by mike_hearn · 1y ago · 0 comments
If an entire nation trips offline then every generator station disconnects itself from the grid and the grid itself snaps apart into islands. To bring it back you have to disconnect consumer loads and then re-energize a small set of plants that have dedicated black start capability. Thermal plants require energy to start up and renewables require external sources of inertia for frequency stabilization, so this usually requires turning on a small diesel generator that creates enough power to bootstrap a bigger generator and so on up until there's enough electricity to start the plant itself. With that back online the power from it can be used to re-energize other plants that lack black start capability in a chain until you have a series of isolated islands. Those islands then have to be synchronized and reconnected, whilst simultaneously bringing load online in large blocks.
The whole thing is planned for, but you can't really rehearse for it. During a black start the grid is highly unstable. If something goes wrong then it can trip out again during the restart, sending you back to the beginning. It's especially likely if the original blackout caused undetected equipment damage, or if it was caused by such damage.
In the UK contingency planning assumes a black start could take up to 72 hours, although if things go well it would be faster. It's one reason it's a good idea to always have some cash at home.
Edit: There's a press release about a 2016 black start drill in Spain/Portugal here: https://www.ree.es/en/press-office/press-release/2016/11/spa...
A full grid black start is orders of magnitude more complex. You’re not just reviving one machine — you’re trying to bring back entire islands of infrastructure, synchronize them perfectly, and pray nothing trips out along the way. Watching a rig wake up is impressive. Restarting a whole country’s grid is heroic.
The words "it's a miracle it works at all" routinely popped up in those conversations, which is... something you don't want to hear about any sort of power generation - especially not nuclear - but it's true. It's a system basically built to produce "common accidents". It's amazing that it doesn't on a regular basis.
Funny thing is, those are the exact words I use when talking to people about networking. And realistically anytime I dig deep into the underlying details of any big enough system I walk away with that impression. At scale, I think any system is less “controlled and planned precision” and more “harnessed chaos with a lot of resiliency to the unpredictability of that chaos”
Components aren’t reliable. The whole thing might be duct tape and popsicle sticks. But the trick for SRE work is to create stability from unreliable components by isolating and routing around failures.
It’s part of what made chaos engineering so effective. From randomly slowing down disk/network speed to unplugging server racks to making entire datacenters go dark - you intentionally introduce all sorts of crazy failure modes to intentionally break things and make sure the system remains metastable.
Or the U.S. financial system. Or civilization in general.
Computer networking is not the same. Our networks will not explode. I will grant you that they can be shite if not designed properly but they end up running slowly or not at all, but it will not combust nor explode.
If you get the basics right for ethernet then it works rather well as a massive network. You could describe it as an internetwork.
Basically, keep your layer 1 to around 200 odd maximum devices per VLAN - that works fine for IPv4. You might have to tune MAC tables for IPv6 for obvious reasons.
Your fancier switches will have some funky memory for tables of one address to other address translation eg MAC to IP n VLAN and that. That memory will be shared with other databases too, perhaps iSCSI, so you have to decide how to manage that lot.
What’s your source?
Most operating systems are based on ambient authority, which is just a disaster waiting to happen.
I wonder however how being part of the "continental Europe synchronous grid" affects this, and how it isolates to Portugal and Spain like this.
But yeah there are a lot of capacitors that want juice on startup that happily kills any attempt to restore power. My father had "a lot" of PA speakers at home and when we tripped the 3680w breaker (16A 220v) we had to kill some gear to get it back up again. I'm also very sure we had 230v because I lived close to the company I worked for and we ran small scale DC operations so I could monitor input voltage and frequency on SNMP so through work I had "perfect amateur" monitoring of our local grid. Just for fun I got notifications if the frequency dropped more than .1 and it happened, but rarely. Hardly ever above though since that's calibrated over time like Google handle NTP leap seconds.
I love infrastructure
I realized the tech must have been winding up a flywheel, and then the pilot engaged a clutch to dump the flywheel's inertia into the engine.
The engineer in me loves the simplicity and low tech approach - a ground cart isn't needed nor is a battery charger (and batteries don't work in the cold). Perfect for a battlefield airplane.
---
I saw an exhibit of an Me-262 jet fighter engine. Looking closely at the nacelle, which was cut away a bit, I noticed it enclosed a tiny piston engine. I inferred that engine was used to start the jet engine turning. It even had a pull-start handle on it! Again, no ground cart needed.
---
I was reading about the MiG-15. American fighters used a pump to supply pressurized oxygen to the pilot. The MiG-15 just used a pressurized tank of air. It provided only for a limited time at altitude, but since the MiG-15 drank fuel like a drunkard, that was enough time anyway. Of course, if the ground crew forgot to pressurize it, the pilot was in trouble.
Again, simple and effective.
point of trivia: Messerschmitt, yes, but Bf-109, produced by Bayerische Flugzeugwerke.
you don't want to get your flugzeug works confused
And, despite the news reports, this is not a true blackstart. Some power survived.
Similarly, the US Navy maintains banks of pressurized air flasks to air-start emergency diesels. Total Capacity being some multiple of the required single-start capacity
Random fact: Those starters are a plot point in the 1965 film The Flight of the Phoenix, where the protagonists are trying to start a plane that’s stranded in the Sahara, but only have a small supply of starter cartridges left.
Is that what Dr. Sattler is doing in this scene from Jurassic Park?
Nice attention to detail by the filmmakers.
Small diesels could be an option but they're harder to pull start for a given size.
I once needed to jump-start a small marine diesel, many miles from land...
There was a small lever that cuts compression. You have to get it spinning really fast before restoring compression! It's definitely a lot of work!
EDIT - Here is a cheap modern small marine diesel [1]. The operation manual suggests that you don't have to do anything to get it spinning quickly, you just have to crank it 10 times, put away the crank handle, and then flip the compression switch. That's progress!
[1] https://www.yanmar.com/marine/product/engines/1gm10-marine-d...
They're my kryptonite, but I accept it's mostly my ignorance.
Maybe there are other concerns for an oil rig.
The hand-pumped air compressor is the tool of last resort. You can try an engine start if there's someone there who's able to pump it. You don't have to worry about how much charge is left in your batteries or whether or not the gasoline for the 2-stroke pump engine has gone stale. It's the tool that you use as an alternative to "well, the batteries are dead too, guess we're not going to start the engine tonight... let's call the helicopters and abandon ship"
Most vessels will experience a blackout periodically and the emergency generator start fine, normally on electric or stored air start, and then the main generators will come up fine. It's really not delicate, complex or tricky - some vessels have black outs happen very often, and those that don't will test it periodically. There will also be a procedure to do it manually should automation fail.
There are air starters on some emergency generators that need handling pumping. These will also get tested periodically.
The most complex situation during black out restoration would be manual synchronisation of generators but this is nothing compared to a black start.
In a real black start, the guys might very well grab a portable generator and just use that instead. But having the option to hand crank something rather than rely on batteries that might run flat is good.
And then phase will align itself a couple times a minute so what's difficult about that part?
That tends to be for very large engines, where the extra plumbing isn’t a problem.
A rare but sobering opportunity to reflect on something we usually take for granted: electricity.
We live in societies where everything depends on the grid — from logistics and healthcare to communications and financial systems. And yet, public awareness of the infrastructure behind it is shockingly low. We tend to notice the power grid only when it breaks.
We’ve neglected it for decades. In many regions, burying power lines is dismissed as “too expensive.” But compare that cost to the consequences of grid collapse in extreme weather, cyberattacks, or even solar storms — the stakes are existential. High-impact, low-frequency events are easy to ignore until they’re not.
That's 20 years without any significant problems in the grid, apart from small localized outages.
It's not hard to start taking things for granted if it works perfectly for 20 years.
Many people don't even have cash anymore, either in their wallet or at home. In case of a longer power outage a significant part of the population might not even be able to buy food for days.
Even if you have cash many shops would not sell anything in case of a mass outage because registers are just clients which depend on a cloud to register a transaction. Not reliable but cheap when it works.
The real question is how long can some of the smaller banks' datacenters stay up.
So, what's really interesting is that these sorts of social collapses have happened. In fact, they often happen when natural disasters strike.
When they do happen, mutual aid networks just sort of naturally spring up and capitalism ends up taking a backseat. All the sudden worrying about the profits of Walmart are far less important than making sure those around you don't starve.
As it turns out, most people, even managers of stores, aren't so heartless as to let huge portions of the population starve. Everyone expects "mad max" but that scenario simply hasn't played out in any natural disaster. In fact, it mostly only ends up being like that when central authority arrives and starts to try and bring "order" back.
You can read about this behavior in "A Paradise Built in Hell" [1].
Looting only ever happens when areas hve started being evacuated and most shop owners + law enforcement are elsewhere.
I often wonder if we should leave energy/telecommunications in a state where they can and do fail with some degree of frequency that reminds us to have a back up plan that works.
I had thought that the (relatively) recent lockdowns had taught us how fragile our systems are, and that people need a local cache of shelf stable foods, currency, and community (who else discovered that they had neighbours during that time!)
For something like this, a local electricity generation system (solar panels, wind/water turbines, or even a ICE generator) would go a long way to ensuring people continued to have electricity for important things (freezers)
If we're talking about a situation where the grid goes down, the mobile internet is most definitely not working.
And who's fault is that? Why did europe allow this?
Why will the US allow this, eventually?
In Spain it's now illegal to pay with cash for transactions over 1000EUR. Absurd.
In Norway they recently made it mandatory in most circumstances to accept cash for transactions up to 20,000kroner (~1700EUR): https://www.norges-bank.no/en/topics/notes-and-coins/the-rig...
I don't know how true the relationship between the cashless lifestyle and safety actually is, but it works and I feel ok; I'm not sure that the prospect of a few hours of national blackout once in 20 years will make me change my mind significantly.
You can do as many electronic transactions as you wish without internet or electricity, provided you have something with charged battery. Problem is the transaction cannot be verified without internet, but when internet gets restored, all transactions can be applied.
That technology exists for more than a decade, so banks will implement it in 20 or 50 years. Most sane people will not wait patiently for half a century till some software engineer implements electronic transactions with COBOL, and we will use some kind of blockchain much sooner than that.
Most of our modern economy and systems are built to reduce redundancy and buffers - ever since the era of “just in time” manufacturing, we’ve done our best to strip out any “fat” from our systems to reduce costs. Consequently, any time we face anything but the most idealized conditions, the whole system collapses.
The problem is that, culturally, we’re extremely short-termist- normally I’d take this occasion to dunk on MBAs, and they deserve it, but broadly as a people we’re bad at recognizing just how far down the road you need to kick a can so you’re not the one who has to deal with it next time and we’ve gotten pretty lazy about actually doing the work required to build something durable.
This is a solution that teenager put in management position would think of(along with hire more people as solution to inefficient processes), not a paid professional.
Systems like electric grid, internal water management (anti-flood) shouldn't be lean, they should be antifragile.
What's even more annoying that we have solutions for a lot of those problems - in case of electric grids we have hydroelectric buffers, we have types of powerplants that are easier to shutdown and startup than coal, gas or wind/solar(which cannot be used for cold start at all).
The problem is that building any of this takes longer than one political term.
Of course not, they're optimising shareholder profit.
How do you make those systems antifragile rather than simply highly resilient?
> This is a solution that teenager put in management position would think of(along with hire more people as solution to inefficient processes), not a paid professional.
What kind of comment is this? Toyota has been using and refining it for decades. It wasn’t invented yesterday by some “teenagers”. Such a state of HN’s comment section.
JIT is definitely not perfect as exposed during the Covid period, but it isn’t without merits and its goal isn’t “reducing safety margin”.
Then we have JIT in computing, such as JVM.
That should have been enough to scrub anyway, but there was clearly political pressure to launch.
I do agree that they need to specifically design anti-fragile.
We've had substantial disruptions, but they've not been particularly irrecoverable or sustained.
But I wonder from a reliability (or lack of cascading failures) point of view whether synchronous islands interconnected with DC interconnects is more robust than a large synchronous network?
I feel like to many technologists, the internet is still "the place you go to to play games and chat with friends", just like it was 20 years ago. Even if our brains know it isn't true, our hearts still feel that way.
I sometimes feel like the countries cutting off internet access during high school final exams have a point. If you know the internet will be off and on a few days a year, your systems will be designed accordingly, and if anything breaks, you'll notice quickly and during a low-stakes situation.
Also I suspect there is far more renewables on the grid now than in 2016.
This is potentially the first real black start of a grid with high renewable (solar/wind) penetration that I am aware of. Black starts with grids like this I imagine are much more technically challenging because you have generation coming on the grid (or not coming on) that you don't expect and you have to hope all the equipment is working correctly on "(semi)-distributed" generation assets which probably don't have the same level of technical oversight that a major gas/coal/nuclear/hydro plant does.
I put in another comment about the 2019 outage which was happened because a trip on a 400kV line caused a giant offshore wind farm to trip because its voltage regulator detected a problem it shouldn't have tripped the entire wind output over.
Eg: if you are doing a black start and then suddenly a bunch of smallish ~10MW solar farms start producing and feeding back in "automatically", you could then cause another trip because there isn't enough load for that. Same with rooftop solar.
The South Australia System Black in 2016 would count - SA already had high wind and rooftop solar penetration back then. There's a detailed report here if you're interested:
https://www.aemo.com.au/-/media/Files/Electricity/NEM/Market...
Non tied solar won't affect the grid at all. So this is a non-issue.
Grid tie requires the grid to tie to, otherwise it can't synchronize. So it stays disconnected.
Why would that prevent you from being grid-tie? I have 53 panels (~21kw) grid tied and pushing to the grid, but in the event of grid failure my panels will still operate and push into my 42kwh battery array which will power the entire house. ( The batteries take over as the 'virtual grid source). I can then augment the batteries with generator and run fully off grid for an extended amount of time ( weeks in my case ).
> 42kwh battery array
these are mutually exclusive. What you have is a hybrid system, which is something i explicitly did not mention. A grid-tie system is not generating an AC waveform when the grid is down, at all. it cannot, by definition, and by design, as the AC waveform requires the grid to synchronize to.
Hope this clears this up.
I really thought that sentence was going to end with "it makes it a lot easier to handle that segment".
Yeah you have some big problems if it's a complete surprise, but your status quo monitoring would have to be very strangely broken for it to be a complete surprise. Instead it should be a mild complicating factor while also being something that reduces your load a lot and lets you get things running quicker.
You need to calculate for it but I don't think this would be a problem
Does this really qualify as "black start" when they can rely on the bigger EU grid?
It really depends on the region though because almost all large hydroelectric dams are designed to be primary black-start sources to restore interconnects and get other power plants back up quickly in phase with the dam. i.e. in the US 40% of the country has them so it’s relatively easy to do. The hardest part is usually the messy human coordination bit because none of this stuff is automated (or possible even automatable).
* the load spike from everyone’s motors and compressors booting up at the same time
The power plants with direct connections have hard lines and black-start procedures that get power out to the most important customers like telecom infrastructure, which provides the rest of the comms. In a real world full restart it’s going to mean organizing workers at many substations to babysit old infrastructure so cellular is pretty much mandatory.
For Spain the external power and synchronization can come from France rather than generators which will help, but the process and complexities are still mostly the same. Call it a dark start, perhaps.
If Portugal (on the West) had to wait for that, it would probably have taken even longer.
> A black start is the process of restoring an electric power station, a part of an electric grid or an industrial plant, to operation without relying on the external electric power transmission network to recover from a total or partial shutdown.[1]
Only the first power plant in a black-start (like a hydroelectric dam or gas plant started by a backup generator) is truly "black started." The rest don't fit that definition because they depend on an external power source to spin up and synchronize frequency before burning fuel and supplying any energy to the grid. If they didn't, the second they'd turn on they'd experience catastrophic unscheduled disassembly of the (very big) turbines.
Only the first power plant can come online without the external transmission network.
In fact, if you’re not sure which will start first, you might go that way. They’re all disconnected from the grid at that time anyway.
Then again they might be less prepared precise because of the euro grid is available
It's far more problematic for the UK because all the interconnects are DC.
The UK keeping its own time just makes things easier for it IMO.
If your Factory uses too much power, theres not enough energy to run the power plants generation, which decreases your power production. Death spiraling until theres no power.
You have to disconnect the factory, and independently power your power plants back up until you have enough energy production to connect your factory up again.
Another "trick" is those burner inserters are black start capable. They can pick up fuel and feed themselves to keep running without an electrical network.
I also tend to put Schmitt triggers in low priority areas. They've got a battery on the main grid next to them and if the battery drops below 50% power they remain off until it goes back above 75% power.
As for 50%/75% triggers--the game doesn't model start/stop problems, only fancy circuit setups would give a hoot about being fed by flickering power. (But as a human....I was out adding to a big accumulator bank at twilight. Far away the bugs had a base close enough to my laser turrets that they kept attacking. The sun was powering my base but didn't have enough for the turrets. The whole bank would flicker for every bug. Usually the electrical indicator on the accumulators is a good thing.)
> The burner inserter is the most basic and slowest type of inserters. It is powered by burning fuel, compared to the more advanced inserters which are powered by electricity. It will add fuel to its own supply if it picks any up, which makes it useful for filling boilers with coal. This has the advantage that it will continue working even if the power fails, as opposed to electrically-powered inserters which will be unable to function.
In particular, when power demand drops below the supply everything starts running slower, which in turn means that the electrical inserters used to feed coal into the boilers run slower which drops the rate of electrical production. Burner inserters don't have that problem.
---
Schmitt triggers are really easy with stock multi combinators now. It isn't so much a "things have issue with flickering power" but rather "turn off the coal feed to the steel furnaces that would go to the electrical station instead" and "make sure that the coal unloading station doesn't brown out" and "turn off power to the electrical furnaces and labs to make sure that the coal mines don't dip in production rate when power dims".
The Schmitt trigger also makes for more reasonable "where is there excess oil that I should produce solid fuel from?" There's the optimal, but sometimes in the processing you can't crack any more crude to gas because the heavy oil is backed up, so turn on the appropriate cracking station when {conditions} and turn it off when {conditions}.
Man I need to go play some more.
Starting back up from zero is significantly easier, as you are completely isolated and have zero load. You turn the power plant on, and start slowly adding local load to ramp up. Synchronize with neighboring plants where possible to build the grid back up. The only issue is that a power plant needs a significant amount of power to operate, so you need something to provide power before you can generate power. In most cases you can just piggyback off the grid, but in an isolated black start it means you need a beefy local independent generator setup. That costs money and it's rarely needed, so only a few designated black start plants have them, paid for by the grid as a whole.
And you're assuming that there is a throttle setting that lets the plant produce so little power that it only runs itself. Think of the Falcon 9--the landing is hairy because it's impossible for it to produce less thrust than it weighs. The engine will go out if you try to throttle it too much.
- Cause of event not known yet.
- They noticed power oscillations from the Spanish grid that tripped safety mechanisms in the Portuguese grid. At the time, due to the cheaper prices, the Portuguese grid was in a state of importing electricity from Spain.
- They are bringing up multiple power systems and the Portuguese grid is able to supply 100% of needs if required. It was not configured in such a state at the moment of event.
- They had to restart the black start more than once, since while starting, noticed instabilities in some sectors that forced them to restart the process.
- Time for full recovery unknown at this time, but it will take at least 24 hours.
Would this suggest the grid hasn't snapped apart, or is it just not possible to tell from the data?
Coal, pumped hydro, and nuclear generation all went to 0 around the same time, but presumably that's those sources being disconnected from the grid to balance demand? https://transparency.entsoe.eu/generation/r2/actualGeneratio...
https://x.com/RedElectricaREE/status/1916818043235164267
We are beginning to recover power in the north and south of the peninsula, which is key to gradually addressing the electricity supply. This process involves the gradual energization of the transmission grid as the generating units are connected.
I see load dropping to zero on that graph, or rather, load data disappears an hour ago.
If the grid frequency goes too far out of range then power stations trip automatically, it's not an explicit decision anyone takes and it doesn't balance load, quite the opposite. A station tripping makes the problem worse as the frequency drops even further as the load gets shared between the remaining stations, which is why grids experience cascading failure. The disconnection into islands is a defense mechanism designed to stop equipment being too badly damaged and to isolate the outage.
Last actual load value for Spain at 12:15: https://transparency.entsoe.eu/load-domain/r2/totalLoadR2/sh...
Last actual load value for France at 12:00: https://transparency.entsoe.eu/load-domain/r2/totalLoadR2/sh...
https://transparency.entsoe.eu/generation/r2/actualGeneratio...
Everything dropped to zero except wind and solar, which took huge hits but not to zero. I expect those have been disconnected too, as they cannot transmit to the grid without enough thermal plant capacity being online, but if the measurement at some plants of how much they're generating doesn't take into account whether or not they were disconnected upstream they may still be reporting themselves as generating. You can't easily turn off a solar plant after all, just unplug it.
Either that, or they're measuring generation and load that's not on the grid at all.
It's not just about the power. System components cannot be brought to operating temperatures, speeds and pressures faster than mechanical tolerances allow. If a thermal plant is cold & dark, it can take days to ramp it to full production.
In some cases yes. Modern combined cycle plants can take as little as 30 minutes to ramp to full output. Older designs can take upward of 4-6 hours.
If you have steam as an indirection, that's when things take a really long time. Natural gas turbines are a more direct cycle.
1. The grid has to fully collapse with no possibility of being rescued by interconnection
2. As a result, a generation asset has to be started without external power or a grid frequency to synch to
3. An asset capable of this is usually a small one connected to a lower voltage network that has to then backfeed the higher voltage one
4. Due to the difficulty of balancing supply/demand during the process, the frequency can fluctuate violently with a high risk of tripping the system offline again
None of this applies in yesterday's case:
The rest of the European synchronous grid is working just fine.
News reports stated Spain restored power by reconnecting to France and Morocco.
By reestablishing the HV network first, they can directly restart the largest generation asset with normal procedures.
As they bring more and more load or generation online, there's little risk of big frequency fluctuations because the wider grid can absorb that.
I can only imagine the difficulty of bringing large parts of the grid back online, that rush current must be immense.
Or look at Apollo 13. The astronauts had turned off everything possible because they had lost their generator and only had their batteries. And it took a lot of furious planning by the guys on the ground to come up with a sequence of turning things back on that didn't cause the peak draw to go too high. Can't go too fast or it trips. Can't start too early because the power is limited, but can't start too late because the systems have to be up when they hit the atmosphere.
More than cash it was important yesterday to have the following in case it would have lasted longer:
- a battery powered am/fm radio with spare new batteries
- some candles and matches
- food reserves for a few days that don't need refrigeration: bread, anything in can, pasta, rice...
- some kind of gaz or alcohol stove, dry wood or bbq charcoal: you can always make a fire in the middle of the street where there is no risk of burning things around.
- water reserve (I always have like 24L of drinking water) and since I hate waste I regularly fill jerrycans when waiting for hot water in the shower that I use for manual washes (kitchenware or gears).
But with solar, how is the synchronization provided? In like a giant buck? Or in software somehow? Does the phase shift matter as much as in the electromechanical systems?
My intuition is that solar would make the grid harder to keep stable (smaller mass spinning in sync) but also may offer more knobs to control things (big DC source that you can toggle on/off instantly.. as long as sun is out). But I don’t actually know.
Currently the main driver of battery deployments is not so much energy price time arbitrage as "fast frequency fresponse": you can get paid for providing battery stabilization to the grid.
(for the UK not Spain: https://www.axle.energy/blog/frequency )
So if you have a smarter solar panel, or a smart battery, you can stabilize the grid. I’m assuming that all of the traditional software complexity things in distributed systems apply here: you want something a little bit smart, to gain efficiency benefits, but not too smart, to gain robustness benefits.
My intuition is that bringing the market into it at small timescales probably greatly increases the efficiency significantly but at the cost of robustness (California learned this “the hard way” with Enron)
> Phase matching is still required, wherever the phase difference is not zero there is a deadweight loss of power as heat
If the electronic controller is “ahead of” (leading) the grid, then that heat would come from the solar plant; if it is “behind” (following) then that heat comes from the grid. Is that right? And likely, solar plants opted for the simplest thing, which is to always follow, that way they never need to worry about managing the heat or stability or any of it.
I wonder if the simplest thing would be for large solar plants to just have a gigantic flywheel on site that could be brought up via diesel generators at night…
If you mean how does solar detect phase and synchronize to the grid: https://en.wikipedia.org/wiki/Phase-locked_loop
If you mean how does solar act to reinforce the grid: search for terms like "grid forming inverter vs. grid following inverter" though not all generators are the same in terms of how much resilience they add to the grid, esp. w.r.t. the inertia they do or do not add. See e.g. https://www.greentechmedia.com/squared/dispatches-from-the-g...
Low Grid frequency & voltage can cause an increase in current & heating of transmission lines and conductors and can damage the expensive things, this is why these systems trip out automatically at low frequency or low voltage, and why load shedding is necessary
I'm not saying you're wrong, but this isn't obviously correct to me.
Since solar going to a grid is completely dependent upon electronic DC->AC conversion, I would expect that it could follow a lot greater frequency deviation for a lot longer than a mechanical system that will literally rip itself apart on desync.
The real reason that small scale solar PV is grid following (i.e. it depends on an external voltage and frequency reference) is that this ensures power line safety during a power outage. That's it.
An inverter can be programmed to start in the absence of an external reference and it can operate at a wide range of frequencies.
The main difficulty is that the software of grid-following inverters tend to make them trip out very suddenly if the grid parameters get too far out of spec (they will only follow the grid so far), but once the grid is good they basically instantly synchronise.
But all large solar farms are likely to be mandated to switch from grid following to grid forming inverters eventually which will make them beneficial for grid security because they will help provide 'virtual intertia' that looks exactly the same to the rest of the grid as spinning mass does.
"Luckily", France is at an historically high level of production capacity at the moment and the connection between the two countries was reestablished fast.
According to RTE (French network manager), the interconnection was maxed yesterday at around 3GW of power.
Sadly, while Spain is part of CESA, it's not very well connected. I wouldn't be surprised if one the takeaway from the whole incident is that more interconnections are needed.
Here's why generators were running here despite the grid being available. A generator has a very short lifetime and in order to prolong it, some owners learned to run those in the very optimal schedule. Which sometimes requires a minimum amount of time to run in a single cycle. Thus if you started it you are committed to run for X hours.
I know. What's interesting re: Ukraine is because there are so many generators there are more options to getting power sufficiently restored for normal life than just rushing to restore the entire grid.
> Thus if you started it you are committed to run for X hours.
I'm skeptical this is the main reason. While fast starting a diesel generator is hard on it, there are other, slower, ways to start big diesel generators with minimal impact on lifespan. The blackouts in Ukraine are almost all on a schedule, so big buildings with dedicated staff and expensive generators can and do startup their generators in advance (I've personally heard this happen on occasion - big generators spooling up multiple minutes in advance of the scheduled blackout).
Also, it makes sense to turn on generators in advance anyway: gives you a chance to diagnose any issues.
Ukraine went through many black starts in the first winter of Russian strikes against energy. I guess they built a skill of recovering it quickly enough that it started happening faster and easier every next time.
I took down the servers though, so you probably can't easily try it. I don't know if I added a way to configure the lobby server. I should have! It's open source though. And there is a video about that thing on my YouTube: https://www.youtube.com/watch?v=6TPgfa7LbiI
The game is bad and nothing of what we planned on doing actually made it into the game. The video is long and boring too. But maybe someone finds this cool and is inspired by this and makes a game like this.
The first 15 minutes of the game were actually about getting the ship moving, first by reading the manuals of half a dozen different ship systems and then following some procedure outlined in those manuals (parts of which were simply incorrect), maybe having to do some things in sync with your other players and stuff like that. I think it would have been cool to add multiple reactors and start them up in sync and stuff. The different ship systems were actually Lua programs that interacted via a message bus. So kind of a unknown computer architecture?
> have some cash at home
For maybe the first 24 hours at a grocery store, and then not so sure. Would your neighbors sell you supplies and food? Maybe not? And so many places now depend on cashless transactions and doubtful they have pen, paper, lockbox, and safe as a contingency plan.
The entire EU runs on one synchronised grid so from that perspective a single 'province' went offline, not the grid.
The complex process of configuring the transmission network to bring grid power to each power plant in succession is the same.
https://en.wikipedia.org/wiki/Continental_Europe_Synchronous...
That said, lots of people hit the cafés and had to resource to cash payments. There was also lots of people buying bottled water at the shops.
So basically, you could divide people in two groups. Those that took it like an extra Sunday, and those that took it like the beginning of a war or something :-D
Most places are so dependent upon electricity that they can't even take cash during a blackout. And they don't even have the mechanical machines to take a credit card imprint anymore.
If you try to connect another generator to the grid, it needs to be at the same point (phase) in the sine-wave cycle, so that its power contribution is added, not subtracted.
If it's not in sync, huge currents can flow, causing damage. Sort of like connecting jumper cables backwards.