by SJMG · 6mo ago · 0 comments
The problem was never solved and turned what was supposed to be a few days into weeks or months. Every mission the shuttle had to go back into the assembly building and have all tiles inspected and potentially replaced.
Shuttle had more unique perimeter shapes, but starship still has a lot of variation due to tickness. I don't know if that is easier to vary in production or still needs custom molds for the variation.
Obviously doesn’t guarantee they’ll find solution, but fast iteration will definitely help.
Its turn around time is ridiculous, it has to be maintained with specialized equipment/hangers, along with external contractor assistance.
Compared to the Gripen, as an example, which can land on a freeway and be up in the air again in a few minutes.
One was designed to be used in war, in desperate scenarios, with no ability to coddle it. The other, the F-35? Is designed around milking the taxpayer as much as possible, and employing people in as many politician's states as possible.
The shuttle was like that, I think. Which is really sad.
The gripen is a much less capable non expeditonary platform designed to maximize asymmetric losses if sweden is invaded. As a small country sweden has to follow a porcupine strategy to deter invasion.
Presently the actual comparable to the F-35 is attritable drones, which is why every mid-size and major power is developing them.
>Compared to the Gripen, as an example, which can land on a freeway and be up in the air again in a few minutes.
I have no idea where people got the idea that the F-35 requires a major refit after each sortie or that it needs climate controlled hangars, but there's literally no truth to any of it.
The turnaround time for an F-35 after a mission in a wartime scenario isn't going to be much different from any other older fighter jet. Refuel, rearm, get back in the air.
One of the key requirements for the F-35 programs was to minimize extra care needed for the RAM (Radar Absorbent Material). Unlike older stealth aircraft the F-35's ram is "baked in" to the aircraft skin, rather than being a coating. The F-117 and B-2 require climate controlled hangars because their coatings are old and delicate, the F-22 doesn't, but needs regular touch-ups for its coating, the F-35 is just left sitting outside most of the time regardless of where it's operating, a desert, the arctic, a jungle, the deck of a ship, you just leave it out there. The only common maintenance done on the F-35's RAM is replacing a relatively small amount of special RAM tape which is usually used around the edges of the access panels which are opened for other types of maintenance.
F35 can actually do something in such scenarios, as detecting them in the first place is hard.
It’s an extremely different design goal, the US doesn’t mind exotic weapons that require exquisite (and expensive) methods of servicing, they have the budget and the assumption that a well equipped air field will be immaculately maintained.
Meanwhile the Mig-29 designers assumed it’d operate from damaged/poorly maintained fields, so on the ground you can shut the primary air intakes and it uses ones on top of the plane to get air, drastically reducing the FOD risk on taxi/takeoff.
I do wonder how well the F-35 would fare in an actual shooting war against near peers when all the peacetime assumptions breakdown.