by just_human · 1y ago · 0 comments
Yes, in US and western Europe it's been practically impossible to build new reactors since the 90's for capex and regulatory reasons (both are related). However, we used to be able to build reactors significantly cheaper and faster and I'd argue we're on the path to do it again later this decade. There's no technical reason we can't solve this problem: there's bipartisan support for nuclear, willing financial backers, and no demand shortage. We're going to see 100+ gigawatts of new nuclear in the western world in the next 20 years.
I've looked long and hard and not found an explanation of the bungling fitting the facts better than that it's like a poker game: the vendor never believed in the sticker price, but the vendors figured that once there were chips in the pot the sunk cost fallacy would mean the buyers would never fold.
Thing is, they do, at least in the U.S.
https://en.wikipedia.org/wiki/Nukegate_scandal
I think NuScale was trying to be honest about costs but the buyer in Utah built a process in which they could control costs by folding early and they did. Europe, China, and other places have more engineering thinking and less financialization and they're more likely to "stay the course" but as an engineer I'm not sure this is right -- it might work for China but not for Europe.
On one hand I'm glad to see GE get the BWR, especially the work done on ESBWR, back into the game with the BWRX300, but the costs they are quoting are too freaky low and their talk about "design to cost" makes it seem like they just quote the cost number that they need to be competitive with the solar sticker price without storage which will lure in the public as opposed to being competitive to whatever the (unknown) solar + storage sticker price will turn out to be. (e.g. highly variable because it depends by "how frequent blackouts will your accept?")
Much of this regulation and process overhead is now being rolled back in the US (by both political parties) and Europe is slowly coming around to allowing new nuclear. NuScale is one of many next gen companies (I hope they're all successful), but the traditional large reactors are also great and can be built cost effectively.
The cost escalations and bungling were well in progress before the TMI. The NRC streamlined the reactor approval processes in the 1980s by trying to separate the licensing of a standard reactor from the licensing of the site -- nobody took them up on the offer.
In the case of AP1000 builds both Sumner and Vogtle were held up for years because they were waiting for Chinese factories to figure out how to make parts, in some cases they never figured it out and they had to source them elsewhere. Factory modular construction was supposed to prevent bungling at the site but replaced it with bungling at the factory.
In theory the factories got up the learning curve and if somebody ordered another AP1000 it would be different, in practice the AP1000 is a Chinese reactor and the Chinese gave up on it for the Hualong One which there are (oddly enough) two designs for, which goes back to the designs the French were using back when they were building many plants on time and on budget... which is maybe a good thing, but they look pretty quick to move on to the Hualong Two and before they get up the learning curve on that one they'll be switching to the Three...
I'll agree that the Europe hired somebody who thinks like Amory Lovins to design the EPR and really did bungle the politics more than the engineering, but that's not the story in the US.
Bar graphs showing decreasing regulatory cost on page 6. Pretty dramatic recent change.
https://www.nei.org/CorporateSite/media/filefolder/resources...
However they can't even put up wind turbines anymore, due to NIMBY issues, environmental concerns and whatnot. We had a ton of such projects but it's just about ground to a halt now.
And since our distribution network sucks, we've had a ~100x price difference between north and south for a long time now due to that, you can't just put it in the middle of nowhere.
As such I have very little faith they'll manage to put up a nuclear reactor in the near future, at least not close to initial cost and time. And none of that has to do with the details of building a nuclear reactor.
That said, there's change on the horizon. At least more and more people seem to be realizing that if they don't want wind turbines, they don't want huge swathes of solar panels and they don't want to alter more rivers then there's not a lot of options left on the table.
The right thing to do with something like the Vogtle plant for example would be to keep building them since you've just paid some very expensive costs learning what causes delays, but the knowledge of what gets the plant built - because it was built - is still there and fresh.
https://spectrum.ieee.org/amp/the-forgotten-history-of-small...
The problem is also: who pays for the hundreds of prototypes before the ”process” has worked?