That's nearly 20 years to develop a single airframe. Yes, it's the most sophisticated airframe to date, but 20 years is not trivial.
The F-35 had many issues during trials and early deployment - some are excusable for a new airframe and some were not. I suspect the issue wasn't "move fast, break things" but rather massive layers of bureaucracy and committees that paralyzed the development pipeline.
The F-22 was part of the Advanced Tactical Fighter (ATF) program which dates back to 1981. It's prototype, the YF-22 first flew in 1990, and the F-22 itself first flew in 1997. It entered production in 2005. Again, 20+ years to field a new airframe.
Something is very wrong if it takes 20+ years to field new military technologies. By the time these technologies are fielded, a whole generation of employees have retired and leadership has turned over multiple times.
Wartime is more agile, you quickly close the loop but downside is sometimes does not work and when it does not work, there might be a people cost. US has done it with fighters before, F-4U Corsair was disaster initially in carrier landings and killed some pilots in training. However, this was considered acceptable cost to get what was clearly very capable fighter out there.
At the end of the day it's all people cost. Just because it's fractional lives wasted in the form of man hours worked to pay the taxes to pay for unnecessary paper pushing labor instead of whole lives doesn't actually make the waste less (I suspect it's actually more in a lot of cases).
This is like asking what good do reserves do if you spend them down in a crisis.
The bureaucracy aims to keep waste and corruption to a minimum during peacetime. In war, the aims change--you're now not only ramping up production, but the penalties for fucking with a war are typically more drastic than lining one's pockets during peacetime.
You can absolutely make an argument about accepting reduced efficiency to dilute concentrated harms (e.g. keep a test pilot from dying), but none of the peddlers of process dare even make that argument so I suspect the math is questionable without hand waving or subjective valuation (e.g. face saved avoiding errors).
This thread is discussing bureaucracy as the cause of waste and corruption during peacetime.
Sorry, but is this sarcasm ? Pity that HN doesn't alow limited emojis to convey intent.
This is the problem though - the bureaucracy is guaranteed to add a lot of cost, both in its own personnel, the personnel in the companies employed to deal with the bureaucracy, and the additional time taken for all bids to be evaluated. This is guaranteed to slow down everything, with the promise that it will try to prevent issues. Which, if the bureaucracy is badly run, weaponised, or captured, is a terrible trade.
If your second sentence is correct, then let’s allocate taxes to digging holes and filling them in? Ad absurdum but I think it applies? Like it seems reasonable to have an opinion on whether a function should continue to be funded by tax dollars. In a properly operating economy this would open up skilled labor to work somewhere more useful. Unless they weren’t actually skilled, in which case yes you have a problem hmm…
Obviously this will have to change if war breaks out for real, but in theory they won't be scrambling to hire people and will have at least some production capability. They will be scrambling to expand the production lines, but they won't be starting from 0.
A lot of people see defense contractors as an enormous waste of money, but to the government it is a strategic investment.
Maybe there could be something like a weekend warriors but for machinists? One weekend a month, one week a year you build fighter jets. This does mean there needs to be private sector demand for those skillsets so the reservists have relevant day jobs.
Is this an official goal, or at attempt to handwave away the fact that we seem to waste trillions and decades to get anything done?
Not really the point, but an idea that springs to mind is selling fighter jets to allied countries.
They decided to make one airframe in three variants for three different branches. They were trying to spend money they didn't have and thought this corner cutting would save it.
> Something is very wrong if it takes 20+ years to field next-generation military technologies.
It's the funding. The American appetite for new "war fighters" is exceptionally low when there's no exigent conflict facing us. They're simply building the _wrong thing_.
That puts the US on good footing, ready to face peer and near-peer, next-generation warfare.
If Ukraine has taught us anything, it's off-the-shelf - ready today - weapons are needed in significant quantity. Drone warfare has changed almost everything - we're seeing $300 off-the-shelf drones kill millions of dollars of equipment and personnel. If the military needs anti-drone capabilities, it can't wait 20+ years to field them.
We don't just need to pick on new/next-generation military technologies either. The US currently produces between 30,000-40,000 155mm artillery shells a month, but Ukraine (at peak) expended 10,000 per day[1]. The loop is far too long...
[1] https://www.reuters.com/investigates/special-report/ukraine-...
Wars are incredibly expensive, and the US should not be producing weapons, in peacetime, at the rate they would be expended during an active war. What we should have the ability to rapidly scale production.
The best and cheapest weapons are the ones never used, but making no weapons at all is the most expensive choice in the end.
How should the US make the manufacture of, say, the primers for artillery shells "rapidly scalable" in a way that is different from building a large stockpile? Be specific. Would you nationalize factories but leave them idle? You certainly won't have time to build or retool factories and staff them during a peer conflict. How would you present this to Congress vs. running those factories in peacetime as a jobs program?
The flippant commentaries about drones help no one: they're a significant change in the intel environment, but nobody carefully inspects assumptions about cost efficiency or on the ground conditions.
Expensive drones are being used to fulfill roles which artillery fires could fulfill far more effectively, except both sides of the conflict don't have enough artillery but for vastly different reasons (whereas significant amounts of supplies are coming from a party which is more or less arming both of them: China's factories).
It should be noted that Ukraine has invested significant effort attempting to acquire US spec long range weapons like ATACMS and Tomahawk, and F-16 and HIMARS were both a big deal which took significant effort to get. Drones have created a new warfare dimension, but I find the way they're often discussed lacks of a lot of rigor or bearing on how they're actually being used.
That’s a problem easily solved.
We have the menace of the Red Maple Leaf people to the north, and perhaps a buffer zone south of the Rio Grand would stave off the caravans, give Texans some breathing room, and make more room for real Americans. Remember, the anti-Christ may show up at any time.
Mexico is another story, but even then I don't think there's much in the way of public support for a ground invasion.
90% of the genuine public couldn't find Iraq on the map on September 12 of 2001, but that didn't stop half of them from becoming utterly convinced that going on an imperial adventure on the other side of the world was integral to preserving their freedumbs.
Media literacy in the US is a complete and utter shitshow, and public support for inflicting incredible violence on other people is trivial to manufacture.
Hell, half the country is currently cheer-leading soldiers and goon squads deployed against it's own cities. They don't even think their own neighbours are entitled to be treated as human beings.
Isn’t this a self-fulfilling prophecy? Who would want to get into a conflict with someone who has guaranteed air supremacy?
1. the most expensive space station program in history, and
2. severely underfunded compared to the desired deliverable.
Is it? By what criteria? IMHO the point is to get new tech out quickly enough that you aren't falling behind other major powers in the international arms race. The F35 seems to be ahead of the competition because countries around the world are lining up to buy it over much cheaper alternatives from Russia (Su57) and China (J35).
Not to mention that the Su57 also had about a 20 year development cycle. Maybe that's just how long takes to develop a new stealth fighter?
Hell F-35B does vertical takeoff and still mostly uses the same systems as the other designs, that should tell you something.
And without the F-35B, what would be flown by the US Marines, and by most other countries' aircraft carriers, all of which require vertical take-off and landing?
Reality is that VTOL model is ultimately a niche variant whose mandated commonality with air force and CATOBAR carrier variants impacted negatively both non- and VTOL options.
However, slapping supersonic VTOL requirement on what was supposed to be F-16 replacement in the given timeframe meant Lockheed would automatically get ahead as every other vendor had to scramble nearly from scratch while L-M had fresh supersonic VTOL data from both their own lab work and experimental work on Yak-141
Design iteration cycle-times should be decreasing due to CAD, experimental cycles-times reduced due to the proliferation of rapid-turn 5-axis CNC mills, experimental cycles reduced due to simulation, business processes streamlined due to advancements in JIT manufacturing and six-sigma/kaizen/etc, and so on and so forth. That this isn't occurring is a giant blinking red light that something is wrong, and that we are going to get our lunch eaten by someone who researches, designs, and manufactures with a modicum of competence. Ostensibly China.
Just the software for the helmet alone provides a huge technical advantage that has little to do with how the aircraft is manufactured other than having the appropriate sensors, communication systems, and computing power. Yet through all that bureaucracy what would normally be 3 different airframes all get to leverage the same systems without the need for retrofits etc. It’s inherently a two step process to figure out what you need before you can finalize the design.
By comparison vs the F-35, the B-2 spirit was vastly more expensive and far more limited. The F-35 also costs less than the more specialized F-22, but that versatility takes time.
New technologies should make iteration time on this stuff faster not shorter... even for complex things like fighter aircraft.
The fact that there are over a dozen Chinese humanoid robotics companies that have shipped working products in the past 12 months should be a big red flag.
I will say though that during WW2 and the Cold War, the amount of tolerance for killing test pilots was much greater given the number of people dying during active military conflicts at the time.
- DoD / DoW is a chaotic project owner, trying to squeeze in colossal and sometimes self-contradictory lists of requirements, which it wants to change often.
- The US government is a poor customer, which runs out of money from time to time.
- The US Congress is a cantankerous financier, which haggles for the money every year, and demands the production to be distributed all over the place, to bring jobs to the constituencies which voted for the congresspersons.
- The companies that produce this stuff are few and mostly cannot be easily replaced, and they know it. This is because in the late 1980s the US government decided that it has won the Cold War and will not need the many competing manufacturers of military gear any more. That proved to be a bit shortsighted, but now it's a bit late.
I think that mostly means money is cheap in China. In America, if you try to start a humanoid robot company you'll immediately run into the "Why though?" question when you try to get money for it. The case for the economic relevance of humanoid robots is dubious at best, so to proceed with such a development program you need your own money or at least good friends with connections who don't care about money.
I'm sure it's been done elsewhere, look at Iran-Contra, but it just wouldn't be done for something like a defense contractor building planes. It would be completely unnecessary and likely illegal.
Conversely, the Navy's first SSBN went start to finish in something like 4 years.
And unlike the F-35, which could easily have been an evolution of the existing F-22 design, the Navy had to develop 4 major new pieces of technology, simultaneously, and get them all integrated and working.
1. A reduced-size nuclear warhead (the missile would need to fit inside the submarine for any of this to matter) 2. A way to launch the nuclear missile while submerged 3. A way to reliably provide the nuclear missile with its initial navigation fix at launch 4. A way to fuel the nuclear missile with a safe-enough propellant to be usable on a submerged submarine without significant risk to the crew
The USAF's Century series of fighters were turned around quick. So was the B-52.
Having been involved in defense innovation efforts during my time in uniform, I cannot overemphasize how much the existing acquisition system is counter-productive to the nation's defense, despite 10+ years of earnest efforts dating back to before Trump's first term.
Most of the aspects to it are well-intentioned and all, but as they say the purpose of the system is what it does, and what America's defense acquisition system does is burn up tax dollars just to get us a warmed-over version of something grandma and granddad's generation cooked up during the Cold War.
Its turned into a death spiral because as these programs get more onerous the cost goes up, and who in their right mind thinks it's a good idea to just let people go off on a $1B effort with less oversight?
Until it's even possible to deliver things cheaply through the DAS (or WAS or whatever it will be now) we'll never be able to tackle the rest of the improvements. I look forward to reviewing the upcoming changes but Hegseth isn't the first one to push on this, it's a huge rat's nest of problems.
You mean the ICP that's already been updated as part of TR3 to support Block 4 features? https://militaryembedded.com/avionics/computers/f-35-program...
For that you got an update to...
>2900 DMIPS, 1MB L2 Cache 512MB DRAM, 256MB Flash 128KB NOVRAM
So you got to upgrade from an 80486 level to something the equivalent of an early-2000s Pentium II.
Up until WW1, the US were not a global military power, and because of their location, they had little reason do become one. Additionally they were not involved directly in ww1, so they had little reason to develop quickly a military industry that was at the level of western europe
Experts generally expected that there would be effective COVID vaccines by the end of 2020, because vaccine development is not magic. There are several known approaches to creating vaccines, and it was reasonable to expect that some of them would work.
What set COVID vaccines apart was government commitment. Governments around the world bought large quantities of vaccines before it was known whether that particular vaccine would be effective. (Regulatory approval was also expedited, but that it business as usual during serious disease outbreaks.)
The equivalent with fighter jets would be the government committing to buy 200 fighter jets, with an option for many more, from everyone who made a good enough proposal. And paying for the first 200 in advance, even if it later turns out that the proposal was fundamentally flawed and the jets will not be delivered.