by modeless · 14y ago · 0 comments
Seems to me the controller might be the hard part -- more UX testing, less standard parts. But I'd love to hear from someone who's solved this kind of problem.
First, I've been unable in my (admittedly, cursory) research to discover any prebuilt systems that even come close to their promised hardware specs. So until someone proves me wrong by posting a link to an OTS solution even close to what they're promising, lets assume that the system needs custom design.
This is a whole massive can of worms. I have some experience with hardware design (though not as much as a full-blown EE), and I'd ballpark hardware design alone as a half-year effort with multiple full-time EEs. And that's a best-case optimistic estimate. People who work in software don't seem to understand how hard this stuff is. It's not like you can simply take another schematic, slap the new parts you want on, delete the old parts, autoroute it and call it a day. With parts of this complexity there's a whole host of other design issues that come out of the woodwork. High-frequency switching means if one of your autorouted traces is longer than another, you're going to have timing issues. Crosstalk between layers, capacitance and inductance of the wires themselves can wreak havoc on your busses. You need to intelligently design the ground planes, separate your signals (analog and digital components), etc etc etc.
These are only the issues I'm aware of. I'm sure people experienced with creating boards this complex can fill me in on more. It's not like a hobby arduino project - hooking up traces to debug problems can increase the capacitance of a line enough to cause a new set of problems.
This isn't really directed just towards you, but it feels like a ton of people here are missing how difficult hardware design with components this complex is.
http://www.alibaba.com/product-tp/127889823/Asus_TF300T_B1_B...
http://www.alibaba.com/product-tp/127047344/10_1_TEGRA3_1_32...
http://www.alibaba.com/product-free/127258720/MID_Laptops.ht...
Drop the camera, the touch screen, the battery and the enclosure, I bet you I could get a deal for these boards well under $50 for 10,000+ lots.
Also: right now, they'd have no problems getting a bridge loan for a few million dollars to start the manufacturing rolling.
http://www.amazon.com/Transformer-TF300-T-B1-BL-10-1-Inch-Ta...
Price point: $384. With an LCD. This isn't even close to comparable to the product they're trying to make. So to close the gap, you say:
> Drop the camera, the touch screen, the battery and the enclosure, I bet you I could get a deal for these boards well under $50 for 10,000+ lots.
Engineering tightly integrated consumer electronics products like these isn't a menu. You can't just "unplug" the monitor "remove" the battery and then repackage it. Redesign of a processor board of this complexity isn't a picnic; it takes significant EE expertise.
And with an initial price point almost 4x that Ouya promises? Please. This isn't "comparable" at all. You want a comparable piece of hardware? See http://trimslice.com/web/order-direct. Twice the price point with significantly less horsepower. That's what people are probably going to get in the end with this project.
This is a bunch of commodity hardware thrown into a box surrounded by very sketchy details surrounding development,software and the controller.
Sounds like they have hardware experience
Especially in the time frame cited; I've worked in both fields and unless they have experienced full-time engineers and developers working on this right now there's no way they're making the deadline. The "we have a prototype" is at best a vague indicator of progress. Do they have a board designed? Has it been fabricated? Do they even have android running on the hardware they plan on using?
If not, are they using off-the-shelf boards? I can't find any Tegra 2 OTS boards available remotely within the price point they list, much less Tegra 3.
And the "some of them would get fired if we tell you who they are" is more disconcerting than assuring. If they do have people with engineering/manufacturing/software development expertise these people do not believe in this project enough to leave their day job. That should speak for itself.
EDIT: for example, see http://trimslice.com/web/order-direct. Their Tegra 2 board with more modest hardware specifications is only available at more than twice the price point touted for Ouya. Note that this doesn't even include the cost of the custom bundled controller, which is itself a substantial hardware undertaking.
The console industry is littered with spectacular failures of this type, and I'm before I believe this one is worth investing actual money in I'm going to need more than Yves Behar, Julie Uhrman who's "been in the game industry for years" (exclusively on the software side), and several mysterious people who refuse to even be named.