Wind and solar could be deployed for a fraction of the proposed $100 billion investment and should be considered as part of the interim solution, while nuclear remains a long-term strategic project.
Rather than pursuing such an ambitious build out, a more practical approach might be to scale back the plan and focus on constructing one reactor each in Alberta, Saskatchewan, and Manitoba as an initial phase.
Canada has also regularly refurbished their CANDU reactors, which are large multi year projects. And they do it on-time and under budget
https://www.world-nuclear-news.org/articles/renewed-bruce-3-...
The Bruce A refurbishment in the late 1990s and early 2000s saw five-fold cost overruns. Bruce A was originally projected to cost $0.9 billion but ended up at $1.8 billion. The Bruce B project was budgeted at $3.9 billion and ultimately cost $6 billion.
https://canadiandimension.com/articles/view/ontarios-costly-...
Safety and operational issues also plagued the industry. The four units at Pickering had been shut down because of safety concerns—and then shut down again. By 1993, the performance of the Bruce Nuclear Generating Station, located on the shores of Lake Huron, had drastically declined. In 1997, Ontario Hydro announced that it would temporarily shut down its oldest seven reactors. By that time, the escalating costs of the newest reactors at the Darlington site were already a cautionary tale. Originally billed in 1978 at $3.9 billion the final cost in 1993 had more than tripled to $14.4 billion (1993 dollars).
Until the far right O&G lobbyist provincial government kneecapped the sector.