That’s not necessary. Solar panels are so cheap that you can massively overprovision for winter and still come out ahead of nuclear.
Only you don't. In latitudes that get winter, solar output is only about a quarter as much in the winter as in the summer. You often hear things like "twice as much in the warmer half of the year" to try and stuff October and March into the "colder half" and disguise how screwed you are in December and January. Worse, if you electrify heating then it's not just that solar supplies less in the winter, you also have more demand in the winter.
By this point you're not just overbuilding by a bit, you'd need five times as much or more in January as in July. "Five times as much" is already over what it costs to use nuclear. Then it gets worse, because you now have a price of zero during the summer and even the spring and fall because of the massive oversupply and lower demand, so you now have to recover the entire cost of the overbuild during the three months when you're generating the least amount of power.
Then it gets worse yet, because heating demand is higher at night and we haven't yet added the cost of storage.
So we end up using nuclear 1/4 of the time. But unfortunately, nuclear’s cost is in the capital expense, not the operating expense. We pay about the same amount for it regardless of whether we’re using it or not. So if we’re only using 1/4 the energy, the cost per watt of nuclear energy is effectively 4x larger.
This incentivizes further build-out of solar, catching those sweet winter profits (now 4x larger!), further squeezing nuclear’s usage, driving up its prices, and incentivizing even more solar.
Eventually nuclear gets squeezed out and solar’s profit margins go from “astronomical” (naturally, it’s power from the sun, nyuck nyuck) to “low margin.” But they’re still making money. Whoever built the nuclear plant is left with a very expensive stranded asset.
At least, that’s my understanding. I’m not a power company accountant. What I observe, though, is that power companies who do employ accountants aren’t building nuclear. They’re building shit-tons of solar. And I’m pretty sure it’s not because they’re hippies who hate nuclear.
The way energy markets work is that prices change based on supply and demand. So you build a lot of solar and then the price goes down at times when solar generation is high. (There isn't really enough solar in the grid for this to have happened yet in most places.)
Because nuclear has high capital costs but low unit costs, it continues generating all the time even if prices are lower some of the time. It needs to hit a particular average price but will take essentially any instantaneous price. It can't operate with an average price of $0.02/kWh but it can sell for that at noon in July as long as it's getting enough to offset it at midnight in December.
So, you add a bunch of solar to the grid and as a result the price of electricity during daylight hours in the summer falls below the average breakeven cost for solar. Nuclear is still getting more than that at night, when the price won't fall below the daytime price plus the cost of storage, and in the winter, when solar output is lower and heating demand is higher.
Because it's still recovering a lot of its costs on summer nights and even a little bit on summer days, the winter price nuclear needs never gets to be 4x as high, but it goes up some.
Now the solar companies are looking at that price and trying to decide whether it's worth getting. If they add more solar it's going to generate e.g. 4kW in summer, 2kW in spring, 2kW in fall and 1kW in winter. So for every 9kWh they generate, only 1kWh comes in winter, and that's during the day.
Suppose solar needs to average $0.04/kWh to be sustainable but we're already at $0.02/kWh in the spring, summer and fall. Then solar needs the price during the day in winter to be at least $0.20/kWh before wanting to add more. On top of that, if they do add more, then the price during other seasons drops. If those hit $0.01/kWh during the day then solar needs the price during the day in winter to be $0.28/kWh. And, of course, then the price in the other seasons would drop again, until solar would need to have $0.36/kWh in the winter because by then they would only be getting paid in the winter. Whereas nuclear still makes some in the summer at night.
On top of this the demand is higher in the winter at night, but it's not higher in the summer at night. So to use solar with storage, you would also have to amortize the cost of the additional storage during only the winter months. And the winter nights have more hours than the days, don't forget. So for solar to supply all power in the winter it needs the daytime price to be $0.36/kWh and the nighttime price to be more than twice that.
Then solar is intermittent. People still need heat when it's cloudy. Overbuilding solar sufficiently to handle the heating load on a cold cloudy day in winter? Nope. Hopeless. You'd have to use long-term storage in addition to short-term storage and that's a whole new category of expensive when we were already looking at prices nobody was going to like.
So what happens instead? Well, probably the daytime price in the non-winter months gets to something like $0.02/kWh and the daytime price in the winter gets to something like $0.20/kWh and you fall below the breakeven point for building more solar. Then nuclear takes the same $0.02 and $0.20 during the day and something more than that at night and continues to cover its costs.
Really the problem here is not that solar is going to push out nuclear in the winter, it's that natural gas could unless you have a price on CO2. Or more likely, without a carbon price people might not switch to electric heat instead of continuing to heat with natural gas and fuel oil.
So we kind of need a carbon price to do heating. Or to solve it from the other side (which would be even better), we need to get nuclear to be more cost efficient so it can out-compete natural gas since solar won't.
But I guess the whole calculation of 100% renewables is overprovision+storage. This wouldn't change with nuclear in the mix, nuclear would just generate all the time at whatever price it can get, just bringing the point of overprovision for renewables closer.
Then in countries in more extreme latitudes the calculation of if nuclear is worth it just becomes how cheap and viable the (long and short-term) storage part will get over the lifetime of a new nuclear reactor.
If storage gets so cheap that a nuclear reactor would be consistently in the red, even in the depths of winter, then it wouldn't make sense to build one today.
But I haven't done any calculations on that yet. For example for the Netherlands or Germany which still have a high reliance on gas but a large portion of solar+wind, how expensive nuclear could be for it to make sense to build a new reactor. And under which scenarios of development of storage prices it would potentially seize to make sense.
During the coldest winter month, solar energy produce (as per statistics from the solar industry in Sweden) somewhere around 3-7% of the amount produced during the warmest month. Households also consume around 2-4 times the amount of energy during the coldest month compared to the warmest month. Sweden is a country where only a small minority have air conditioning installed at home.
Those are the worst month vs the best month. Overall the winter is not that bad, but it is still pretty bad for solar. Talking with people who has had solar installed here, the general story is very similar. During periods where it do produce the market price is already exceptional low, so it isn't returning a major saving. When the market price is high, the output is low, forcing them to be connected to the grid and pay whatever the electrical company demand during the highest market peaks, as well as taxes and grid fees which themselves has increased to match the cost of high variability.
All this looks very different in countries with much warmer climates and where the major energy consumption from households are air conditioning.
You also can't ignore wind power which should be part of any plan to "overbuild".
So is comparing rooftop solar for a single property to grid solar for a country to a continent-sized grid of mixed renewable sources.
Battery and storage tech are barely getting started. Pumped storage is perfectly capable of smoothing out seasonal loads.
There's some capex for physical pumped storage - less than for a nuke plant - but once running it's comparatively low cost.
They've moved "We'll start building this electory cycle!!" to "large scale reactors" to "SMRs!!" to now targetting the final investment decision in 2029.
The latest step in the saga is the state owned power company refusing to get their credit rating tarnished by being too involved in the nuclear project. The latest move is them owning 20%, the industry owning 20% and the government owning 60%.
The industry still haven't comitted to their 20% due to the absolutely stupid costs involved.
With the government as a first negotiation move stepping in with a direct handout of €3B. On top of credit and construction guarantees, a CFD and adjusting it all depending on how costly the build is to guarantee a profit.
But it is quite easy to understand why. Taking what one of the nuclear reactors earns in Sweden and then applying solely the interest from a new build leads to a loss of ~€1.5B per year. Then you also need to run, fuel and maintain the plant.
Renewables are not just solar and hydro storage is also suitable.
You are also ignoring that improving housing stock with good insulation is a much better answer to excessive energy use in winter than attempting to find more supply in winter.
1. Sweden is just about the worst case, there's very few countries/people that far north.
2. There's this genius invention called "wires". HVDC has transmission losses on the order of 3.5% per 1,000km. You don't have to colocate the solar.
Sweden is worse but it's still a significant issue in e.g. New York or Paris or Auckland.
> There's genius invention called "wires". HVDC has transmission losses on the order of 3.5% per 1,000km. You don't have to colocate the solar.
It's more than 1000km from the places that get cold to a part of the world where it isn't winter.
Suppose we ignore that it's winter in the US Northeast and Southeast at the same time and run HVDC 2000+ km to Florida because it gets an extra hour of sunlight. Long distance transmission can't be used to counter seasonal output and regional weather at the same time because one requires the generation to be spread everywhere and the other requires it to be concentrated closer to the equator. If we concentrate the solar in Florida to mitigate winter in New England then we're screwed when Florida is overcast.
No it isn't.
Wires still might be worth it, but these are all close enough to the equator that you can just over provision locally without issue if you prefer.
> It's more than 1000km from the places that get cold
Solar panels work better in the cold. The issue is with how far from the equator Sweden is, not how cold it is.
Looking from consumption side, my home city of ~1 million people has several coal-fired plants, producing 1.5 GW of electricity and about 5GW of heating. Plus an hydropower station producing 6 GW. Most of that is consumed by an aluminium plant, but nonetheless, it's also part of the city. So that's roughly 12GW on a cold winter day (I suppose we do want to make heating cleaner as well), and probably 6 GW in summer. Heat pumps could be used to reduce power consumed by heating, but even the air-source pumps are not cheap, and they don't provide much efficiency gain in the cold. Ground-source pumps are extremely expensive and reqiure heat replenishment or the ground will freeze - such is the balance here.
So, the world's largest link to power just one city, out of tens of them. It quickly gets prohibitively expensive.
The only realictic answer, it seems, is annual-scale storage. I hope that "dirt pile storage" works well enough and succeeds, batteries are just too expensive and material hungry, hydrogen is problematic to store well either and we don't seem to have good enough scalable direct carbon capture to synthesize methane or propane.
During crisis nations are going to restrict exporting electricity and prioritizing their own residents. Electricity that is generated in Germany is not going to warm up Nordic countries if Germany doesn't let it.
Wires are also susceptible to sabotage, especially undersea ones (which are the current major connection points to Europe).
You sure overprovision factor of 200x is still cheaper? This is when looking at the peak generation. From what I understand solar has about 30-40% capacity factor in summer. Just to panels (I'm not sure about total cost of grid-scale solar) seem to be about $300k per rated 1MW or $750k per 1MW during peak. $150M per 1MW during December. OL3 cost about 11B € for 1.44GW (assuming 90% capacity factor) or 7M € per MW.
Unless there has been some huge overnight exchange rate change 7M € seems much cheaper than $150M. Latter of course would actually be much higher when you factor in rest of the equipment, labor etc. Some numbers I found say that it's probably 5x higher.
2. Do you realize the consequences of casually overprovisioning solar capacity when it uses orders of magnitude more land than nuclear per kWh produced ? Source : https://ourworldindata.org/land-use-per-energy-source
The real problem is seasonal variation: The total amount of stored energy is much larger (~100x) and you cycle it (and, hence, pay for storage) once a year, not 365x.
Wind + long range power transfer should help. At the cost of today's overpriced nuclear powerplants you can fund a lot of storage research and installation.
Perhaps you can use overprovisioned solar to eletrolyse water and use captured C02 (ideally from air) to generate methane or more complex hydrocarbons, for use in applications where electric power just won't work (e.g. long-range flight), or for long term power storage. Yes, there are significant conversion losses, but overall it is still in the low multiplies, not 200x.