by toomuchtodo · 1y ago · 0 comments
China launches world’s first grid-forming sodium-ion battery storage plant - https://www.ess-news.com/2025/06/03/china-launches-worlds-fi... - June 3rd, 2025 ("With a total investment of over CNY 460 million [$63.8 million] and occupying 34k square metres, the Baochi plant is designed for an installed capacity of 200MW/400MWh. Based on a dual daily charge-discharge cycle, it can regulate up to 580 GWh annually — enough to power 270,000 households, with 98 per cent of its energy sourced from renewables. The facility supports more than 30 local wind and solar power stations, alleviating the impact of intermittent supply and facilitating the integration of high shares of renewables into the grid.")
Tesla Megapack in Texas Supports the Grid and Keeps the Lights On [Gambit Energy Storage] - https://www.tesla.com/videos/gambit-megapack - September 30, 2021
Tesla’s giant battery in Australia [Hornsdale Power Reserve] reduced grid service cost by 90% - https://news.ycombinator.com/item?id=17051066 - May 2018
Tesla Powerpacks Balancing the Grid in Terhills, Belgium [video] - https://www.youtube.com/watch?v=EVHQFrGzThg - May 14, 2018
> Power plants "should have controlled voltage and, moreover, many of them were economically remunerated to do so. They did not absorb all the reactive power that was expected," Aagesen said.
https://arstechnica.com/science/2025/06/spanish-blackout-rep...
> The Iberian grid is capable of handling this sort of thing. But the grid operator only scheduled 10 power plants to handle voltage regulation on the 28th, which the report notes is the lowest total it had committed to in all of 2025 up to that point. The report found that a number of those plants failed to respond properly to the grid operators, and a few even responded in a way that contributed to the surging voltages.
> As the voltages rose, they approached a threshold at which power plants need to disconnect from the grid to protect their equipment. But the report found that some of the plants disconnected before the threshold was reached. And with each disconnection, the voltages on the grid continued to rise, causing plants to disconnect in multiple Spanish provinces. At that point, things spun out of control, with the grid frequency dropping. That led to it falling out of sync with its connection to France, causing the shutdown. The blackout had long since passed the point of intervention.
> It may be tempting to view the cascading failures as a sign of incompetence on the part of the grid operators. But these are the same operators who managed to restore the process of black-starting the grid to normal operations within a matter of hours. There should (and undoubtedly will) be questions about the low number of plants dedicated to grid stabilization, but that can be handled with a simple policy fix. An equally focused correction can likely address any problems at the problematic facility that triggered the whole chain of events.
> The real issue is why so much hardware on the grid didn't follow its operating specifications, either disconnecting early or failing to respond properly to the calls for stabilization.