by simoncion · 5mo ago · 0 comments
My conclusion might be totally wrong because I'm converting from units that aren't meant to be converted, but...
If you filter down to only San Francisco County on this official-looking thingie [0], you see that it claims the city [1] has 5.126 TWh of consumption.
Your link [2] claims Hetch Hetchy Power System provides something like 395 MW of power generation capacity. I'm going to assume that that's a misprint and they meant to write MWh because that's the only thing that makes sense to me for a measure of power generation. While the last page of this PDF [3] indicates that the hydro generation component is capable of powering a bit more than twice the city's municipal demand, it seems like it's not enough to satisfy even 1/1000th of the demand of the entire city.
Perhaps I've totally fucked up my unit conversions (or relied on garbage data), but it looks like only the tiniest fraction of the city's power demands can be satisfied by the Hetch Hetchy dam. (Though, we could easily electrify way more of the Muni lines with the surplus capacity.)
[0] <https://www.energy.ca.gov/data-reports/energy-almanac/califo...>
[1] SF City and County are -AFAICT- the same thing. It's a little weird.
[2] <https://www.sfpuc.gov/about-us/our-systems/hetch-hetchy-powe...>
[3] <https://www.sfpuc.gov/sites/default/files/about-us/WeDeliver...> (found via [4]
[4] <https://www.sfpuc.gov/about-us/our-systems/storage-and-deliv...>
> Capacity factor could be in the high 90s in good conditions and maximum production but I expect it's a lot lower unless it's a wet year with very few big maintenance jobs needed.
Most rivers this far away from the equator don't receive the same inflows each season. For example, the spring will have very high flow due to melting snow in the mountains that feed that reservoir. I guess the winter has the lowest flow because snow melts much less in the winter.Also, PG&E is HIGHLY regulated. Its prices, its generation and its executive compensation are all set by the state of CA. That SF wants to complain about those numbers is pretty amazing. Remember, they still don't have enough money in the tree trimming budget so that those same lines don't start fires in other parts of the state. Its the same wire that connects HH to SF. And somehow the city is going to manage that wire better?
PS The tree trimming budget is set by the state too. Why is it so low? Renewables cost money and that's one of the budgets they raided to get the funds.
395MW * 8760hr = 3,640,200 MWh
to figure out roughly the maximum possible annual demand that could be served by the system? (For the purposes of this question, I'm just doing the -er- dimensional/unit/whatever analysis and ignoring production-capacity-reducing factors that you'd definitely have to factor in to get the real number.)If so, what a boneheaded, rookie mistake by me. Thanks for the reply.
I think the numbers you cite in [0] are in terms of total annual consumption.
PS Capacity factor is the ratio between capacity and production. Its probably the single most important factor when comparing different generation types. Its intentionally made confusing because NPPs have 90+ cap factor and renewables have about 10ish cap factor. This makes renewables seem competitive when they are not. That's why this is always presented in a confusing manor. PPS Its also the main reason power is so expensive in CA.
Demand is always instantaneous, and transmission lines from a generator need to be sized for the maximum instantaneous generation, so in terms of the size of (any kind of) generator it's the main thing you're interested in. Capacity factor brings in seasonal / daily output variation but that's a whole different thing.
Both Wolfram Alpha and units(1) indicated that conversion between MW and MWh was totally nonsensical, so I presumed either that that was a typo, or that 1MW of power generation run for one hour will satisfy 1MWh of demand... assuming that either that demand is evenly spread throughout the hour, or that you can smooth over spikes with storage.