by captain_coffee · 1y ago · 0 comments
Discussion on Reddit.[2]
They previously built something called "Trenta".[3] That generates two balls of plasma and fires them at each other. There's no fusion or fusion fuel. It's a test rig for plasma generation and manipulation. That was running two years ago.
"Polaris" is a scale-up of Trenta, with something to fuse, and with energy recovery. It's very unclear how far that project has progressed. If they were getting energy out, that would be big news. Helion is vague about how that's progressing.
[1] https://www.helionenergy.com/polaris/
[2] https://www.reddit.com/r/fusion/comments/1hlojqu/any_news_on...
That's rather underselling it. If they have a proven, working, commercially viable design for a fusion power plant, they could probably just write a paper about how it works and collect their Nobel prize for physics next year.
Then become a regular (but favored) customer, as the supply side becomes truly net profitable.
(Remember this is same same Satya Nadella who offered Altman an unspecified CEO-level position after he got fired... while publicly admitting he didn't know why Altman was fired! If I was a MSFT investor I would be pretty upset about this.)
Presumably 2025 MSFT is more sober-minded about Altman. I wonder if they're gonna try to wiggle their way out of the PPA. Otherwise I am truly baffled.
FWIW I agree with the author of that Data Center Dynamics post, it's quite likely that MSFT and Helion are essentially in cahoots by stoking investors with vaporware. But it also seems like Altman might have sold Nadella 50MW of magic beans.
[1] https://www.datacenterdynamics.com/en/opinions/microsoft-and... This is second-hand, the agreement is not public.
Here there's realistically no way to continue electricity production so the assets will likely be chopped up and sold, if possible. Nobody owns anyone anything and Microsoft doesn't have to pay a dime. They won't get their power of course, but there's no downside for them.
These types articles where a PPA contract is confused with an investment is really common, mostly for nuclear and renewables, but that doesn't make them any more true. Microsoft hasn't invested anything, likely because they know this is (pardon the pun) hot air.
If nothing else, that, after all the good they had done to him, should do it:
"OpenAi v. Microsoft: Altman ready to sue for unfair competition
...
OpenAI has put a potentially devastating weapon on the table: accusing Microsoft of anti-competitive practices and raising the attention of the Federal Trade Commission. It would be a low blow... "
https://en.ilsole24ore.com/art/openai-v-microsoft-altman-rea...
Seemed like there was a certain amount of magic thinking about neutron damage but a bit less than fission typically does. Guess we’ll see.
Another option is this was to sweeten the pot during OpenAI negotiations.
If fusion had all three today, it would still e a though sell; fission has them and is still failing economically.
How would that energy generated from nuclear fusion be transformed into electricity "directly"? By which process / series of processes?
What they're trying to do is known physics but very hard engineering.
They're also trying for aneutronic fusion, using helium-3. If the plant generates large volumes of neutrons, it chews up the first wall between the reaction and the outside. It also makes what it hits radioactive, so there's a waste problem. Aneutronic fusion uses reactions that (mostly) generate alphas and betas. This is, again, known physics but very hard engineering.
If they can get a demo machine going which solves either problem, that would be a huge advance. So far, that does not seem to have happened.
There are other startups in this space. It's probably the way commercial fusion power will eventually be done. Not via the tokamaks, like ITER.
[1] https://en.wikipedia.org/wiki/Direct_energy_conversion
[2] https://en.wikipedia.org/wiki/Magnetohydrodynamic_generator
> Energy is captured by direct energy conversion that uses the expansion of the plasma to induce a current in the magnetic compression- and acceleration – coils. Separately it translates high-energy fusion products, such as alpha particles directly into a voltage. 3He produced by D–D fusion carries 0.82 MeV of energy. Tritium byproducts carry 1.01 MeV, while the proton produces 3.02 MeV.
> This approach eliminates the need for steam turbines, cooling towers, and their associated energy losses. According to the company, this process also allows the recovery of a significant part of the input energy at a round-trip efficiency of over 95%.
Tbh, I very much doubt that this is a realistic path in the coming decade (but would love to be proven wrong). AFAIK no experimental reactor has yet generated any net electrical power at all, let alone with any big (ie dozens to hundreds of) MW MHD generators. Getting even one of these aspects working would be a major advance, let alone doing both at once.
It's the electromagnetic plasma equivalent of a reciprocating internal combustion engine.
Using a particle accelerator (decelerator?) in reverse. I'm an investor in Tri-Alpha Energy, and they have tested a direct converter with the claimed 90+% efficiency.
Overall, when you look at the total complexity and energy balance of the full reactor + fueling cycle, maintaining vacuum, keeping superconducting magnets at cryogenic temperatures, tritium extraction etc. then generating an order of magnitude more energy than inserted still seems necessary to achieve engineering breakeven.
X-ray emission is strongly dependent on electron temperature. One of the important aspects of Helion's scheme is the electron temperature is much lower than the ion temperature. Not only does this greatly reduce x-ray emission, it reduces plasma pressure at a given ion temperature vs. a plasma where the ions and electrons are in thermal equilibrium, thereby increasing the ion density and fusion rate. The pulses in Helion's scheme end (and the plasma energy is recovered) before the electrons can heat up.
Everything we know about current approaches to fusion seem to indicate they will have the same economic problems. The scaling factors of confinement, power and reaction rates push towards immense reactors with vacuum chambers the size of apartment buildings, massive superconducting magnets etc. hence the ITER project spiraling out of control trying to build one just big enough that at least have a fair chance of achieving engineering breakeven. The basic plasma physics works the same for Helion, and the best triple product they achieved places them two orders of magnitude behind tokamaks, albeit with much less capital.
So when and if the best approaches to fusion succeed, it looks like they will yield these massive plants that share the costs problems of fission. While they won't be able to meltdown, the regulatory constraints will be very similar, the intense neutron flux will activate the structure of the reactor and poses similar proliferation and decommissioning concerns, there is radiological risk to the civil population in the form of Tritium leaks etc.
And unlike fission, which is very well understood and mature, fusion plants will be much riskier economically, on par with the attempt to introduce fast fission breeders into commercial service, which notoriously failed.
So while the physics is indeed very different, we know enough to compare fusion and fission economically, and the outlook is very bleak.
Pro tip: it's not. It's because there is millions of man-hours of regulatory burden attached to every decision, to every bolt, to every instrument or valve installed.
There is a reason for all that regulatory burden, of course. It's the release of long lived and deadly radiation from a meltdown. If it wasn't for that regulation building a nuke plant would actually be quite inexpensive, relative to current costs- On the scale of a hydro dam.
Fusion has none of those costs because it has none of the same dangers. It's a wildly different problem with wildly different cost basis. The expensive part is research. Once that's done that cost is gone.