by chongli · 4mo ago · 0 comments
It's like the tulip bubble of the 17th century [1]. Having a bunch of money tied up in useless tulip bulbs didn't do anything productive after the collapse.
And beyond physical infrastructure there are the intangible assets: the learning and the process innovation across multiple fields.
The upfront price for all that may end up steep, or fair, or even cheap… the truth is no one knows yet
It's like comparing a railway line from a mine to a smelter with a city's road network.
Utility scale power stations have outputs measured in GWs. Data centres are measured in MWs, although people are trying to build GW scale data centres at the moment. But even then a data centre will want a proper grid connection, otherwise they have a massive single point of failure in the form of the directly connected power station.
It’s also very unlikely that purpose built power station is capable of offering cheaper than grid power anyway, except in the very special situations like Hydro. So if you’re gonna build a datacentre, you will want a proper grid connection capable of providing all you needs. Even if you’re running on dirty gas turbines in car park initially while waiting the grid hardening happen. In the long term, that grid connection is always going to be the cheapest, most reliable source of power, ignoring it completely would be foolish.
Furthermore, to elaborate on my point above: building new power plants in tandem with data centres that demand GWs of additional power does nothing to address the needs of the grid itself. The grid is not built to handle all that new power, and the consumer electricity demand is not there anyway.