by pyfon · 1y ago · 0 comments
It is a 3hr drive Sydney to Canberra and 4hr on train. Mainly because the train track was originally for freight so has more curves than needed for passenger.
They said rather than aim for a super fast train just improve the tracks we have and get the time down to 3hr to compete with the car.
This is a good point because then you get more revenues and usage (the trains are full right now but infrequent - maybe they can run them every 15 minutes)
Then you can go make the case for an even faster train for 2050.
The Japanese Shinkansen is something else. Doing my first decent trip on one this week and can't wait!
The other places where it might make sense are Sydney-Brisbane and maybe Adelaide-Melbourne since both are also 7-8 hour drives and about 2 hour flights. Last I travelled Adelaide-Melbourne the trip by train was 13 hours and by bus it was about the same because of the route and extra stops.
As another commenter has pointed out, in the smaller Australian cities you pretty much need a car to get around. So realistically the train journey is competing with the 2 hour plane ride rather than the 8 hour drive. Because you'll either drive and have a car at your destination or fly/train and need a hire car or taxis when you get there.
Don't get me wrong, I like trains and I wish Australia was less like Los Angeles and more like Europe, but it would take serious investment by the Government to make this happen and compete with the airlines.
They own some of their own rails. UP and BNSF operate 4 of their commuter routes. CSX owns most of a few of the Metra operated routes.
Once, I was delayed 2 hours on Christmas Eve by a 1 Mile + Long freight train that broke down while crossing our main line pulling into the freight yard south of O'Hare Airport. A victim of CSX's "precision scheduled railroading".
Back when Metra pre-recorded the automated announcements, they specifically had one for delays caused by "freight train interference". The freight operators don't give a flying fuck who they interfere with, because they are empowered to.
That lack of delays from cargo is also why they work a little better. One other big delay though is that basically none of the trains operate as expresses so they have loads of little stops along the way serving all the little towns along the route where little delays build up and by the end of the run they're sometimes hours behind schedule.
Not sure if this route goes the full 320 km/h but it was plenty fast!
Loved the convenience and ease though. Having to schlep to the airport and deal with all the hassle of flying sucks by comparison.
Rock up to the station, buy a ticket, wait 30 minutes and go.
I'm very sorry, but such timelines are extremely disheartening and sound like a joke. The problem is, factually, other countries can build out HSRs within 5-10 year horizons, from planning to finishing a route. If it takes 2+ generations to even get a single line... I'm not sure what I can say.
I understand bureaucracy and problem solving processes work differently in our countries, but incredibly sad to see how a person can't see a significant progress within their own lifetimes. I'm not sure when I became such a defeatist, but it is what it is.
the japanese have a world-class trainsystem and it's built by putting one foot in front of the other for decades, not expecting it to be built overnight.
of course, you can build it faster, but then it is more expensive. so what's the priority? it's easier to fund high speed rail projects in developed nations by long, sustained investment that is easily planned for rather than having to suddenly come up with billions of dollars and then deal with the political fallout of inevitable cost-overruns associated with rushing things.
That line from Tokyo to Osaka needed sustained funding for a neverending half decade and wouldn’t have worked as well with just a burst of effort.
By comparison, these days we have much more advanced technology so the Central Subway in SF only cost $1.9 b for the extensive 1.7 miles it covers and though construction started as late as 2012, the line was open in the blink of an eye, and passengers were riding it ten years later.
Indeed, it is a triumph of our modern methods of not expecting things overnight that had this much larger and more complex project delivered so much faster.
An old master carpenter I knew once used to say “Measure a thousand times, then before you cut measure another thousand times. Then cut once”. In the many decades since I’ve known him he has built a single table that IKEA would be jealous of on his own. Any time I gaze upon it I am reminded of our extensive success with rail in California through sustained careful effort, never rushing, always with focus. As the Bene Gesserit say, “Our plans are measured in centuries”
> the line was open in the blink of an eye
This post is so well written, that I needed to do a double take to realise it was well-craft sarcasm. Up vote from me!The Hokuriku shinkansen started construction in 1989 and opened reaching Nagano by 1997, just eight years later and in time for the 1998 Nagano Olympics. Of course they've built more extensions to it since then, most recently to Fukui just last year.
The Tokaido Shinkansen was on the drawing board in the late 1930s, and opened in 1964, after having been interrupted by the war and shelved for many years. A project starting today and opening in 2050 would be about that speed of development, although with the then-novel technology all being proven already one would hope things could be done a bit faster now.
While there are places where the build out itself looks fast, in reality I think most any train line ever build spends decades in "would be a good idea" phase of planning. The Hokkaido Shinkansen idea was on the books since the 70s, and we're still just up to Hakodate!
The Utusnomiya rail line (a local tram line) was in the proposal phase since 2001, and launched in 2023. It's been super successful (profitable!), but was still 20+ years for a single line.
Having said all of that, plenty of ideas gestate for a while, so hooking into an existing idea and getting that actually happening feels like a very good use of energy compared to trying to come up with your own special new idea.