by rmunn · 5mo ago · 0 comments
But in recent years I have seen people (elsewhere, not on HN) claim that Y2K was a big nothingburger, and all the money spent on fixing the bug was wasted. No, that's not true either. All the money spent on fixing the bug was why it turned into a big nothingburger. Sure, some of that money was wasted, by executives who wanted an "official" Y2K-certified certificate, issued by a consulting firm that had nothing "official" about it except their own say-so. And so they spent $2 million learning what their own employees could have told them for $2,000. THAT money was wasted. But a lot of banks were running old COBOL code that used 2-digit years, and needed to be fixed. The fact that in January 2000, everyone's bank interest was still calculated correctly, and not calculated as if it was January 1900? THAT was entirely due to the vast amounts of money spent paying old COBOL coders to come out of retirement and fix the 2-digit years.
The lesson I learned from that is that it's possible for a problem to be overhyped, even massively overhyped, and yet still be a serious problem. The other lesson I should have learned is that people rarely get credit (I won't go so far as the article authors and say "nobody ever gets credit") for fixing problems that never happened.
So when someone predicts something will happen with a 90% probability, and then the 10% chances happens and the predicted event does not happen, people will talk about what a bad prediction that was and how they were clearly wrong.
It's the same logic that causes people to say vaccines don't work because they don't stop a disease with 100% effectiveness, or that there is no point to wear a seatbelt because people still die while wearing one.
A couple of possible confounding factors I can think of:
1. Plenty of countries use software developed elsewhere.
2. I suspect that the more recently you computerised your economy, the less likely it would be to have code vulnerable to Y2K.
The assertion may have been unfounded, but I think it's just as unreasonable to assert the opposite. Bugs have cascading effects and in a sufficiently complex piece of software they can create chaos with unpredictable outcomes.
https://news.ycombinator.com/item?id=4224707 has some discussion of the events, including the fact that the control design (where each pilot has an independent stick) was part of the problem. On a design like Boeing uses where both sets of controls move together, the experienced pilot would have noticed the less-experienced pilot pulling up on the stick because his own stick would be moving, and he would have said "No, nose down." And if they had nosed down to recover speed while still high enough in the air, they almost certainly could have regained control of the plane and saved 228 lives (including their own).
So in retrospect, I think my first sentence was wrong. The software did not glitch, it did exactly what it was supposed to do. It was pilot error that caused the initial stall, and multiple pilot errors that caused the failure to recover from the stall.
There may be examples of software error that has caused planes to fall out of the sky, but I don't know of any. The only plane crashes whose cause I know were due to hardware failure or pilot error, usually a combination of the two.
I earned my first house deposit helping the team fixing the water and gas company in Wales, UK. Their entire system was running off a set of COBOL programs on a mainframe, none of which had been properly documented over the years, and the whole thing used 2-digit dates. It would have caused actual deaths if not fixed; everything would have shut down, and no water and no heating in a British winter is potentially lethal. And then it would have sent everyone in Wales a bill for 100 years of water and gas.
They were bribing retired software devs to come out of retirement with huge stacks of money, because that was cheaper than training new COBOL devs and getting them familiar with the spaghetti system.
It worked, no-one died, life went on. So obviously it was all fake rolls eyes
But the project management team were extremely careful about only changing parts of the system that needed to be changed. Partly so that the scope was contained and second-order effects limited, and partly because the people making the changes were being paid vast sums to do this, and any reduction in work was saving real money. So when they say that it would all have stopped if the work wasn't done, I believe them ;)
Fair enough, they were certainly in a position to know, and their willingness to spend oodles of money on it proved that they believed it.