by foldingstock · 14y ago · 0 comments
I pretty much stopped reading here. Elusive to objective metrics? I agree that you can't measure a program like you would a bridge, using physical laws such as physics and chemistry, but you very well can measure many aspects of it such as: efficiency, size, required resources, relative ease of use, etc. Just because it is not a physical thing doesn't mean we can't use a "scientific method" approach, we just need to be open to using metrics that exist in the digital realm.
That said, being able to measure something isn't sufficient; one also needs the control to modify the thing being measured in a way that has deterministic effects on the metrics. GP's metrics have that feedback loop with respect to software, which pushes it towards engineering. Process engineers have that feedback loop, even on business processes. Your manager does not; most of their actions do not create deterministic results.