by section_me · 5mo ago · 0 comments
British person living in Berlin.
Edit: AFAIK, some of it - mainly high-speed trains - is designed according to DB specs and subsequently offered under a new name (and with changes) to other train companies. For example DB ICE 3 (manufactured by Siemens) / Siemens Velaro.
The Flixtrain company uses 40+ years old IC (intercity) cars - they have no air conditioning and it's really loud inside with open windows, especially so in tunnels. That is the kind of stuff that DB sells.
https://en.wikipedia.org/wiki/Eurofima_coach
Also no real opening of windows anymore, because early onset of https://de.wikipedia.org/wiki/Druckertüchtigte_Schienenfahrz... <- meaning pressure protection against passing trains at high speeds, entering tunnels, and such.
This is totally incorrect.
We buy our trains from French/Swiss/German/Spanish/Belgian manufacturers, or build them ourselves in eg Derby.
We do not buy our trains from DB.
Trains in Germany and the UK for main-line running both use 1435mm gauge. UK trains are not a custom size.
They were trying to run trains faster than typical continental high speed lines, which meant custom design work that needs loads of additional testing and certification. Rather than just use the Spanish or French high speed designs.
This is a project with a 200+ year shelf life. Designing to 300 or less would have been short sighted, and many of the changes to accommodate such high speeds actually reduce costs in the long term (slab track, headroom to catch up delayed services, ability for one trainset to operate more services per day etc).
The cost overruns of HS2 are primarily from plain old poor project management, complex planning law and constant political meddling, not engineering decisions.