by sbuttgereit · 1y ago · 0 comments
"Unification to standard gauge on May 31 – June 1, 1886 [United States]
In 1886, the southern railroads agreed to coordinate changing gauge on all their tracks. After considerable debate and planning, most of the southern rail network was converted from 5 ft (1,524 mm) gauge to 4 ft 9 in (1,448 mm) gauge, then the standard of the Pennsylvania Railroad, over two days beginning on Monday, May 31, 1886. Over a period of 36 hours, tens of thousands of workers pulled the spikes from the west rail of all the broad gauge lines in the South, moved them 3 in (76 mm) east and spiked them back in place.[6] The new gauge was close enough that standard gauge equipment could run on it without problem. By June 1886, all major railroads in North America, an estimated 11,500 miles (18,500 km), were using approximately the same gauge. To facilitate the change, the inside spikes had been hammered into place at the new gauge in advance of the change. Rolling stock was altered to fit the new gauge at shops and rendezvous points throughout the South. The final conversion to true standard gauge took place gradually as part of routine track maintenance.[6] Now, the only broad-gauge rail tracks in the United States are on some city transit systems."
https://en.wikipedia.org/wiki/Track_gauge_in_the_United_Stat...
The tolerances are just a bit tighter, the risks and liabilities are higher, and the workforce just isn't "there" - this is from a time when rail was a huge money earner and could afford to employ a huge number of people. Today? Not so much, pretty much anywhere in the World.
Sure, but they do it with big machines that ride down the rails now instead of lining up thousands of men with sledge hammers.
So what? I'd there isn't a machine, you build one.
Large industries like mining and shipping and the military don't just stop because they can't buy a needed item off the shelf because there isn't a market for it. They build stuff all the time.
I worked in a factory for a few years, and can tell you that if industries followed your "can't do" attitude, commerce would stop.
I'm not a train guy, but I'm pretty sure the machine that lifts the track up and allows them to swap out the ties is like 95% of what would be needed for a gauge changing machine.
I’d guess that overseas modern non-high speed trains could deal with it. The passengers might not put up with it though.
Well, back then the US had freshly banned slavery, so there was an ample workforce that could be hired for dirt cheap.
The Soviets and the Wehrmacht pulled off similar feats in WW2, but back then the rails and sleepers didn't have to be built to last many decades, so in addition to loads upon loads of forced labor from concentration camps and gulags, the work effort was massively reduced because easier technology could be used.
The Days They Changed the Gauge (1966) - https://news.ycombinator.com/item?id=8371773 (2014, 15 comments)
And a related discussion:
Why BART uses a nonstandard broad gauge - https://news.ycombinator.com/item?id=32031131 (2022, 253 comments)
The BART discussion was where I first learned about the North American 2-day gauge change. A truly inspiring feat for so many engineers to come together across such a large amount of land area to Make It Happen.
I also don't know where you're getting 125kV from. Many trains throughout the world use 25kV, especially high-speed ones (actually high speed, like 200+km/h), but BART uses 1000V, which is closer to a typical subway system.
I wonder if one can do anything like this with the current concrete sleepers and thermite welded tracks.
The sleepers are molded with preset widths, however, and would need replacement.
It might be easier to change today than it was in 1886. Back then, trains were really the only means of travel between cities. Today, there are less passenger trains than back then, though more freight (even with trucks and planes). But freight diversions/delays could be scheduled well in advance and have alternative means. Not to mention, since then we've developed variable gauge train tech. A subset of trains could run during the cutover.
It's likely more costly today, but less disruptive.
One such oddball is the TTC subway/streetcar gauge of 1495 mm in Toronto, Canada. https://en.wikipedia.org/wiki/Toronto-gauge_railways