Now ask yourself this: how often do people do this at all? Pretty much never. Most of us only do it when you have to, because you aren’t making enough money, because your application is slow, because you can barely meet budget, or because you are trying to land on the moon and failing costs too much.
maximizing efficiency also maximizes the number of single points of failure in your system. Anything that goes wrong breaks an optimized for efficiency system.
You need to have resilience and redundancy to deal with variability, but those cost money.
Much better from the management perspective to ignore those risks, cash in on the cheap profits and blame "unexpected events" and get a bailout when things go wrong. They cash in on the easy money and have no downside consequences.
I'm wondering how many people read it to the bottom? It makes the case that productivity analysis tools already exist, maximally productive systems have some slack in them and 100% efficiency isn't just impossible, it's counterproductive (for the reason you state).
But the problem with AI is that it adds a random element which makes any kind of modelling much harder. Sometimes you get good results fasts, sometimes it wastes a lot of time and holds up the project.
You never know what you're going to get. So any kind of project planning becomes even harder.
But that's not even the main point. The subtext - which isn't stated - is that the C-suite has persuaded itself that AI is a system that is more controllable and predictable than human employees.
When in fact - as anyone working at the coal face knows - it's the opposite.
And that's a problem, for all kinds of reasons. The obvious ones, like the loss of expertise through career progression, have already been talked about.
The less obvious one being discussed here is that the more AI is used, the less predictable all kinds of projects become - both in time and quality.
And if the economy is now being designed on the assumption the opposite is true, that's not going to end well.
In previous phases of industrial revolution consistency was the bedrock benefit.
Trying to create a revolution out of inconsistency is a very risky click.
Reiterating for truth, and also to expand upon the point:
These are things that cost money all the time, but only pay off visibly in a crisis. And it has to be a crisis of the right kind (if your headquarters burns down in a wildfire, it won't help you to have 225% coverage on every role). So this makes it very difficult to justify to people who think only numbers—and only specific kinds of numbers—matter.
But redundancy and resiliency, at least in most cases, also make the lives of everyone working there better. They mean, among other things, that if one person needs to get surgery, or take their child to the doctor, or just go on vacation, there's still enough people there to keep the work flowing smoothly. The people still there won't be hopelessly overloaded, the work will get done, and the one person who's out won't have a mountain of catch-up work to go when they get back.
The only drawback is that it means you're paying people to work at a rate that means they regularly have downtime and aren't "fully utilized" constantly. (By definition.)
You also spend a lot more time on communication. If you have one person who is the resource for X, they can spend their time doing X and don't have to spend time on coordination. When the procedures for doing X change, only one person needs to figure it out, etc.
That doesn't mean having a single person is the right decision, the benefits of having multiple people are important; just want to be clear about the drawbacks of multiple people doing the work.
That does make you more disposable, but also more useful if you can embrace it.
Accurate analysis depends on accurate data. Which is why some people I know are required to account for their work activities in 7-minute increments, have frequent and detailed meetings to account for progress, project planning, etc.
Actually, doing that analysis has a cost that must be discounted from any perceived gains of efficiency, to be truly efficient. One learns to tolerate some waste to avoid the ultimate time-suck.
To say nothing of maintence and sustainability -- if you're always sprinting, you're doomed to fall.
Charts are for asking questions, not answering them.
That analysis phase can be done brilliantly, or disastrously. It’s down to whose hand is on the rudder.
I don’t know why you would do 7. That doesn’t divide into 60 at all. Nor 480.
There’s a reason “bean counter” is an epithet.
You may argue that "analyzing your tasks holistically" will make you more efficient at achieving your goals. But min-maxing is for tactics, and is antithetical to strategy. Very often, taking a nap or a bath or walk will yield an insight that changes the entire game, obviating weeks or months of efficient and diligent work. We've all experienced this, so why do we insist on "maximizing efficiency"?
It’s no good driving as fast as possible straight at a brick wall L.
I do it most of the time at work because I find joy in finding the best possible solution.