by PaulHoule · 1y ago · 0 comments
The problem with nuclear energy is not the availability or the cost of the fuel but the capital cost of the reactor and the high level of financial and operational risk involved with the construction. For instance there is an unlimited amount of handwringing over a closed fuel cycle costing a little more than an open fuel cycle but nobody points out that the capital cost of the reactor dwarfs fuel cycle costs for any fuel cycle -- no nukes hate reprocessing so they won't point this out and nukes don't want to remind you of the capital cost problem.
For every NPP that's had a nuclear meltdown there have been 20 that had a financial meltdown before they've even turned it on.
It drives me up the wall that big tech companies want to buy "a reactor" or an unspecified "SMR" but never an AP1000 (reactor that's actually been built) or even a BWRX300 (an SMR that might actually get built.) If there wasn't any bullshit a new build AP1000 would probably have a 10 year lag at least but...
... in the current international tariff situation it's almost impossible that any full-size or even moderate-sized reactor will be built in the US in the forseeable future because the US has no super-heavy press that can forge a nuclear reactor vessel. Japan, China, Korea, the UK, and many other countries have them and in the neoliberal world of a year ago we could have just had one made for us and shipped in by boat. The BWRX300 is the only western SMR that is far along and the pressure vessel will be made in Canada -- it's going to cost plenty no matter what but put 35% on top of that and you're doing the no nukes job for them. Way to go.
I want to see it work but I am not seeing realistic plans from the likes of Microsoft and Google, just the hot air from a 100W lightbulb when we really need 10,000,000 times as much heat!
Yes, in US and western Europe it's been practically impossible to build new reactors since the 90's for capex and regulatory reasons (both are related). However, we used to be able to build reactors significantly cheaper and faster and I'd argue we're on the path to do it again later this decade. There's no technical reason we can't solve this problem: there's bipartisan support for nuclear, willing financial backers, and no demand shortage. We're going to see 100+ gigawatts of new nuclear in the western world in the next 20 years.
I've looked long and hard and not found an explanation of the bungling fitting the facts better than that it's like a poker game: the vendor never believed in the sticker price, but the vendors figured that once there were chips in the pot the sunk cost fallacy would mean the buyers would never fold.
Thing is, they do, at least in the U.S.
https://en.wikipedia.org/wiki/Nukegate_scandal
I think NuScale was trying to be honest about costs but the buyer in Utah built a process in which they could control costs by folding early and they did. Europe, China, and other places have more engineering thinking and less financialization and they're more likely to "stay the course" but as an engineer I'm not sure this is right -- it might work for China but not for Europe.
On one hand I'm glad to see GE get the BWR, especially the work done on ESBWR, back into the game with the BWRX300, but the costs they are quoting are too freaky low and their talk about "design to cost" makes it seem like they just quote the cost number that they need to be competitive with the solar sticker price without storage which will lure in the public as opposed to being competitive to whatever the (unknown) solar + storage sticker price will turn out to be. (e.g. highly variable because it depends by "how frequent blackouts will your accept?")
Much of this regulation and process overhead is now being rolled back in the US (by both political parties) and Europe is slowly coming around to allowing new nuclear. NuScale is one of many next gen companies (I hope they're all successful), but the traditional large reactors are also great and can be built cost effectively.
The cost escalations and bungling were well in progress before the TMI. The NRC streamlined the reactor approval processes in the 1980s by trying to separate the licensing of a standard reactor from the licensing of the site -- nobody took them up on the offer.
In the case of AP1000 builds both Sumner and Vogtle were held up for years because they were waiting for Chinese factories to figure out how to make parts, in some cases they never figured it out and they had to source them elsewhere. Factory modular construction was supposed to prevent bungling at the site but replaced it with bungling at the factory.
In theory the factories got up the learning curve and if somebody ordered another AP1000 it would be different, in practice the AP1000 is a Chinese reactor and the Chinese gave up on it for the Hualong One which there are (oddly enough) two designs for, which goes back to the designs the French were using back when they were building many plants on time and on budget... which is maybe a good thing, but they look pretty quick to move on to the Hualong Two and before they get up the learning curve on that one they'll be switching to the Three...
I'll agree that the Europe hired somebody who thinks like Amory Lovins to design the EPR and really did bungle the politics more than the engineering, but that's not the story in the US.
Bar graphs showing decreasing regulatory cost on page 6. Pretty dramatic recent change.
https://www.nei.org/CorporateSite/media/filefolder/resources...
However they can't even put up wind turbines anymore, due to NIMBY issues, environmental concerns and whatnot. We had a ton of such projects but it's just about ground to a halt now.
And since our distribution network sucks, we've had a ~100x price difference between north and south for a long time now due to that, you can't just put it in the middle of nowhere.
As such I have very little faith they'll manage to put up a nuclear reactor in the near future, at least not close to initial cost and time. And none of that has to do with the details of building a nuclear reactor.
That said, there's change on the horizon. At least more and more people seem to be realizing that if they don't want wind turbines, they don't want huge swathes of solar panels and they don't want to alter more rivers then there's not a lot of options left on the table.
The right thing to do with something like the Vogtle plant for example would be to keep building them since you've just paid some very expensive costs learning what causes delays, but the knowledge of what gets the plant built - because it was built - is still there and fresh.
https://spectrum.ieee.org/amp/the-forgotten-history-of-small...
The problem is also: who pays for the hundreds of prototypes before the ”process” has worked?
But the people building power generation are doing it on a for-profit basis. Since solar is cheaper to deploy, faster to deploy, simpler to maintain and so on, that's what for-profit people build.
In other words, on the one hand you have large generators, requiring years of planning & permitting, a decade of construction, endless court battles from the anti-nuclear folks, generating returns 15 years from now, competing with the exact opposite (cheap, quick to build, beloved by eco folks, easy to run and maintain, off the shelf parts etc).
From a capital point of view its a no brainer. Capital follows profit, and solar is very profitable.
Nuclear may be good policy. Base Load may be very desirable. But unless govt is putting up the capital it just won't get funded. (Nuclear plants are being built, like in China, but using govt capital, which sees a return in more than just cash terms.)
There are lots of strong arguments for Nuclear. But Nuclear proponents need to address the capital requirements above all. Until the capital problem is solved, every other argument is useless.
If that's really the case then a Gen 4 reactor that runs at higher temperature, uses printed circuit or other advanced heat exchangers and a Brayton cycle gas turbine could win on the capital cost but it's easier said than done. There's not a lot of hope I think the LWR but the BWRX300 is at least trying to do it by deleting the heat exchanger and the only way you're going to get costs down radically will be by deleting things. Commercial Gen 4 reactors are at least 20 years out and we should have gotten started 20 years ago.
The timing undermines this theory. The US added one nuclear reactor to the grid in 1996 then zero until 2016 (sort by first grid connection date here):
https://pris.iaea.org/PRIS/CountryStatistics/CountryDetails....
The US built an additional 58 coal generating units between 1995 and 2009 (see section "Age comparison of coal plants"):
https://www.gem.wiki/Existing_U.S._Coal_Plants
Combined cycle natural gas units were already cheaper to build in 1995, but the gradually rising natural gas prices over the next ~12 years meant that coal could still compete on cost for electricity generation. The cheap fuel for coal units counterbalanced the slower, more expensive construction process. It wasn't until fracked natural gas drove fuel prices down that coal unit construction ended in the US.
The natural gas plants without steam turbines are precisely the load-following plants that run for a fraction of the time (or at a fraction of their capacity); the relative weight of capital vs. fuel costs is inverted. (Or those, like xAI in Memphis, which are rapidly assembled in rushed desperation. I wonder if that will be a trend in the datacenter boom: designs limited, not by costs under normal market conditions, but bottlenecks affecting rushed projects. Nuclear SMR's would seem to be worst at this—the designs they expect to use haven't even been built yet!)
It isn’t just the turbine but the heat exchangers, in a PWR the ‘steam generators’ are water-water heat exchangers that are usually larger in volume than the reactor vessel. Many LMFBRs had two stages of heat exchangers (sodium-sodium and sodium-water) even larger heat on the water though SuperPhenix has relatively affordable secondary heat exchangers and never had them catch on fire.
So yes, when SMR's are "off the shelf" (aka from "order" to producing) , including permitting, construction etc, within a couple years then they are appealing.
I don't think we're quite there yet.
Storage is making great strides but for it to get good enough to fully convert the grid we need qualitative advances in the underlying technology, not just manufacturing scale driving down prices.
From a purely financial point of view, base load is not appealing. Whereas cheap solar is appealing. If I have a billion$ to invest, I know which one I'm choosing. I'm maximizing return, not "societal good". Which is why govt is best placed to build base load, since they optimize for societal good, not profit.
To make base load appealing to investors we need expensive power at night. But that's countered by local battery storage.
To be clear, this is not a "what we need" argument. It's a capital argument. Private Power suppliers chase profit, and there's more profit in daytime power than nighttime power.
Wait, what? Who is going to accept having no power at night at their house? Ignoring the fact that the intra-utility trade does provide a direct economic incentive, nobody is going to live somewhere the power companies can’t keep the lights on 24 hours a day most days (in the developed world anyway).
In a world where both solar and wind are massively cheaper, that entire paradigm collapsed. Even more so when you can reuse the same hydro and gas that was working as peaking as "firming" to complement the new model.
I believe Rolls Royce is pretty close as well. But both have yet to deploy a single working example. And it doesn't seem we are anywhere close to see one yet.