by cogman10 · 8mo ago · 0 comments
I think the ideal grid would switch from DC to AC either at a substation at central location for a community.
Why might someone do this?
One of the hardest problems to work through is a grid cold start. When a grid goes completely down it takes a monumental effort to bring it back up again. There's a delicate balance that has to be struck with load and other generators coming online. It's hard to do. The AC waveform is a finicky thing that gets pulled and mutilated by every motor or vacuum cleaner that starts running.
With a bunch of AC microgrids joined by a DC major grid, you can completely sidestep that problem. It suddenly becomes just a lot easier to ramp up power production because the deformations to the waveform happen in small local regions, not everywhere in the grid. And further, the other plants just have to watch the DC voltage, they don't need a whole bunch of equipment around syncing with the AC waveform of the grid as a whole.
Cold (aka "black") start is not a common occurrence. Vacuum cleaners are not much of an issue. Industrial consumers are usually mandated to sort out their apparent power factor so it's not too weird for the grid.
What does matter sometimes is phase/frequency trips. The grid frequency is an important coordination mechanism between generators. When it gets distorted by loads coming on/offline, sometimes this can cause other generators to trip out at 59/61Hz, and then you get the Spain blackout situation.
Batteries could solve this but the software/regulatory framework isn't entirely there yet. See e.g. the UK market for "fast frequency response".
Not necessarily. Big local consumers will be large relative to the microgrid, which will not have a lot inertia. This is one of the things that you really notice when you go 'off grid', your grid is essentially your house and whatever else you decide to power from it and unless there are a couple of beefy motors already running starting a new one has a high likelihood of tripping the inverter, even a very beefy one. Start-up currents for larger consumers can be really high and you need a lot of inertia in your grid to overcome that.
This is true of an AC grid as well. Big inductive loads will often have to buy special equipment before hooking up to the grid because of their impact. It'd be the same with a DC first grid. To overcome a large startup current they'd likely need to buy a bunch of capacitors. Which, funnily, is exactly what they'd have to do to run on straight AC.
A nice demonstration:
https://www.youtube.com/watch?v=Zez2r1RPpWY
A more detailed explanation: https://www.youtube.com/watch?v=mQpzwR7wLeo
Nope, HVDC uses the same style of cable as AC. I'm not sure why you'd think they'd be different.
The HVDC cables that can be expensive are meant to be submerged. A feat that only HVDC can do. HVAC can't be submerged due to the capacative effect.
But otherwise I agree. It's more a pipedream for me that HVDC becomes more common place as I believe it'd make grids ultimately more stable and resilient.
The devil is in the details here, AC tri-phase cabling can not easily be re-purposed for HVDC purposes because you only have a pair of conductors rather than three 120 degree out of phase lines. So while technically the cable itself can be the same the carrying capacity of a triple of conductors would be reduced and one of the conductors would be idle, so if this is an in-ground or overhead cable not specifically made for DC that is a lot of wasted carrying capacity.
There is also the new distributed restart plan: https://www.neso.energy/about/our-projects/distributed-resta...
It seems like you would black start some plant using its backup diesel generator to power pumps and controls, probably synchronize at least two units at the plant, then pick up some part of the transmission system. Perhaps the capacitance of the grid is and issue when it is unloaded, so the trick is to make sure enough real and reactive capacity is online for each subsequent transmission or load step. Probably a lot of transmission steps come with a significant amount of load too - not just picking up unloaded transmission lines. Sounds really fun, banging all the governors and exciters with once in a decade load steps