by tooltalk · 1y ago · 0 comments
Before 9/11, most DR (disaster recovery) sites were in Jersey City, NJ just across the river from their main offices in WFC or WTC, or roughly 3-5 miles away. After 9/11, the financial industry adopted a 50+ miles rule.
I know this because I was working on online systems back then.
I also vividly remember 9/11 and the days that followed. We had a satellite dish with multiple receivers (which wasn’t common back then) so had to run a 3rd party Linux box to descramble the single. We watch 24/7 global news on a crappy 5:4 CRT running Windows ME during the attack. Even in the UK, it was a somber and sobering experience.
Latency is defined by physics (speed of light, through specific conductors or fibres).
Bandwidth is determined by technology, which has advanced markedly in the past 25 years.
Even a quarter century ago, the bandwidth of a station wagon full of tapes was pretty good, even if the latency was high. Physical media transfer to multiple distant points remains a viable back-up strategy should you happen to be bandwidth-constrained in realtime links. The media themselves can be rotated / reused multiple times.
Various cloud service providers have offered such services, effectively a datacentre-in-a-truck, which loads up current data and delivers it, physically, to an off-site or cloud location. A similar current offering from AWS is data transfer terminals: <https://techcrunch.com/2024/12/01/aws-opens-physical-locatio...>. HN discussion: <https://news.ycombinator.com/item?id=42293969>.
Edit to add: from the above HN discussion Amazon retired their "snowmobile" truck-based data transfer service in 2024: <https://www.datacenterdynamics.com/en/news/aws-retires-snowm...>.
IIRC, multiple IBM mainframes can be setup so they run and are administered as a single system for DR, but there are distance limits.
At a former employer, we used a datacenter in East Brunswick NJ that had mainframes in sysplex with partners in lower manhattan.
But an important factor is, that performance will degrade with every microsecond latency added as the active node for the transaction will have to wait for the acknowledgement of the mirror node (~2*RTT). You can mirror synchronously that distance, but the question is if you can accept the impact.
That's not to say that one shouldn't create a replica in this case. If necessary, synchronize synchronous to a nearby DC and asynchrone to a remote one.
For sure we only know the sad consequences.
I was told right after the bombing, by someone with a large engineering firm (Schlumberger or Bechtel), that the bombers could have brought the building down had they done it right.