €67.4 billion ($73 billion)
6 reactors, 1650MW each, $7B per 1GW vs Vogtle's $17B. Planned. In 2 decades, after it's finally built, it will have doubled of course lmao.
The cost of nuclear in Georgia today is essentially subsidized by decades and decades of past investments.
And as much as some people might like that you can’t simply move Georgia and place it next to your data centers.
It's no conspiracy why nuclear never gets traction these days -- maybe it was cost-effective 10-30 years ago but renewable technology has gotten relatively cheap. (Shutting down active nuclear reactors earlier than needed is a whole different issue though.)
Here's the report for 2023: https://www.eia.gov/outlooks/aeo/electricity_generation/pdf/...
There is no report for 2024 because they are building a new model to take into account even newer technologies: https://www.eia.gov/pressroom/releases/press537.php
-- Edit --
To clarify, "Nuclear is a terrible investment for private industry in 2024." However, I understand why nation states (and their equivalents) would want a diversity of power sources. There many be non-economic reasons why nations want to build nuclear over solar+battery+wind.
> There's something to be said for space.
I see this argument a lot. Yes, the density is very high for nuclear power plants, but you need to build them in the middle of nowhere, for political and safety reasons. So, are we really saving space compared to solar? Plus, there is much less political resistance to solar farms, and almost zero safety issues (for PV).This comment:
> unless they're willing to bulldoze their entire land to cover it in solar panels
Your sentiment is interesting. No one says that when we talk about building new farms. Really, that is what people have done for the past 2000 years to alter our landscape. Can you imagine what Brazil looked like in 1800 vs today? Dramatic landscape changes due to farming. Same for US, Canada, New Zealand and Australia. California has plenty of desert or very unproductive land that can be covered with solar panels.1) Google uses about 25 terawatt-hours per year. Source: https://www.statista.com/statistics/788540/energy-consumptio...
2) An AP100 nuclear reactor can produce up to 10 terawatt-hours per year. Source: https://canes.mit.edu/overnight-capital-cost-next-ap1000#:~:....
That is incredible to think just how much power that a single nuclear reactor can produce!
This top-down corporate order will make more change than Americans can individually.
:(
That's.. not very much.
So typical of Google. Dip their toes in a new field. Get lots of press. Move on to the next thing.