by actinium226 · 1y ago · 0 comments
Additionally the final plot of scientific gain (Qsci) vs time effectively requires the use of deuterium-tritium fuel to generate the amounts of fusion energy needed for an appreciable level of Qsci. The number of tokamak experiments utilizing deuterium tritium is small.
Here was my completely layman attempt to forecast fusion viability a few months ago. https://news.ycombinator.com/item?id=42791997 (in short: 2037)
Is there some semblance of realism there you think?
> The design operating current of the feeders is 68Ka. High temperature superconductor (HTS) current leads transmit the high-power currents from the room-temperature power supplies to the low-temperature superconducting coils 4K (-269°C) with minimum heat load.
Mind you, it's not useless! It produced a TON of very useful fusion research: neutral beam injectors, divertors, construction techniques for complex vacuum chambers, etc. At this point, I don't think it's going to be complete by the time its competitors arrive.
One spinoff of this is high-temperature superconductor research that is now close to producing actually usable high-TC flexible tapes. This might make it possible to have cheaper MRI and NMR machines, and probably a lot of other innovations.
I'm sure there'll be plenty of fascinating applications of high-Tc tape, however I'm not sure MRI/NMR machines will be one of those. There would still be a lot of thermal noise due to the high temperature. Which is why MRI/NMR machines tend to use liquid helium cooling, not because superconductors capable of operating at higher temperatures don't exist.
ITER has been criticized since early days as a dead end, for example because of its enormous size relative to the power produced. A commercial follow-on would not be much better by that power density metric, certainly far worse than a fission reactor.
There is basically no chance than a fusion reactor operating in a regime similar to ITER could ever become an economical energy source. And this has been known since the beginning.
I call things like ITER "Blazing Saddles" projects. "We have to protect our phony baloney jobs, gentlemen!"
It does, for high-current buses that interface with regular resistive power distribution. They are also planned for some auxiliary components (like the neutral beam injectors).
> ITER has been criticized since early days as a dead end, for example because of its enormous size relative to the power produced.
ITER is NOT designed for power generation. It's essentially a lab experiment to see how plasma behaves in magnetic confinement and test various technologies.
That's why ITER was designed with a very conservative approach to reduce the technical risk. We don't need it to be compact, this can come later. We just need it to work.
And yes, it is necessary. Plasma behavior can't be simulated numerically or analytically. It always provides surprises, sometimes even good ones: https://en.wikipedia.org/wiki/High-confinement_mode
That's the go-to excuse. But if you look at DEMO, it's power density is not enormously greater. ITER is so far out of the running that DEMO (or PROTO, etc.) will be too.
We're learning a great deal about something that's largely irrelevant.
I think this is overly harsh and somewhat unfair. You could make the same argument that anything operating in a regime similar to the Chicago Pile 1 could never be an economical reactor nor a bomb, but that does not mean skipping that particular development step is viable.
As far as fusion reporting goes, articles are at least somewhat consistent on the fact that ITER is a pure research project/reactor, while every 10-man fusion startup is being hyped up beyond all reason even if there is not even a credible roadmap towards an actual reactor in the 100MW range at all.
Personally I don't see fusion being a mainstream energy source (or helpful against climate change) in this century at all and maybe never, but ITER (even with all the delays) is at least an honest attempt at a credible size, and being stuck on older technology is an unfortunate side-effect of that.
The initial cost figures for ITER were obviously deliberate lies. When the true costs inevitably came out (after commitment had been made) this led to alternative approaches being canned. ITER has done grievous damage to fusion as a field, in a way eerily similar to how the Space Shuttle and ISS have done damage to NASA.
The true purpose of ITER wasn't to achieve fusion or push forward fusion; it was to preserve funding until those making the decisions had retired. If this required sacrificing long term goals, like actually delivering competitive energy (or, really, delivering anything at all), so be it.
Chicago Pile 1 ran for 12 years, ITER started ~12 years ago and plans to run into the 2030s at least. Budget and headcount would likely be vastly different too, I’d welcome any educated guesses. Sometimes quantity has a quality of its own, as they say.
I looked hopefully at the HR report https://www.iter.org/sites/default/files/media/2024-11/rh-20... to see if there was some sort of job categorisation - scientist, engineer, management. Disappointingly scant. PhD heavy. Perhaps the budget would be more insightful.
"Execution not ideas" is a common refrain for startups.
I wonder how much of the real engineering for ITER is occurring in subcontractors?
Much of the interesting tokamak engineering ideas were on small (so low-power) machines or just concepts using high-temperature superconducting magnets.
There's the common joke that fusion is always 30 years away, but now with the help of ITER, it's always 10 years away instead.
This is why much of the fusion research community feel disillusioned with ITER, and so are more interested in these smaller (and supposedly more "agile") machines with high-temperature superconductors instead.