227 points · by tokenadult · 14y ago · 216 comments
Compare to the new Seoul Bundang line which is 32.8km with 28 stations in some of the most dense urban areas on the planet. It'll run a bit under $400 million to build or about 1/17th the cost.
Once open, it'll probably cost riders under a dollar for most trips, compared to over $3 on the DC Metro.
No matter how you figure it, cost of labor, eminent domain, legal, whatever, there's simply no way to figure the D.C. costs as making sense when a world away a similar line, in another developed country with far more difficult construction issues is much cheaper in every way possible.
http://www.theage.com.au/victoria/south-morang-finally-gets-... 1/2 a billion for extending the line 3km and building 1 station. (All in the suburbs - where there used to be a train line that was ripped up)
Where are you getting that cost from?
It could just be for the 17km most recent portion but still...the cost per km is a fraction.
> A huge part of the problem is that agencies can’t keep
> their private contractors in check. Starved of funds and
> expertise for in-house planning, officials contract out
> the project management and early design concepts to
> private companies that have little incentive to keep
> costs down and quality up. And even when they know
> better, agencies are often forced by legislation, courts
> and politicians to make decisions that they know aren’t
> in the public interest.
All you ever hear about at election time in the U.S. is "big government waste." My colleague from Spain tells me that in Spain everyone goes to work for the government, and that entrepreneurship is lacking. Perhaps that means that in order to have cost-efficient mass-transit projects in the U.S. we need a Spanish-style government and culture.This is an excellent point. When the US Federal or a state government agency decides they need to link point A and point B with a transportation project, the agency typically only provides a basic outline of project requirements. Outside contractors are used to develop the more detailed requirements, and even the RFP for design and construction.
This creates a situation where big engineering firms try very hard (and often succeed) in creating RFPs that only they are qualified for. Yes, this really happens. In fact, whenever I read an RFP the number one question on my mind is "is this written so that only XXX firm can win it?" The answer tends to be "yes" in many cases and we don't bother bidding on it.
The obvious solution would be to prevent companies that write RFPs from bidding on the project. The problem is that no one (or at least no one good) would want to bid on the RFP prep work! If given the chance to win a $250,000 RFP preparation project, or a $500 million general engineering contract/$10 billion construction contract, the highly qualified firms will wait to take a shot at the larger work.
I want to second this so it doesn't sound like conspiracy theory or sour grapes. Speaking from the perspective of somebody who worked for the state, and went through the process of putting out RFPs and final selection, at least half of RFPs are put out as a technicality after the deal has already been made informally with somebody's quid-pro-quo-friend/drinking buddy/nephew. It's the art of adding bizarre requirements to straightforward jobs, until you find a set that only one known vendor could satisfy - and using those to eliminate all of the other proposals before they ever get to the selection.
(The first time I was involved in writing an RFP for our own product, we kept on cringing as we piled more and more obscure features of the system into it. Anything that had any practical use at all was fair game. And in the end we were congratulated by the customer for how neutral and fair we'd made the RFP look like. I still boggle at the thought of what the unfairly restricted version would have looked like.)
--Interesting data point, just order of magnitude.
For a transit project, this technical agency would need expertise in the following areas (at a minimum):
- vehicle procurement
- infrastructure procurement
- construction management
- geology and geotechnical engineering
- noise & vibration
- pest control
- air quality
- fire safety
- dust control
- archeology
- animal migration
- water quality & watershed
And you would need enough staff in those areas to handle the workload. I would support such an agency, but many folks would not.
Personally, I wonder if the best way to keep the system at a higher efficiency would be to have a public works departement which is allowed into bidding alongside private companies. The public works department would intentionally be kept too small to handle all the work needed, but would serve as a similar competitive check as a regulatory agency. Because it's in competition with private bidders, regulatory capture is more difficult, and technical competency is maintained because they're actually executing projects.
I would really love to see a setup like this for mobile broadband too.
It doesn't happen all the time, but it happens a lot.
often times, the particular govt office/personal have a working relationship with a contractor, or have done business with them in the past [..] it may be the most effective way to accomplish a task
I've been on both sides of this issue and it's difficult to navigate, like you imply. Do you pick the low-bid firm who is likely to screw up the project, resulting in increased costs down the line? Or do you pick the more expensive firm who will do the job right the first time, but may subject you to "fraud, waste and abuse" criticisms?
Also, US taxpayers may be making up for it by paying more upfront but less per ride (unless you live in DC or San Fran):
City Cost per Ride
Mexico $0.15
Beijing $0.29
Seoul $0.55
Moscow $0.69
Tokyo $1.68
Barcelona $1.76
NYC $1.96
Boston $2.00
Paris $2.25
Chicago $2.25
Toronto $2.37
Berlin $2.95
DC $3.08
San Fran $3.18
Stockholm $3.96
London $4.41
Source: http://www.treehugger.com/cars/subway-fares-around-the-world...And yes, you're being exceedingly pedantic, given that the vast majority of users of the underground system never pay the cash price. When a "discount" applies to the vast majority of journeys, it is that price which matters when discussing the price.
--------
Tunneling in any dense urban environment is an expensive proposition, but the $5 billion price tag for just the first two miles of the Second Avenue subway cannot be explained by engineering difficulties. The segment runs mainly beneath a single broad avenue, unimpeded by rivers, super-tall skyscraper foundations or other subway lines.
See Manhattan Community Board 8 at http://en.wikipedia.org/wiki/List_of_the_most_densely_popula...
Tokyo for one. E.g. the very recently built Fukutoshin line, deep tunneled subway underneath some of the busiest areas of the city (the tunneling is complicated in part because it had to dodge myriad existing subway lines), including very elaborate and expensive stations, had a cost-per-km about 1/4 that of the SAS. The Fukutoshin line is also overbuilt in various ways because it will be interlined in the future with the Tokyu Toyoko line (an extremely high-ridership suburban line).
A number of recently built subway lines in the Tokyo area had many problems, and were considered extremely expensive—but they were still much cheaper than the SAS...
So it isn't "complexity," it isn't "density," and it isn't high wages (Japan is not a low-wage country!). It's not fares—Tokyo transit fares are roughly on par with NYC; they're distance-based, so sometimes higher, sometimes lower, but it works out to roughly the same thing. Arguably it isn't even unionization, as Japanese industry is heavily unionized, although of course Japanese unions are rather different than U.S. unions.
One difference may be that Tokyo actually keeps building subway (and other rail) lines, and thus has has kept around the necessary in-house organization and knowledge for doing so, and has a wide selection of competent contractors available. U.S. cities typically have none of these things, and end up relying on consultants (and may not even have the competence or freedom to choose the consultants well), and a limited selection of contractors. [The NYC contracting situation is reportedly pretty dire, with a very few contractors having figured out how to game the system.]
Similarly, the Muni in San Francisco is $2. BART is commuter rail, despite its name, so I don't think its fares should be counted as "subway" even though some of it is underground.
Finally, Tokyo has a zoned system, ranging from 130 yen for short JR trips to more than 1000 yen for Tokyo<->Chiba trips.
And none of this includes monthly passes, 10 ride discounts, or the MTA's 7% "bonus".
I did some research: the cost per mile to move a person on AC Transit was ~ $1.50 (total cost including subsidies, not what you pay). Compare that to a cost to pay for a cab to take you one mile of ~ $3.00.
So if you have two people in a cab, that cab is just as economically efficient as a bus. Literally, a car that waits for your call, comes right to your door, and chauffeurs you around, is as economically efficient as our bus system. This is crazy! We could replace AC Transit with a fleet of cabs.
Also, I've heard that the "Nextbus" system which makes those predictions for when the next bus is arriving makes most of their money fixing the next bus sensors. The reason the sensors are broken is AC Transit employees continually sabotage them because they hate being tracked.
Truly, it is an incredibly screwed up system. Anyways, I was too busy to run for the board of directors, but someone really need to fix AC Transit!
I recall that when San Francisco retrofitted its city buses so that all are accessible to people using wheelchairs, an economic analysis showed it would be cheaper for the city taxpayers simply to provide free taxi service to all wheelchair users. The reason for putting people who use wheelchairs on city buses seems to have been wholly political--to mainstream such persons into a form of transportation that makes them more visible to other members of the public (at least, the members of the public who use buses).
I have both an emotional reaction and a rational reaction to this policy trade-off. On the one hand, my own late father was confined to a wheelchair as a quadriplegic (after a slip-and-fall accident on an icy parking lot here in Minnesota) for the last six years of his life. So I totally get why friends and relatives of persons who use wheelchairs want public places, and by extension public transportation, to be accessible to persons who use wheelchairs. That allows many more family outings with grandparents and their grandchildren than might otherwise be possible, for example. But my rational reaction is still that we all have to work hard to pay our taxes, so "public" money (money derived from taxation) should still be spent responsibly. If devoting taxi service (and, I hope, someday a self-driving car service) with public subsidies helps needy members of the population more than bus service, so be it. Spend the least money to get the positive externality is generally the way to go in public policy.
However, I don't think that should be the general bus system. Loading/unloading a wheelchair can take several minutes each way throwing the bus off schedule. Furthermore, to accomodate the disabled you need more stops. So you have stops ridiculously close together (like 40 meters in some cases). This further slows down the buses a lot.
I think we need some sort of parallel taxi/bus service for the disabled and to focus on making the main bus service fast and on time. How to fund this though or make it work. I don't know.
http://www.fardtjansten.sll.se/sv/Information/Information-pa...
I think the idea is not to make disabled people go from point A to point B, but to integrate them into society. There is nothing worse for an injured/disabled person than to be isolated, they will get clinically depressed. It's not one of those "man up and tough it out, soldier" situations - societal acceptance is crucial to mental health. Yes, we should spend money responsibly and not spend more than needed to reach the goal, but the goal must be stated inclusively.
A self-driving car is the exact opposite of what is needed.
Put another way, the city I live in (Denver) has what is essentially a taxi service for disabled folks (http://www3.rtd-denver.com/elbert/accessARide). I know a couple of folks in wheel chairs -- and they use it a lot! I've never once heard them say they felt isolated because they weren't standard bus routes full of people. On the contrary, not being able to go where their friends were going is what would be isolating.
I have not found this to be the case in major cities outside the US (eg Mexico City, Prague, Amsterdam). I do not know why.
Does that include the cost of increased congestion from the increased traffic?
The reason I dug through this was to explore possibility of building an entire city where all motorized transportation is under ground, and surface area is reserved for pedestrians, wheelchairs, and bicycles. IIRC, the cost of tunneling came out comparable to the cost of housing, so it's not a completely unreasonable idea. Imagine a 10km grid of 20-40 story residential buildings spaced out with trees and parks and bike/walk paths among them for miles on end? And an underground entrance every 1000 meters. No cars on the street, no noise, no traffic lights - go/ride where you please. Now if only I had the budget to build a brand-new city I would start now. :)
In all seriousness, if you are going to build a city with no vehicles on the surface, Towers in a Park is not the way to do it. There are many successful examples of medieval cities with high enclosure, and no successful examples of modernist cities with low enclosure. People are very sensitive to distance, and the only way they will ever walk from one of those towers to another is if there is also something interesting or useful for them to look at every 20-30 feet along the way.
Not much more than a mile away from the former site of Cabrini-Green, in Chicago's Near North neighborhood, is Cabrini's urban-planning counter-example: Carl Sandburg Village. This series of mid-century high-rises and low-rises shares a lot of design concepts with Cabrini, but was privately built, with better architecture and higher quality, and following a conversion from rentals to condos, has been carefully maintained over the decades by its owners.
While Sandburg Village's residents are not the city's poor, they aren't necessarily affluent either: The place has a reputation as an affordable area for first-time buyers as well as retirees.
I personally don't enjoy living in high-rises. If I had to design city, it'd be more like San Francisco: buildings 5-6 stories high, tops. Lots of walkspace, lots of trees, definitely a lot more greenways as you describe.
But I don't see the point of having all that greenspace if the majority of people will be 20+ stories away from it.
My concept is to build a city as a 10,000m square with building spaced out at 100m from each other in a grid for a total of 10,000 buildings, each one of 20 stories, 4 flats per story, each flat 12 meters to the side, three persons per flat. This way I could fit 2.4 million people in lavish 1400sqf condos in the city size of 10km to the side, and have the bus to cross the city in 10 minutes through underground tunnels with no traffic light stops.
Large population density creates huge opportunities for development of arts, as there is more audience and a bigger chance of there being enough supporters for a given new art thing in one place.
In most places in Europe costs of mass transit projects are notorious for spiraling out of control, and unlike the Madrid example other Western countries tend to do exactly the opposite and usually spend a lot more money on prestigious design and architecture of public works than is common in the US.
And that's okay, because besides the notoriously crappy and corrupt management of these projects by government officials, the results are worth it.
Now, compare this to the new Silver line in DC. It's monstrously over-engineered, even though it runs on a dedicated right of way. Instead of running the train on a simple embankment in the middle of the road or on a simple raised platform, it runs on a huge elevated concrete platform: http://transportationnation.org/wp-content/uploads/2012/09/0...
And this is in a low-density suburban area!
Compare this to the El: http://marcel-marchon.com/img--117945132--Chicago-El-train--...
Transit does not need to cost a billion dollars per mile. Just build elevated metal-framework tracks above the existing roadways. It's cheap, durable, and actually much more pleasant for riders than going to a stifling underground subway station.
http://www.esquire.com/print-this/world-trade-center-rebuild...
Oh that's right, Bloomberg is the Mayor and would rather give the contract to someone more cough _deserving_.
Yes, government purchasing and management of projects is a disaster. I have first hand experience in this realm. As a taxpayer you almost want to cry when you see it happen. I won't get into the nitty-gritty of the details. I saw, as an example, a government agency pay DOUBLE what they would have paid for a commodity computer accessory. They had bids (mine, among others, I am sure) that cut their costs in half. Yet, they went with the bid that doubled their costs. Why? Because those doing the buying were so incompetent and insecure that they wanted one supplier to provide all the components rather than allowing the best suppliers to come in and provide them with competitive pricing. It was "cover my ass" at it's best.
Let's not even mention the ridiculous rules that make it nearly impossible for small businesses to participate and expensive for others to do so.
To make matters worst, this particular contract was awarded to a foreign supplier. The funds came from Obama's "American Reinvestment and Recovery Act". Money that was supposed to create jobs in the US went out of the country. When confronted with this reality they came back saying that the company in question had sales offices in the US and that they had formed a corporation in the US and that this qualified them as a US entity. Holy crap!
I firmly believe that we'd do far better if government wasn't involved in most of this stuff. I'm not sure how that can happen, but the idea is appealing to me.
I said that the article is one-sided because it completely ignores on of the real reasons why these construction projects are so expensive and take so long: unionized workers. To put it plainly, their purpose in life is to rape the US taxpayer for as much as they can get and, in the process, provide themselves with as much pay, benefits, vacation and short work days as possible. And we keep paying for them once they retire in the form of ridiculous lifetime pensions. The real cost of that tunnel is probably far greater once you take into account having to pay those workers' pensions for life.
Examples of ridiculous union behavior abound. If you've ever had to work with or within a unionized system you've probably experienced the state of disbelief most rational people experience when they realize what's going on.
Take, as an example, doing a trade-show in NYC. I have dozens of examples of union bullshit, but I'll just mention one. We did a show where we needed to have a light turned off above our booth. That's it. The request was that simple: Please turn off the light above our booth. Of course, a union electrician had to do this. The fee? $368. Three hundred and sixty eight dollars for the guy to go over to the breaker panel and flip a switch.
OK, here's another. You are not allowed to plug in your devices into the electrical system. You know, what you do at home and at the office all the time. Nope, a union electrician has the necessary expertise to install an extension cord and plug in your computer into the AC outlet. I forget what the fee was for that, but it was ridiculous.
Our solution? We did all of our booth setup work at night. The union workers in the night shift are lazier than shit. They don't want to work. So, they let you do almost whatever you want as long as you let them sleep on the job. Sometimes you'd have to slip someone a hundred dollar bill to be left alone. Far better than dealing with their bullshit.
I have not had to work with unionized construction crews. I can only imagine how much worst the whole thing must be.
The best thing that could happen to this country is if unions were outlawed. Of course, that will never happen. I'd sure be nice though. Imagine, people actually having to work for a living. And, produce, behave, be responsible, be capable, compete, etc. What a concept.
Dont' get me started about the planned California high-speed rail. It's a $68 billion money grab designed to feed unions and keep politicians who favor them in power. The money will never be recovered. The line makes no sense whatsoever. Sick.
The bit about union thuggery at trade shows is 100% true, and I've experienced it firsthand in Chicago. Union electricians must be hired (minimum one hour) to plug in a simple power strip. If your booth requires more than two hours to set up, you are required to hire (glacially slow) union laborers. We made it under the rules with one of those presto-setup tinkertoy-like lattice structures, only to find in the morning that someone ran over part of it with forklift. There are absurd rules about who can stand on the floor exhibiting; salaried employees only, otherwise you have to hire "professionals" out of their union pool.
Trade shows are a scam. Now that I'm an entrepreneur, I will never exhibit my business at one of these events. They are a huge distraction, there's no way the ROI is positive, and giving money to extortionists does not sit right with me.
You've mentioned a few other issues seen at trade-shows. And, as you say, yes, all of it is true. Union thugs will destroy --DESTROY-- your exhibit if you don't play by union rules. They will run stuff over with forklifts. Drop boxes with electronics and cause damage. They'll cut-off your power. And the list goes on. So, you have to learn to work within the system and enjoy the shafting.
For those claiming that "socialist Europe" is fine and they are highly unionized. Well, I've done trade-shows in Europe as well. Night and day when compared to the US., particularly if you compare to union-heavy towns like NYC and Chicago. Exhibiting in London, Munich or Amsterdam (all of which I have personally done) is a dream compared to what you can go through in NYC. For lack of a better description, there's a sense of having a common mission: having a successful show for all involved. In addition to that, I found exhibit hall workers in Europe to be far more polite, willing and able to help than their American counterparts. And, above all, I have never, EVER, seen exhibit hall workers sleeping on the job in Europe whereas I have seen that many times in the US (quite literally dropping to the floor in the middle of a booth to take a nap).
It's interesting how people voice all kinds of opinions until they actually experience reality. As you say, now that you are an entrepreneur and you've seen, first-hand, how fucked-up things are your opinion of trade-shows has changed.
I tend to agree with you with regards to ROI. I have personally spent upwards of $150,000 per exhibit about twice a year for a few years. In certain industries it's an arms-race of sorts. This was certainly true before consumers learned that the Internet could provide a very good buying experience. For a while, if you did not exhibit at key shows you didn't exist or potential customers would question the quality, size or viability of your business. Little did they know that the money burned at trade-shows would be far better utilized in product development. The ROI on these shows sometimes takes years to produce. I had one particularly interesting case with an Italian customer. I'd must have seen him at six trade-shows over three years before he bought anything from me. When he finally became a customer I asked him why it took so long to choose our products. He simple said that he needed to make sure we'd be around before making a commitment. How do you calculate the ROI on that.
But, I agree, today, trade-shows can be hard to justify. I have not done one in three or four years and love it. I have product that sells over the Internet with zero dollars dedicated to marketing through any medium (other than simply having a good website).
It's like trying to build a Silicon Valley somewhere outside of Silicon Valley. The environment is different. Some have tried, but it is hard or nearly impossible.
Unions in the US are a cancer that is killing this country. I don't know what the solutions is. I, for one, avoid buying any products that come from unionized work forces whenever I can. Sometimes there are no choices. I have to drive on the roads as they exist, for example, but, as much as it hurts me, you will not find me buying an American car.
In particular, we're looking to understand why transit construction is so much more expensive in the United States than Europe or Asia. You posit that it's due to unions. But this can't be the explanation, at least not without something more, because many of the countries with cheaper transit construction costs have stronger unions and higher levels of unionization. So your explanation doesn't have much going for it, at least as it stands. Is there some reason American unions are particularly cancerous in comparison to French, German, or Scandinavian unions, all of which are stronger than American unions? If so, what can we do to move American unions more in the direction of German unions? Perhaps strengthen labor laws and increase rates of unionization, to aim towards a more consensus-based and less adversarial framework?
If I were hazarding an explanation, however, I'd guess something to do with the U.S.'s court-based regulatory framework and federalist style of government, that dumps everything into agency decisions and lawsuits, and has that all happen at multiple levels. When Denmark approved a new Copenhagen metro line, the details were negotiated for some time (including with the unions). One the plans were agreed on, the project was wrapped into a law passed through the national parliament, which authorized the construction. It was then, by statute, definitionally legal in all aspects (unless it somehow contradicted the constitution). It was impossible to sue over the construction, because the metro-construction plan was itself written into the law, superseding any laws that might otherwise conflict. By contrast, in the U.S., new metro lines have to go through a series of agencies at many levels of government (local/regional/state/federal), and can be challenged on the basis of any number of existing laws.
And that's not to say that unions are always "good". I for example have many misgivings about unions here in Italy, but saying that all problems come from them is just trying to find a scapegoat imho.
Convincing low waged people that the unions are in some way anti-american is just pure evil genius and took an amazing amount of chutzpa by the politicians who claim to represent them.
Unions do suck, but even more so in the government sector where they hold the taxpayer hostage and its the government that gives in to their every demand (since they always take the easy way out) with almost no alternative for recourse, vs in the private sector where alternatives can and do pop-up and are routinely considered.
The difficulty would just be in smoothly scaling back from this 21st century behemoth of a government that has gotten just so goddamn big, bigger than anyone ever imagined a hundred years ago regardless if it was the pro-State or pro-Federal government people you were referring to.
I had an interesting conversation with this ex-union worker a few months ago. He worked in the printing industry all of his life. He told me the story of how his union effectively destroyed the company he was working for because they kept wanting more and more at a time when the printing industry was changing. He fought hard to push for compromise but he union would not relent. The end-result was that they went bankrupt. Everyone lost their jobs. And their pensions went to hell. This guy had a late realization that unions are really bad organisms that eat their host. He was sad to listen to. He'd been taken out of the cave by share force.
Why didn't management just make all employees joint owners of the company?
Part two of the article (the link was at the bottom) deals with unionized workers:
http://www.bloomberg.com/news/2012-08-27/labor-rules-snarl-u...
For example: "When asked by transit blogger Benjamin Kabak about its high construction costs, Michael Horodniceanu, president of the New York City Metropolitan Transportation Authority's capital construction division, gave a two-word answer: 'work rules.' Citing the example of the city's revered sandhogs, he said the MTA employs 25 for tunnel-boring machine work that Spain does with nine."
As an engineer I have to be good at my job. If I suck at it I either get fired, or, as a business owner, loose my ass. This simple reality does not exist in the unionized ecosystem. You can completely suck at your job and have a job for life. Not only that, you can retire and continue to earn a pension for life. Does that represent the values of our country? Is that what we think this nation is about? The land of the most incompetent and lazy? I think not. Take unions out of the equation and see how the incompetent go away or, all of a sudden, decide to actually work 'cause they'd have something to loose. Unions do nothing good for our country today. Don't buy union products if you can help it.
Here are some of the demands of the Chicago teachers union:
Smaller class sizes.
More playgrounds, recess time and physical education classes.
More art, dance, theater, music and foreign language instruction.
More funding for libraries.
Healthier school lunches.
An end to the “apartheid-like” Chicago Public School system today and to “discipline policies with a disproportionate harm on students of color.”
Guarantee pre-K and full-day kindergarten for all students.
Higher teacher salaries and more teacher “autonomy.”
Better bilingual and special needs programs.
Higher-quality school facilities.
From here - http://www.washingtonpost.com/blogs/ezra-klein/wp/2012/09/13...
I think that you claiming that the Chicago teaching union don't give a shit about the kids is basically a deliberate slur to try and further your own political stance against unionisation in general.
So your story is nice, but that's all it is--a story to set up your attack on unions.
By the way, one of the single greatest expenses of the Afghanistan/Iraw war is a private company with non-unionized employees. You may have heard of it: Halliburton. And the type of stuff they've done to their fellow Americans (i.e., Jamie Leigh Jones et. al.) makes union shenanigans look like high school pranks).
Maybe it has to do with Supply and Demand? Because Europe and Asia invest substantially more in their public transit networks, there's more of a market, more companies that build the networks, more competition, more experience, and more tried and true cheaper methods. While in the USA, we've got less public transit, less experience building it, a smaller market for building it, less companies that construct networks, and less competition between them, thus the cost is higher due to it being a specialty that few companies understand.
[1] http://www.economist.com/blogs/gulliver/2012/07/amtraks-high...
Maybe this explains the difference between the US and Asia/Europe rationally, rather than as some major difference in philosophy given the same facts in each place.
Short summary, it's not clear, in LA at least, if the GM/Goodyear "intentional destruction" scenario really did the Red Line in. The ridership had been decreasing for several years before the purchase of the Red Line. Long-time residents say predictable things -- autos were more convenient and faster than streetcars.
Short of doing your thesis on this, it will be hard to separate the truth from the legend on this story.
(Not a public transit hater.)
This is how corruption works here in USA. Cheaters move between government management positions and overpaid contractor positions. This happens all throughout the country, from local governments up to the vice president.
--Citation from the article.
The gouging doesn't stop once the infrastructure is built. U.S. transit is also expensive when delivered (it costs over $100 per person round-trip to go from New York to Harrisburg, PA; for two people, it's cheaper to drive). Finally, we pay again through exorbitant real estate prices because our transport infrastructure, in this country, is so poor.
As someone who works on transportation projects, I find this to be incredibly unfair. Yes, there are a few shady contractors out there, but there are a lot of things that can happen during design and construction that can increase costs through no fault of our own. For example: change orders. A project gets designed and approved, the contractor gets his contract and starts digging. Two weeks into excavation, the project engineer tells the contractor "oh, that tunnel needs to be built 20 feet deeper and moved 15 feet to the south." Why? It could be for any number of reasons, maybe construction uncovered a gas line that couldn't be moved, maybe some politician wanted the line moved further (or closer) to a friend's business, etc. There are also the inevitable lawsuits, environmental issues and so on.
One of my big beefs, and one of the factors that IME increases costs for architectural/engineering consultants like me are the hoops we have to jump through to demonstrate that we're not ripping off taxpayers. There are all sorts of audit requirements (including the dreaded DCAA audit), insurance requirements and so on that increase our costs and so we have pass on those costs to the taxpayers. Recently we had an issue when negotiating a contract for transit design project - my firm's is relatively new, and we don't have a revenue history with which to develop audited rates, so we intentionally set out rates low in an attempt to convince accountants that our lack of audited rates wouldn't be a problem. We spent a munch arguing with the prime's accountants who wanted our audited rates to we could demonstrate that our profit on the job wouldn't exceed 10% (they were obsessed with the 10% profit number), depsite the fact that our rates were 40-50% lower than other similar contractors. We had to get someone from the Federal government to step in and tell the prime that our rates were fine as-is.
Insurance requirements are the other big issue. General liability isn't so bad, but E&O can be costly for big engineering projects, even if you're exposure is low. However many projects have a "one size fits all" with respect to insurance requirements and require everyone to carry $10+ million in general liability and $5+ million in E&O. If you're the general contractor responsible for digging up streets which can have all sorts or negative effects, that's probably reasonable. If you're the graphic designer responsible for creating the signs for the project, that's probably a little excessive.
>For example: change orders. A project gets designed and approved, the contractor gets his contract and starts digging. Two weeks into excavation, the project engineer tells the contractor "oh, that tunnel needs to be built 20 feet deeper and moved 15 feet to the south."
But I think it's worth pointing out that change orders are probably THE primary mechanism of gouging used by contractors in 'lowest-bid-wins' scenarios, as you should know.
What often happens is that contractors lowball, knowing that they will make up the margin on the change orders which are not competitively bid. A well designed RFP can mitigate this somewhat by requiring menu pricing on add/deducts for the most common in-field changes, but it can't account for everything, and bidding contractors look for open ended RFPs and exploit them.
There may only be a few 'shady contractors' out there as you say, but a)low-bid systems bring them to the top of the short list, and b)I'd wager almost every 'reputable' contractor's change order margins are higher than for the exact same work that was competed in a public RFP.
Just my thoughts on that. Raised an eyebrow since change orders are the primary mechanism for inflating post-award margins.
Edit:
Also want to point out that my use of the word 'gouging' is kind of a loaded term:
>But I think it's worth pointing out that change orders are probably THE primary mechanism of gouging used by contractors in 'lowest-bid-wins' scenarios
Are these contractors gouging? They are not doing anything illegal, but it can fall into questionably ethical territory. But from many contractor's point of view, they are stuck bidding on a system that is designed somewhat unethically. From a systems standpoint, when the only factor in winning a bid is lowest cost on the delivery of a product that will unquestionably have change orders, you get a scenario where the following is actually happening.
1)Firms provide goods and service for margin 'a+b' which is averaged over the life of the project
2)Only margin 'a' is competed
3)Margin 'b' is projected but undefined and can be adjusted by the Firm after the award based on margin 'a'
Is it ethical to even ask a Firm to submit a bid based on margin 'a' set equal to margin 'b' knowing that the system is designed to produce competing bids distributing the total product margin unevenly between the two variables, weighting 'b' much more heavily and minimizing 'a' in order to win the bid and work at all?
I don't think so, and what happens is you get a system that is almost explicitly designed to inject increased total project costs and increased variability.
I think that under this system, it's an incredibly gray area on the how ethical increased post-award margins on change orders are. Just the fact that an increase occurs does not strike me as unethical, but there is absolutely zero doubt that some of the margin increases are absolutely unethical and drive the total product margin up well past what it would have been if bid under a possibly more efficient system (throw out high and low bids for example).
If gouging is going to happen, it's going to happen on a change order, but it's not so black and white.
This comes down to how well the contract is written. The Big Dig was getting screwed pretty early on by contractors doing exactly what you described, but learned from the experience and started tightening up those contract terms. As a result, some contractors continued to try to play that game, and when they couldn't make up for lowball bids using change orders, they went out of business. Other contractors learned their lesson and started pricing things more realistically.
It's not that all or most contractors are bad, it's that the least honest tends to win the bid.
Considering what is behind this article, and its audience, you might even feel heartened about prospects for some progress on the conditions.
Add to that the fact State laws are often rigged in various ways to give preference to union shops, and all of the sudden someone is low-bidding a $10,000 toilet seat.
1) Built a new town hall because they were double-desking at the old one. Lowest bid wins, realistic and competent bids lose. They lay the sidewalk outside while it's below freezing out. Official in town who's managing the project shows up, "What the hell are you doing! You can't lay concrete while it's freezing." "This is the only way we can do it on the budget, sue us if you don't like it." Cracked, shitty sidewalk, would be cheaper to rebuild it than sue. Shitty sidewalk persists.
Built a school, too. Lowest bid. HVAC system is so noisy that several classrooms are unusable, and the floors are all fucked up through half the school. $1.5 million in legal fees later, we settle for $500k in damages, not enough money to fix the defects.
But what would the best practice be to determine that the realistic and competent bids are objectively evaluated? How do you solve that problem in the real world (and not even talking about any other conflicts or issues)? Employ consultants or? My anecdote would relate to government bidding for some mfg. projects. It was very clear that the people evaluating the bids (at least in the small area I was involved with) took into account the reputation of the bidder in awarding the contracts.
Minor example: Town AV girl needed a new video camera. She knows what she's doing, researched, found the best model as far as pricepoint/features and a good place to buy it. We had to convene 2 subcommittee meetings and make her go way out of her way to find that model offered 2 other places so we had 3 bids, and document them, before just doing what she wanted to do anyways. Probably wasted an additional 10 hours of salary on the taxpayer dime. This is all by statute, it wasn't us being a bunch of bureaucratic morons.
1. Town Hall. Instead of building a new building, rent office space somewhere else that was privately built.
2. Public School. Same deal -- taxpayers pay more per pupil for public school than they do for private school, so send the kids to private school and close the public school.
There's no point in getting on to Government for being inefficient in a system like the US, but we can get on to them for doing the NIH thing by default. When the private sector does something better, LET THEM DO IT.
Wait, what? Town official witnesses substandard work and just let's it go on? How was that not grounds for at least withholding payment from the contractor?
we settle for $500k in damages, not enough money to fix the defects.
No retainage?
Shitty contractors to be sure, but in a properly-executed contract agreement, there should have been ways to mitigate the poor performance.
You don't bring in your generalist town counsel on retainer to handle a million dollar construction lawsuit. Would've been nice to get all that work for free, mind you, but he's not in the construction lawsuit business and didn't have 1.5 million of free time that year, or any expert witnesses laying around.
Town official witnesses substandard work and just let's it go on? How was that not grounds for at least withholding payment from the contractor?
Withholding payment means a more expensive lawsuit than the sidewalk was worth. We wound up just dealing with the shitty cracked sidewalk. Don't get me wrong, he reamed them out on the site, but they basically told him to get lost and when we explored our options, turns out we had to just take it.
Not even enough to cover legal fees. Would have been cheaper just to fix it.
If you really want to talk about "gouging" the taxpayer, instead look at highway funding and regulations that practically enforce sprawl by requiring parking spaces, and multi-lane streets through urban cores.
The author isn't trying to say that the cost isn't worth it- he's just saying that it could be done much cheaper if the system wasn't so screwed up.